Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -1.00% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 L+₹3,784.26 (2.02%)Admitted-Finance | +1.00% | ₹1.9 L+₹3,784.26 (2.02%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 L+₹5,676.39 (3.03%)Admitted-Finance | +2.00% | ₹1.9 L+₹5,676.39 (3.03%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,784
Closing Date
28 Feb 2026, 6:45 pmClosed
EE
S/O
Laying of 300 mm dia Sewer Line 38 Mtr and 02 Nos Man Hole at H No 18 a Mohd Ashsan Faruki House Pokharpur Kanpur
2026_DOLBU_1118962_23
Jal / EE Zone 2 / 5036 /
Open Tender
Miscellaneous Works
Percentage
90 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
FC
₹3,784
Yes
20 Aug 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CC Road Cutting & its Stacking old mat including Supply of lab T&P all Comp (A) For Sewer Line 300 mm dia (B) For Man Hole | 43.76 | sqm | 404.6 | ₹17,705.3 |
| 2 | Excavation of Trenches in Mixed soil including Supply of lab, T&P etc all comp. (A) For Sewer Line 300 mm dia (B) For Man Hole | 73.07 | sqm | 291.89 | ₹21,328.4 |
| 3 | Concrete work in 12:6:1 with all Comp (A) Providing Close Timbering | 4.51 | cum | 4,747.35 | ₹21,410.55 |
| 4 | Making Barricating Arrangement With Sal ballies, Lab, T&P etc all Comp. | 86 | Rtm | 200 | ₹17,200 |
| 5 | 1 st Class brick work with 1:4 cement & coarse sand mortar including supply of lab.mat T&P all complete as directed by site I/C | 3.95 | Mtr | 7,200 | ₹28,440 |
| 6 | 15. mm thick plaster in 1:4 cement & coarse sand mortar including supply of lab.mat T&P all complete as directed by site I/C | 14.4 | Sqm | 237.17 | ₹3,415.25 |
| 7 | Providing beir to retain sewage water when required in existing sewer line an MH including binding with binding wire an lightly hinged with maneelarope of proper thickness and removal of same after completion of work supply of lab.mat T&P all directed by site I/C | 6 | cum | 450 | ₹2,700 |
| 8 | RCC Work in 1:2:3 in Prop of Cement , Sand & Stone Ballast Including Supply of Lab , Mat , T&P etc all Comp. | 0.72 | cum | 11,278.57 | ₹8,120.57 |
| 9 | Mild Steel Work | 0.57 | cum | 13,900 | ₹7,923 |
| 10 | Bailing out of water with 7.5 HP Mud hours per day including all accessories Comp. (A) M.S Work (B) Footrest | 5 | unit | 470 | ₹2,350 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
304.pdf
Tender Documents • 1.37 MB
BOQ_2081873.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .