Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.9 L+₹9,555 (2.01%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.9 L+₹15,389 (3.23%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SCIENTECS PROCESS CONTROL L3 | Deen Dayal L1 | M/S ACCURATE ENGINEERING L2 |
|---|---|---|---|---|---|---|
| 1.00Following works are to be carried out on minor overhauling of 1.6MVA, 6.6/0.4kV Service transformers (UST-13A,13B of unit-13 BTPS Obra.) | ||||||
| 1.01 | Minor O/H & centrifuging of 1.6MVA, UST-13A, 13B transformers: | 2 | Job | 15,900 ₹31,800 | 15,220 ₹30,440 Lowest | 15,550 ₹31,100 |
| 2.00Following works are to be carried out on complete overhauling of 1.6MVA, 6.6/0.4kV Service transformers, ESP-13A & 13B, Ash handling Transformer-13A &13B, of unit-13 BTPS Obra.) | ||||||
| 2.01 | Draining of oil from main tank and | 4 | Job | 7,995 ₹31,980 | 7,446 ₹29,784 Lowest | 7,770 ₹31,080 |
| 2.02 | disconnecting HV/LV chamber. | 4 | Job | - | - | - |
| 2.03 | Dismantling of complete transformer including core coil assembly, hot oil flushing and final assembly. | 4 | Job | 23,955 ₹95,820 | 23,324 ₹93,296 Lowest | 23,410 ₹93,640 |
| 2.04 | Complete dry out of core coil assembly in oven. | 4 | Job | 29,000 ₹1,16,000 | 28,580 ₹1,14,320 Lowest | 28,795 ₹1,15,180 |
| 2.05 | Filling of new transformer oil and filtration of oil till required BDV and PPM. | 4 | Job | 19,050 ₹76,200 | 18,068 ₹72,272 Lowest | 19,000 ₹76,000 |
| 2.06 | Electrical testing and connection of HV/LV jumpers. | 6 | Job | 4,190 ₹25,140 | 3,778 ₹22,668 Lowest | 4,100 ₹24,600 |
| 2.07 | Painting of transformer. | 6 | Job | 12,999 ₹77,994 | 12,920 ₹77,520 Lowest | 13,000 ₹78,000 |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
11 Aug 2025, 12:00 pmClosed
SE-IV BTPS OBRA
SE-IV BTPS OBRA
Complete and Minor overhauling 1.6MVA 6.6 0.4kV Service transformers (UST-13A 13B, ESP-13A 13B, Ash handling Transformer-13A 13B during overhauling of unit-13 BTPS Obra
2025_RVUNL_1057652_1
7/OMC4/EMD-I/600008099/25-26
Open Tender
Electrical Works
Fixed-rate
5X200MW OBRA BTPS
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹295
DY CAO CFA AND BO BTPS
₹9,000
30 Aug 2025
16 Jul 2025
11 Aug 2025
16 Jul 2025
11 Aug 2025
16 Jul 2025
Amount
Following works are to be carried out on minor overhauling of 1.6MVA, 6.6/0.4kV Service transformers (UST-13A,13B of unit-13 BTPS Obra.)
Minor O/H & centrifuging of 1.6MVA, UST-13A, 13B transformers:
Following works are to be carried out on complete overhauling of 1.6MVA, 6.6/0.4kV Service transformers, ESP-13A & 13B, Ash handling Transformer-13A &13B, of unit-13 BTPS Obra.)
Draining of oil from main tank and
disconnecting HV/LV chamber.
Dismantling of complete transformer including core coil assembly, hot oil flushing and final assembly.
Complete dry out of core coil assembly in oven.
Filling of new transformer oil and filtration of oil till required BDV and PPM.
Electrical testing and connection of HV/LV jumpers.
Painting of transformer.
Construction of permanent oven (2210x1530x1370) mm3
M/S ACCURATE ENGINEERING (BID ID -5408127)
M/S SCIENTECS PROCESS CONTROL (BID ID -5413997)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .