Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.2 CrAccepted-AOC 5 5 313A S D LAYOUT TIRUPATHI ANDHRA PRADESH | TIRUPATHI | ANDHRA PRADESH | ₹46.2 Cr Quoted ₹46.7 Cr | L1 | Accepted-AOC Lowest - Accepted |
| 2 | L2₹53.8 CrRejected-AOC PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | ₹53.8 Cr | L2 | Rejected-AOC Highest - Rejected |
Tender Value
₹45.2 Cr
EMD Value
₹34 L
Closing Date
3 Sept 2024, 3:00 pmClosed
Chief Engineer, TWAD Board, Thanjavur
Office of the Chief Engineer, TWAD Board, Integrated Office Complex, First Floor,No.243/2, Thanjavur-Trichy Main Road, Pillayarpatty, Thanjavur- 613 403
Providing 7.00 MLD water supply scheme to SIPCOT industrial complex at Manapparai in Trichy District with river Cauvery as source near Perugamani under deposit work
2024_TWAD_475554_1
02 /F. SIPCOT- Manapparai / SDO/CE-TNJ/2024
Open Tender
Civil Works - Water Works
547 days
Chief Engineer, TWAD Board
As per Bid Document
3 documents required · 3 mandatory
₹0
₹34 L
Chief Engineer, TWAD Board, Thanjavur
7 Nov 2024
24 Aug 2024
4 Sept 2024
24 Aug 2024
3 Sept 2024
30 Aug 2024
24 Aug 2024 - 28 Aug 2024
28 Aug 2024
Amount
Providing 7.00 MLD water supply scheme to SIPCOT industrial complex at Manaparai in Trichy District with river Cavery as source near Perugamani under deposit work (Period of Construction 18 months,Trial run: 6 Months & Paid Maintenance:12 Months)
Construction of Infiltration Well at Vellur - 4.50 m dia x 12 m depth -5 Nos.
Connecting Main for the Infiltration Well - Materials
Construction of For Sump of 775000 Lits Capacity - PERUGAMANI
FOOT BRIDGE NEAR PERUGAMANI- 15 M IN RIVER CAUVERY - BOTH WELL FOUNDATION AND PILE FOUNDATION
Construction of Pump Room for Perugamani - 9 m x 5 m
Construction of Elevated Transformer Yard
Construction of Pipe carrying Bridge along the Pumping main - TRICHY DATA
Construction of Pipe carrying Bridge along the Pumping main - KARUR DATA
SIPCOT SUMP -400 mm INLET CONNECTION
Construction of 3.9 LL CAPACITY - SIPCOT SUMP CUM PUMP HOUSE @ PUTHUR (Karur Data)
Construction of 40 x 40 m Compound wall at Sump site (Karur Data)
Toilet Room of size 2.4 m x 1.5 m (Karur Data)
Construction of Control room with Office Room - 6 m x 4 m
SUPPLY, DELIVERY AND ERECTION OF TURBINE PUMPSETS AT COLLECTION SUMP CUMP PUMP HOUSE AND INFILTRATION WELL AT PERUGAMANI
SUPPLY, DELIVERY AND ERECTION OF TURBINE PUMPSETS AT INTERMEDIATE BOOSTER SUMP - (PUTHUR PANCHAYAT - KARUR DT)
Pumping Main - Materials & Civil
Operation and Paid Maintenance of the Scheme for five years
Sub Total
GST in 18%
ECO PROTECTION ENGINEERS PVT LTD (BID ID -1126154)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid