| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-Finance BHAGWATI NAGAR JAMMU | ₹2.1 L | 1 | Accepted-Finance Found Eligible |
| 2 | 2₹2.2 L+₹7,000 (3.33%)Accepted-Finance | ₹2.2 L+₹7,000 (3.33%) | 2 | Accepted-Finance Found Eligible |
| 3 | 3₹2.3 L+₹15,000 (7.14%)Accepted-Finance | ₹2.3 L+₹15,000 (7.14%) | 3 | Accepted-Finance Found Eligible |
| Sl No | Description | Qty | Unit | PERFECT ELECTRICAL WORKS L1 | ANMOL TRANSFORMERS L2 | MS SYSK ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Disconnecting 11KV incoming power supply to 500KVA capacity, 3-phase, 11KV/440V ONAN cooling vector group Dy-11. LT Transformer by disconnecting all the electrical connections and loading the Transformer in the Mechanical vehicle with the help of mobile crane and all the tools and tackles required to execute the job and then shifting to workshop for its repairs and unloading at workshop. The job includes draining out of transformer oil into barrels (420 liters. Approx). Disassembling the transformer at workshop by disassembling of all the fasteners i.e. nuts, bolts etc. Extracting of transfer coils assemblies out of the main housing, complete disassembling of transformer assembly-core and damaged coils and allied parts at workshop. Providing/Fixing of new HV coils as per sample size of requisite specifications with proper F-class insulation (2-legs@66 kg per leg/limb) in place of all damaged coils of the limb/leg. Reconditioning of LT coils (3-leg@56 kg per leg/limb) of transformer. Then assembling & making of connections by proper dehydration of core and winding in heat chamber till specified proper IR value is achieved. Cleaning of transformer tank from inside to make it free from slag, dirt, dust etc. Job also includes welding works of the transformer tank to prevent the leakages of transformer oil by using good quality welding electrodes. The Job involves assembling of Transformer with new and re-conditioned transformer core-coil assembly and complete connected accessories/gaskets/sundry items etc. Filling of fresh transformer oil 250 ltrs. and remaining 170 liters (old) oil after proper treatment. Then testing of Transformer for permissible magnitudes of all connected parameters on full load conditions as per IS.2026 specifications. Then loading of the repaired Transformer from workshop and its unloading at site on its platform with the help of mobile crane. The job includes making of all the requisite electric connections both on HV & LV side and making proper earthing to the Transformer. Job also includes site testing of LT transformer for its proper functioning on no-load and full-load conditions and its proper commissioning. Complete job includes cost of material after deducting rebate on old unserviceable material, charges for skilled & semi-skilled labour, hire charges of machinery/tools & tackles with-transportation charges (to & fro) etc. Complete Job. | 1 | Job | 4,200 ₹2,05,800 Lowest | 4,340 ₹2,12,660 | 4,500 ₹2,20,500 |
Tender Value
₹2.3 L
EMD Value
₹4,671
Closing Date
3 Jun 2026, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repairs to 500 KVA capacity LT 11KV/440V Electrical Transformer installed at LIS Ranjan for functioning of lubrication system, tube-well and lighting system etc.
2026_IFC_310297_1
MID/AN/07
Open Tender
Electrical and Maintenance Works
Item Wise
15 days
Ranjan
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹4,671
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
25 Jun 2026
19 May 2026
4 Jun 2026
19 May 2026
3 Jun 2026
21 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting 11KV incoming power supply to 500KVA capacity, 3-phase, 11KV/440V ONAN cooling vector group Dy-11. LT Transformer by disconnecting all the electrical connections and loading the Transformer in the Mechanical vehicle with the help of mobile crane and all the tools and tackles required to execute the job and then shifting to workshop for its repairs and unloading at workshop. The job includes draining out of transformer oil into barrels (420 liters. Approx). Disassembling the transformer at workshop by disassembling of all the fasteners i.e. nuts, bolts etc. Extracting of transfer coils assemblies out of the main housing, complete disassembling of transformer assembly-core and damaged coils and allied parts at workshop. Providing/Fixing of new HV coils as per sample size of requisite specifications with proper F-class insulation (2-legs@66 kg per leg/limb) in place of all damaged coils of the limb/leg. Reconditioning of LT coils (3-leg@56 kg per leg/limb) of transformer. Then assembling & making of connections by proper dehydration of core and winding in heat chamber till specified proper IR value is achieved. Cleaning of transformer tank from inside to make it free from slag, dirt, dust etc. Job also includes welding works of the transformer tank to prevent the leakages of transformer oil by using good quality welding electrodes. The Job involves assembling of Transformer with new and re-conditioned transformer core-coil assembly and complete connected accessories/gaskets/sundry items etc. Filling of fresh transformer oil 250 ltrs. and remaining 170 liters (old) oil after proper treatment. Then testing of Transformer for permissible magnitudes of all connected parameters on full load conditions as per IS.2026 specifications. Then loading of the repaired Transformer from workshop and its unloading at site on its platform with the help of mobile crane. The job includes making of all the requisite electric connections both on HV & LV side and making proper earthing to the Transformer. Job also includes site testing of LT transformer for its proper functioning on no-load and full-load conditions and its proper commissioning. Complete job includes cost of material after deducting rebate on old unserviceable material, charges for skilled & semi-skilled labour, hire charges of machinery/tools & tackles with-transportation charges (to & fro) etc. Complete Job. | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_1003955.xls
BOQ • 0.29 MB
extension07.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .