| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC STATION ROAD LATEHAR | LATEHAR | LATEHAR | JHARKHAND | ₹15.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.6 L+₹85,756.78 (5.46%)Rejected-Finance | ₹16.6 L+₹85,756.78 (5.46%) | L2 | Rejected-Finance L2 |
| 3 | L3₹16.9 L+₹1.2 L (7.65%)Rejected-Finance | ₹16.9 L+₹1.2 L (7.65%) | L3 | Rejected-Finance L3 |
| 4 | L4₹17.9 L+₹2.2 L (14.1%)Rejected-Finance | ₹17.9 L+₹2.2 L (14.1%) | L4 | Rejected-Finance L4 |
| 5 | L5₹19.4 L+₹3.7 L (23.9%)Rejected-Finance KUSHWAHA ENTERPRISES | ₹19.4 L+₹3.7 L (23.9%) | L5 | Rejected-Finance L5 |
Tender Value
₹24.9 L
EMD Value
₹50,000
Closing Date
12 Mar 2026, 5:00 pmClosed
EE RDSD LATEHAR
EE RDSD LATEHAR
RENOVATION OF UTKRAMIT MIDDLE SCHOOL TURISOT IN PANCHAYAT CHAKLA BLOCK CHANDWA DIST LATEHAR
2026_RDSPL_110606_1
EE/RDSD/LATEHAR/50/2025-26
Open Tender
Civil Works
Percentage
90 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹50,000
Yes
4 Apr 2026
28 Feb 2026
14 Mar 2026
28 Feb 2026
12 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for site clearance and cleaning old wall, surface, roof etc. all complete job. | - | nos. | 326.85 | - |
| 2 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I.(5.10.7) | - | M2 | 21.46 | - |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | M3 | 6,308.87 | - |
| 4 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) | - | M.T | 83,314.02 | - |
| 5 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)} | - | M.T | 82,096.54 | - |
| 6 | Providing and fixing stainless steel (Grade 304) railing made of Hoollow tubes, channels ,plates etc. including welding grinding buffing ,polishing and making curvature (wherever required) and fitting the same with necessary stanless steel nuts and bolts complete,i/c fixing the railing with necessary accessories &stanless steel dash fasteners, stainless steel bolts etc, of required size,on the top of the floor or the side of waist slab with suitable arrangment as per approval of Engineer -in charge ,( for paymentpurpose only wieght of stanless steel members shall be considered excluding fixing accessores such as nuts, bolts, fasteners etc.) | 1 | KG | 629.8 | ₹629.17 |
| 7 | Providing and Fixing 18mm tick gang saw cut mirror polished (permoulded &prepolished ) machine cut Udaipur Green Marble For Counter top of pantry &window Cills of required size of approved shade, color and textureclaid over 20mm thick base of cement Mortar 1:4 (1Cement:4Coarse sand) laid and jointed with White cement.mixed with matching pigment ,epoxy touch ups, including rubbing curing moulding and polished to edge to give high gloss finish etc.complete at all levels. | 1 | M2 | 2,510.08 | ₹2,507.57 |
| 8 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. | - | M2 | 165.8 | - |
| 9 | Providing 6mm cement plaster (1:4) in ceiling with clean coarse sand of F.M 1.5 including cost of screening, taxes and royalty all complete as per building specification and direction of E/I.
B.C.D. S.O.R. Item No. 5.7.6 | - | M2 | 184.06 | - |
| 10 | Supplying, fitting and fixing 20 guage G.C.I. Sheet gate fitted on M.S. Angle frame of size 60X60X6mm. Including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I. | - | M2 | 4,283.14 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_149528.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_149528.xls
BOQ • 0.36 MB
Sbd_50.pdf
Tender Documents • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .