Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical HALL NO 111 112 B2 1ST FLOOR SOUTH BLOCK BAHU PLAZA JAMMU BAHU PLAZA JAMMU JAMMU JAMMU KASHMIR 180012 | JAMMU | JAMMU AND KASHMIR | 180012 | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
| 5 | Accepted-Technical | Accepted-Technical Responsive |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
12 Apr 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CEO JAKEDA
55 B/B Gandhi Nagar,Jammu
EOI for Installation of Decentralized Grid Connected Ground Stilt Mounted Solar Based Power Plants of capacity 500 KW to 2 MW on Barren or uncultivable and agricultural land falling within a radius of 5KM from Substations notified
2022_JKEDA_160260_1
EDA/GCSPP/KUSUM/07/21/1383
Open Tender
Solar Power Plants
EOI
365 days
J AND K
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
CEO JAKEDA
₹1 L
Virtual Link will be shared separately
2 May 2022
11 Feb 2022
13 Apr 2022
11 Feb 2022
12 Apr 2022
1 Mar 2022
11 Feb 2022 - 28 Feb 2022
28 Feb 2022
365 days
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .