| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance 9 VIVEKANANDASARANI P O GARIA KOLKATA KOLKATA KOLKATA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹3.0 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹3.0 L+₹8,621.41 (2.92%)Rejected-Finance | ₹3.0 L+₹8,621.41 (2.92%) | L2 | Rejected-Finance QUOTED RATE HIGH |
| 3 | L3₹3.0 L+₹9,241.45 (3.13%)Rejected-Finance | ₹3.0 L+₹9,241.45 (3.13%) | L3 | Rejected-Finance QUOTED RATE HIGH |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
24 Jul 2026, 5:00 pmClosed
EE/WS/JU/BR-XI
Baghajatin Market Complex Unit-Iii,Baghajatin Station Road, Kolkata-700086
MAINTENANCE OF WATER SUPPLY PIPE LINE BY CUTTING FLUSHING, LEAK REPAIR , SHIFTING CONNECTION WITH PIPE, AIR VALBE REPAIR , PIPE CHANGE AND DISINFECATION ETC AT RABINDRAPALLY, MILAN THIRTHA CLUB, CHATA PARK AREA IN WD NO-111, BR-XI.
2026_KMC_1031209_1
EE(WS)/BR-XI/NIeT/26/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
BAGHAJATIN
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,000
21 Aug 2026
7 Jul 2026
27 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.11 Hire and labour charges for coloured and twisted cloth rope fencing as per design approved by Engineer-in-charge one line with 100 mm dia Eucalyptus or bamboo posts 0.60 m above G.L and 300 mm below G.L 1.50 m apart fitted and fixed complete including painting with white zinc painting (2 coat) complete.Payment of painting to be made seperately. | 331.2 | METER | 20 | ₹6,624 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 15 | Daily | 202 | ₹3,030 |
| 3 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 2.34 | CUBIC METER | 939 | ₹2,197.26 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 7.2 | CUBIC METER | 636 | ₹4,579.2 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 99.36 | CUBIC METER PERCENT | 119.27 | ₹11,850.67 |
| 6 | CHAPTER - III TAKING OUT PIPES AND SPECIALS Cast Iron / Ductile Iron Pipes and Specials M.S. Pipes and Specials Shifting house connection or stand post connection from existing main to new main after excavation through any kind of soil and road materials up to required depth. dismantling existing ferrule with all fittings. plugging hole of old main with G.I. plug. drilling and tapping the new main. refixing the ferrule on the new main with serviceable old G.I pipes and other specials (New G.l. pipes and other specials. if required to be installed shall be paid extra) and back filling the trench with excavated materials all complete as per specification and direction of the Engineer- in-Charge. | 22 | EACH | 1,427 | ₹31,394 |
| 7 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (iii) 25 mm dia. medium quality | 13.2 | METER | 319 | ₹4,210.8 |
| 8 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ii) 20 mm dia. medium quality | 7.2 | METER | 240 | ₹1,728 |
| 9 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (iv) 32 mm dia. medium quality | 5.5 | METER | 354 | ₹1,947 |
| 10 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.7 Cutting of C.l/D.I pipes for fitting with pipes and-or specials of similar or dissimilar materials at the time of laying without damaging any part of the required length including taking out of the broken pieces from the trench and restacking the same at the specified location as per direction of the Engineer-in-Charge.D iameter in mm 100mm dia. | 48 | EACH | 91 | ₹4,368 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
TBID.pdf
Tender Documents • 1.44 MB
BOQ_2532152.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .