| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹3.2 LRejected-Finance | ₹3.2 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹3.3 LRejected-Finance | ₹3.3 L | L3 | Rejected-Finance 3rdLowest |
| 4 | L4₹3.3 LRejected-Finance | ₹3.3 L | L4 | Rejected-Finance 3rd Lowest |
| 5 | L5₹3.3 LRejected-Finance JAGADISHPUR ULUBERIA HOWRAH 711315 | ULUBERIA | HOWRAH | WEST BENGAL | 711315 | ₹3.3 L | L5 | Rejected-Finance 5th Lowest |
Tender Value
₹4.2 L
EMD Value
₹8,377
Closing Date
25 May 2026, 3:30 pmClosed
EE-II,LDCD
Office of the Executive Engineers Lower Damodar Construction Division Fuleswar, Uluberia, Howrah-711316
Re-Construction of wooden bridge of Samanta Para (for length 12.70m) over Mankur Khal at G.P-Buxi Hat in Block-Bagnan-I, Dist-Howrah under LDC Division.
2026_IWD_1024538_12
WBIW/EEII/LDCD/eNIT05/2026-27
Open Tender
CIVIL WORKS
Percentage
7 days
Mankur
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,377
11 Jun 2026
18 May 2026
28 May 2026
18 May 2026
25 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for taking out old wood work including cutting bolts and nuts and stacking within a lead of 100 metre etc. complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) | - | Cum | 3,247.66 | - |
| 2 | Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard.
(b) Above 17.5 cm. and up to 25 cm. diameter | 108.5 | Mtr. | 16.81 | ₹1,823.88 |
| 3 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
Note:-
(i) 20 cm av diametre | - | Mtr. | 363.5 | - |
| 3.1 | (ii) 15 cm av. Diameter | - | Mtr. | 258.62 | - |
| 4 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
(i) 20 cm av diametre
Note:
1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.(2) For string staging under specific instruction of engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00.per meter.
(3) For driving done by pile engine set (without staging) under specific instruction of Engineer incharge, the rates will be enhanced by ` 4.00 per meter . | 66 | Mtr. | 146.59 | ₹9,674.94 |
| 4.1 | (ii) 15 cm av. Diameter | 25 | Mtr. | 129.91 | ₹3,247.75 |
| 5 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
(a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus | 153 | Mtr. | 123.95 | ₹18,964.35 |
| 6 | Best Seasoned wood work in shutters, posts, plates, rafters, battens,trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels).
(b) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard wood.as approved by the Engineer-in-charge) | - | Cum | 58,516.19 | - |
| 7 | Supplying at site the following materials including carriage Overhead Charges and Contractor's Profit Long Nuts & Bolts | 1.45 | Qtl | 9,663.11 | ₹14,011.51 |
| 8 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge . (b) Two Coat. | 221.55 | Sqm | 65.55 | ₹14,522.6 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
12.pdf
Additional Documents • 0.34 MB
Form2911.pdf
Tender Documents • 0.56 MB
BOQ_2517890.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].