Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.8 LAdmitted-Finance | -28.28% | ₹17.8 L | L1 | Admitted-Finance |
| 2 | L2₹18.7 L+₹81,331.33 (4.56%)Admitted-Finance | -25.01% | ₹18.7 L+₹81,331.33 (4.56%) | L2 | Admitted-Finance |
| 3 | L3₹18.7 L+₹81,828.77 (4.59%)Admitted-Finance SHRI SHEELA | -24.99% | ₹18.7 L+₹81,828.77 (4.59%) | L3 | Admitted-Finance |
| 4 | L4₹19.1 L+₹1.3 L (7.21%)Admitted-Finance | -23.11% | ₹19.1 L+₹1.3 L (7.21%) | L4 | Admitted-Finance |
| 5 | L5₹19.2 L+₹1.4 L (7.72%)Admitted-Finance | -22.74% | ₹19.2 L+₹1.4 L (7.72%) | L5 | Admitted-Finance |
Tender Value
₹24.9 L
EMD Value
₹49,760
Closing Date
6 Jul 2026, 2:00 pmClosed
EOBALI
MBBALI
CIVIL WORKS
2026_DLB_570955_1
MB-07/2026-27/07
Open Tender
Civil Works
Percentage
120 days
MBBALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EO/MDRISL
₹49,760
Yes
13 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m. | - | cum | 229.5 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | 4,330 | - |
| 3 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 4,860 | - |
| 4 | Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. | - | cum | 5,830 | - |
| 5 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine
sand) Flush/ Ruled pointing | - | sqm | 225 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_1015878.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .