| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAccepted-AOC BHANGARMATH THAKURANICHAWK PO SAMABAYPALLY BALLY HOWRAH 711205 | HOWRAH | HOWRAH | WEST BENGAL | 711205 | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹43.9 L+₹8.9 L (25.4%)Rejected-Finance 60 4 MOTILAL GUPTA ROAD GROUND FLOOR KOLKATA 700 008 | KOLKATA | WEST BENGAL | 700008 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹47.7 L+₹12.7 L (36.2%)Rejected-Finance 52A 1A NAZIR LANE KIDDERPORE KOLKATA 700023 | KOLKATA | KOLKATA | WEST BENGAL | 700023 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹48.2 L+₹13.3 L (37.9%)Rejected-Finance 107 1A TOLLYGAUNG ROAD KOLKATA 700026 WB | KOLKATA | WEST BENGAL | 700026 | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹48.6 L+₹13.6 L (38.8%)Rejected-Finance 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | M/S S. K. SARKAR L3 | M/S BISWANATH BHATTACHARJEE L2 | ARJUN DAS VALECHA L4 | Tirupati Buildcon Pvt. Ltd. L8 | DEEPAK KHATTAR L9 | RAJ ENTERPRISE L5 | DUTTA & DUTTA L1 | SK CONSTRUCTION SYNDICATE & ENGG CO L7 | UNITED ENGINEERS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | (B/R PORTION)
Excavation in trenches not exc 1.5 metre width and not exceeding 1.5 metre in depth in hard and dense soil and getting out complete all as specified and as directed. | 8 | Cum | 533 ₹4,264 | 350 ₹2,800 | 528 ₹4,224 | 523 ₹4,184 | 538 ₹4,304 | 515 ₹4,120 | 200 ₹1,600 Lowest | 526 ₹4,208 | 516 ₹4,128 |
| 2.00 | Returning, filling in, including spreading, watering and well ramming in layers n. exc 25 cm thick in any type of soil complete all as specified and as directed. | 4 | Cum | 445 ₹1,780 | 150 ₹600 Lowest | 440 ₹1,760 | 435 ₹1,740 | 450 ₹1,800 | 427 ₹1,708 | 200 ₹800 | 438 ₹1,752 | 428 ₹1,712 |
| 3.00 | Removing excavated material to a distance n exc 50M and deposited where directed at a level n. exc 1.5M above the starting point complete all as specified and as directed. | 11 | Cum | 415 ₹4,565 | 150 ₹1,650 | 410 ₹4,510 | 405 ₹4,455 | 420 ₹4,620 | 397 ₹4,367 | 120 ₹1,320 Lowest | 408 ₹4,488 | 398 ₹4,378 |
| 4.00 | M&L Hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and cm thick, watered and rammed to a true surface of broken stones. | 21 | Cum | 525 ₹11,025 | 2,500 ₹52,500 | 5,500 ₹1,15,500 | 515 ₹10,815 | 530 ₹11,130 | 507 ₹10,647 Lowest | 1,200 ₹25,200 | 518 ₹10,878 | 508 ₹10,668 |
| 5.00 | M & L PCC 1:4:8 type D-2 using 40 mm graded stone aggregate as in sub base of floor complete all as specified and directed. | 9 | Cum | 8,825 ₹79,425 | 6,000 ₹54,000 Lowest | 8,820 ₹79,380 | 8,815 ₹79,335 | 8,830 ₹79,470 | 8,807 ₹79,263 | 6,000 ₹54,000 Lowest | 8,818 ₹79,362 | 8,808 ₹79,272 |
| 6.00 | Form work Use and waste to sides of concrete foundation, footing, bases of columns, plinth beam, side and soffits of plinth beam and similar works in vertical or to batter of fair finished surfaces complete all as specified and directed. | 25 | Sqm | 475 ₹11,875 | 500 ₹12,500 | 470 ₹11,750 | 465 ₹11,625 | 480 ₹12,000 | 457 ₹11,425 | 150 ₹3,750 Lowest | 468 ₹11,700 | 458 ₹11,450 |
| 7.00 | Form Work Use and waste to sides of columns, pillars etc. of fair finished surfaces complete all as specified and directed. | 22 | Sqm | 525 ₹11,550 | 500 ₹11,000 | 520 ₹11,440 | 515 ₹11,330 | 530 ₹11,660 | 507 ₹11,154 | 160 ₹3,520 Lowest | 518 ₹11,396 | 508 ₹11,176 |
| 8.00 | Form Work Use and waste to sides and soffits of floor or roof beams, lintel, cantilevers, shelves etc. including support of fair finished surfaces complete all as specified and directed. | 20 | Sqm | 525 ₹10,500 | 500 ₹10,000 | 520 ₹10,400 | 515 ₹10,300 | 530 ₹10,600 | 507 ₹10,140 | 170 ₹3,400 Lowest | 518 ₹10,360 | 508 ₹10,160 |
| 9.00 | Form Work Use and waste of to sides and soffits of slabs n. exc. 200 mm thick and similar works fair finished surfaces of concrete complete all as specified and directed. | 5 | Sqm | 505 ₹2,525 | 500 ₹2,500 | 500 ₹2,500 | 495 ₹2,475 | 510 ₹2,550 | 487 ₹2,435 | 170 ₹850 Lowest | 498 ₹2,490 | 488 ₹2,440 |
| 10.00 | M&L for 40 mm thick DPC to horizontal or vertical surfaces incl necessary formwork in cement concrete 1:2:4, type B-0 all as specified and directed. | 10 | Sqm | 645 ₹6,450 | 500 ₹5,000 | 640 ₹6,400 | 635 ₹6,350 | 650 ₹6,500 | 627 ₹6,270 | 300 ₹3,000 Lowest | 638 ₹6,380 | 628 ₹6,280 |
Tender Value
₹40.5 L
EMD Value
₹81,000
Closing Date
23 Jun 2026, 6:00 pmClosed
Garrison Engineer (FW) Kolkata
D9 Commissariat Road Hastings Kolkata 700022
PROVN OF TOILET FOR OFFICER, FLOORING AT OFFICE COMPLEX, SPECIAL REPAIR TO PATH, PROVN OF GARDEN LIGHTS, SPECIAL REPAIR SUBMAIN WIRING AND EXTERNAL ELECTRIFICATION INSIDE VIJAY DURG UNDER GE(VD) KOLKATA
2026_MES_769278_1
8597/E8
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer (FW) Kolkata
AS PER NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer (FW) Kolkata
₹81,000
18 Aug 2026
2 Jun 2026
24 Jun 2026
2 Jun 2026
23 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (B/R PORTION)
Excavation in trenches not exc 1.5 metre width and not exceeding 1.5 metre in depth in hard and dense soil and getting out complete all as specified and as directed. | 8 | Cum | - | - |
| 2 | Returning, filling in, including spreading, watering and well ramming in layers n. exc 25 cm thick in any type of soil complete all as specified and as directed. | 4 | Cum | - | - |
| 3 | Removing excavated material to a distance n exc 50M and deposited where directed at a level n. exc 1.5M above the starting point complete all as specified and as directed. | 11 | Cum | - | - |
| 4 | M&L Hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and cm thick, watered and rammed to a true surface of broken stones. | 21 | Cum | - | - |
| 5 | M & L PCC 1:4:8 type D-2 using 40 mm graded stone aggregate as in sub base of floor complete all as specified and directed. | 9 | Cum | - | - |
| 6 | Form work Use and waste to sides of concrete foundation, footing, bases of columns, plinth beam, side and soffits of plinth beam and similar works in vertical or to batter of fair finished surfaces complete all as specified and directed. | 25 | Sqm | - | - |
| 7 | Form Work Use and waste to sides of columns, pillars etc. of fair finished surfaces complete all as specified and directed. | 22 | Sqm | - | - |
| 8 | Form Work Use and waste to sides and soffits of floor or roof beams, lintel, cantilevers, shelves etc. including support of fair finished surfaces complete all as specified and directed. | 20 | Sqm | - | - |
| 9 | Form Work Use and waste of to sides and soffits of slabs n. exc. 200 mm thick and similar works fair finished surfaces of concrete complete all as specified and directed. | 5 | Sqm | - | - |
| 10 | M&L for 40 mm thick DPC to horizontal or vertical surfaces incl necessary formwork in cement concrete 1:2:4, type B-0 all as specified and directed. | 10 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
pdfjoiner8597.pdf
Tender Documents • 1.35 MB
BOQ_861501.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .