| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 CrAccepted-AOC | ₹7.8 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹8.5 CrRejected-AOC | ₹8.5 Cr | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/s Kaiser Construction Engineers and Contractor L1 | ARUN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 12,049.18 | Cum | 80 ₹9.6 L | 100 ₹12.0 L |
| 2.00 | Earth work in Mar, Ranker and Kanker mixed soil in digging or in embankment including lead up to 395m and lift upto 1.50 m with manual compaction and dressing. | 24,147.55 | Cum | 200 ₹48.3 L | 250 ₹60.4 L |
| 3.00 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar | 1,917.03 | Cum | 600 ₹11.5 L | 950 ₹18.2 L |
| 4.00 | Laying & spreading of Brick rora (Excluding Brick rora) in foundation | 2,278.85 | Cum | 270 ₹6.2 L | 300 ₹6.8 L |
| 5.00 | Laying & spreading Local sand or moorum plaster in sub grade below C.C. lining for proper completion of work as per direction of Engineer-in-Charge. | 694.24 | Cum | 1,400 ₹9.7 L | 1,700 ₹11.8 L |
| 6.00 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc. | 3,826.61 | Cum | 4,500 ₹1.7 Cr | 5,150 ₹2.0 Cr |
| 7.00 | Brick work (M-150) with 1:3 cement motar including all cost material labour and T&P etc. | 5,707.86 | Cum | 5,250 ₹3.0 Cr | 5,350 ₹3.1 Cr |
| 8.00 | Centering & shuttring for R.C.C. & C.C. work in bed block, slab & foundation C.C. including cost of all material and T&P etc. | 3,413.78 | Sqm | 700 ₹23.9 L | 850 ₹29.0 L |
| 9.00 | Reinforcement for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc. | 106.62 | MT | 67,000 ₹71.4 L | 76,000 ₹81.0 L |
| 10.00 | R.C.C. 1: 1.5: 3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc. | 742.4 | Cum | 7,000 ₹52.0 L | 7,150 ₹53.1 L |
Tender Value
₹9.0 Cr
EMD Value
₹18.0 L
Closing Date
25 Mar 2026, 11:00 amClosed
Superintending Engineer, Fourth Circle, Irrigation
Office of the Superintending Engineer, Fourth Circle station road civil lines Jhansi
LOT 2 Project works of permanent (pucca) structures under Pirauna and Orai Sections of Betwa Canal Division-I, District Jalaun.
2026_UPIDC_1121040_5
05/SE-IV/2025-26
Open Tender
Civil Works - Canal
540 days
Jalaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹18.0 L
2 Apr 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | |||||
| 2 | Earth work in Mar, Ranker and Kanker mixed soil in digging or in embankment including lead up to 395m and lift upto 1.50 m with manual compaction and dressing. | 1 | Cum | - | - |
| 3 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar | 1 | Cum | - | - |
| 4 | Laying & spreading of Brick rora (Excluding Brick rora) in foundation | 1 | Cum | - | - |
| 5Laying & spreading Local sand or moorum plaster in sub grade below C.C. lining for proper completion of work as per direction of Engineer-in-Charge. | |||||
| 6Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc. | |||||
| 7 | Brick work (M-150) with 1:3 cement motar including all cost material labour and T&P etc. | 1 | Cum | - | - |
| 8Centering & shuttring for R.C.C. & C.C. work in bed block, slab & foundation C.C. including cost of all material and T&P etc. | |||||
| 9Reinforcement for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc. | |||||
| 10 | R.C.C. 1: 1.5: 3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc. | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
05SEIVNIT2025-6.pdf
Tender Documents • 2.76 MB
BOQ_2103338.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid