| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 CrAccepted-AOC | ₹7.8 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹8.5 Cr+₹78.0 L (10.0%)Rejected-AOC | ₹8.5 Cr+₹78.0 L (10.0%) | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/s Kaiser Construction Engineers and Contractor L1 | ARUN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 12,049.18 | Cum | 80 ₹9,63,934.4 Lowest | 100 ₹12,04,918 |
| 2.00 | Earth work in Mar, Ranker and Kanker mixed soil in digging or in embankment including lead up to 395m and lift upto 1.50 m with manual compaction and dressing. | 24,147.55 | Cum | 200 ₹48,29,510 Lowest | 250 ₹60,36,887.5 |
| 3.00 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar | 1,917.03 | Cum | 600 ₹11,50,218 Lowest | 950 ₹18,21,178.5 |
| 4.00 | Laying & spreading of Brick rora (Excluding Brick rora) in foundation | 2,278.85 | Cum | 270 ₹6,15,289.5 Lowest | 300 ₹6,83,655 |
| 5.00 | Laying & spreading Local sand or moorum plaster in sub grade below C.C. lining for proper completion of work as per direction of Engineer-in-Charge. | 694.24 | Cum | 1,400 ₹9,71,936 Lowest | 1,700 ₹11,80,208 |
| 6.00 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc. | 3,826.61 | Cum | 4,500 ₹1,72,19,745 Lowest | 5,150 ₹1,97,07,041.5 |
| 7.00 | Brick work (M-150) with 1:3 cement motar including all cost material labour and T&P etc. | 5,707.86 | Cum | 5,250 ₹2,99,66,265 Lowest | 5,350 ₹3,05,37,051 |
| 8.00 | Centering & shuttring for R.C.C. & C.C. work in bed block, slab & foundation C.C. including cost of all material and T&P etc. | 3,413.78 | Sqm | 700 ₹23,89,646 Lowest | 850 ₹29,01,713 |
| 9.00 | Reinforcement for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc. | 106.62 | MT | 67,000 ₹71,43,540 Lowest | 76,000 ₹81,03,120 |
| 10.00 | R.C.C. 1: 1.5: 3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc. | 742.4 | Cum | 7,000 ₹51,96,800 Lowest | 7,150 ₹53,08,160 |
Tender Value
₹9.0 Cr
EMD Value
₹18.0 L
Closing Date
25 Mar 2026, 11:00 amClosed
Superintending Engineer, Fourth Circle, Irrigation
Office of the Superintending Engineer, Fourth Circle station road civil lines Jhansi
LOT 2 Project works of permanent (pucca) structures under Pirauna and Orai Sections of Betwa Canal Division-I, District Jalaun.
2026_UPIDC_1121040_5
05/SE-IV/2025-26
Open Tender
Civil Works - Canal
Item Rate
540 days
Jalaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹18.0 L
2 Apr 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | |||||
| 2 | Earth work in Mar, Ranker and Kanker mixed soil in digging or in embankment including lead up to 395m and lift upto 1.50 m with manual compaction and dressing. | 1 | Cum | - | - |
| 3 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar | 1 | Cum | - | - |
| 4 | Laying & spreading of Brick rora (Excluding Brick rora) in foundation | 1 | Cum | - | - |
| 5Laying & spreading Local sand or moorum plaster in sub grade below C.C. lining for proper completion of work as per direction of Engineer-in-Charge. | |||||
| 6Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc. | |||||
| 7 | Brick work (M-150) with 1:3 cement motar including all cost material labour and T&P etc. | 1 | Cum | - | - |
| 8Centering & shuttring for R.C.C. & C.C. work in bed block, slab & foundation C.C. including cost of all material and T&P etc. | |||||
| 9Reinforcement for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc. | |||||
| 10 | R.C.C. 1: 1.5: 3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc. | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
05SEIVNIT2025-6.pdf
Tender Documents • 2.76 MB
BOQ_2103338.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .