Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -0.45% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 L+₹856.55 (0.45%)Admitted-Finance | +0.00% | ₹1.9 L+₹856.55 (0.45%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 L+₹96,028.49 (50.7%)Admitted-Finance | +50.00% | ₹2.9 L+₹96,028.49 (50.7%) | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,800
Closing Date
4 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Well. Near Moh. Mohan Singh Others W. No. 4, Panchayat. Magloor East Block Dinga Amb
2026_RDPR_317755_7
e-NIT No.140/REW/K of 2026-27 Dated 24/07/2026
Open Tender
Civil Works
Percentage
90 days
DINGA AMB
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹3,800
17 Aug 2026
24 Jul 2026
5 Aug 2026
24 Jul 2026
4 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 115.64 | cum | 479.3 | ₹55,426.25 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in : Ordinary rocks 1st lift | 37.02 | cum | 89.75 | ₹3,322.55 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in : Ordinary rocks 2nd lift | 27.55 | cum | 179.5 | ₹4,945.23 |
| 4 | Extra for every additional lift of 1.5 m or part thereof in : Ordinary rocks 3rd lift | 18.79 | cum | 269.25 | ₹5,059.21 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.8 | cum | 5,733.6 | ₹21,787.68 |
| 6 | Dry random rubble masonary with hard stone in foundation and plinth:
Using nallah stone without bond stone. | 14.22 | sqm | 2,793.8 | ₹39,727.84 |
| 7 | Supply of stoness | 12.08 | cum | 1,204 | ₹14,544.32 |
| 8 | Centering and Shuttering including strutting, propping etc and removal of form for
Foundations: footings, bases of columns etc. for mass concrete | 26.26 | sqm | 286.35 | ₹7,519.55 |
| 9 | Labour engagaed for dewatering, lowering of materials and all complete | 12 | days | 650 | ₹7,800 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. | 92.51 | sqm | 218.4 | ₹20,204.18 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.88 MB
BOQ_1042900.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .