Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹6,200
Closing Date
18 Oct 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIVISIONAL FOREST OFFICER DIGLIPUR
DIVISIONAL FOREST OFFICER DIGLIPUR
Construction of Septic Tank of Type-I Qtr No. AB P-2 A plus B at Aerial Bay, Diglipur
2023_DFODP_11937_1
DFO/DP/2023/15
Open Tender
Construction Works
Works
60 days
DIGLIPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹6,200
Yes
25 Oct 2023
12 Oct 2023
18 Oct 2023
12 Oct 2023
18 Oct 2023
12 Oct 2023
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out
All kinds of soil.
Supplying and filling in plinth with pulvarised sand under floors including, watering, ramming consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources).
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Providing and fixing up to floor five level precast cement concrete hollow block including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete.
1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20mm nominal size).
12 mm cement plaster of mix :
1:4 (1 cement : 4 fine sand)
Rajesh Halder
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .