| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.6 LAdmitted-Finance | -17.56% | ₹42.6 L | L1 | Admitted-Finance |
| 2 | L2₹44.8 LAdmitted-Finance | -13.33% | ₹44.8 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Technically Not Qualified |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹51.7 L
EMD Value
₹1.0 L
Closing Date
19 Jan 2026, 6:00 pmClosed
EXECUTIVE ENGINEER W.D.S.C PS UMRAIN
EXECUTIVE ENGINEER W.D.S.C PS UMRAIN
Construction of SSB, ECD,BS,MPT and CCT Nirman Work in MJSA 2.0 Block Thanagazi (Package No. 02)
2026_WDSC_526339_1
NIT No. 01/2025-26 Block Thanagazi Package No. 02
Open Tender
Civil Works
120 days
Thanagazi
Scanned copy of e-grass challan of TD Cost, Bid security declaration, and tender processing fees (e-procurement process fees), With TD along with Annexures
2 documents required · 2 mandatory
₹1,000
SE and PM WCDC ALWAR DDO-28589
₹1.0 L
Yes
EXECUTIVE ENGINEER W.D.S.C PS UMRAIN
27 Jan 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
15 Jan 2026
जंगल की सफाई, साधारण वनस्पति तथा झाडि़यों को काटने सहित।
Dag belling work upto 5-7 cm deep
Benching base and disposal of the excavated material including dressing etc. complete within initial lead upto 50m and lift upto 1.5m
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil)
Earth work in execavation including loading unloading,disposaland dressing of execavated earth within initial lead of 50M and lift upto1.5m in dry or moist
15 से 30 सेमी मोटे हथोड़े से तरासे हुए एकल पत्थर की पिचिंग समस्त उठान के साथ, आपूर्ति के साथ ।
सूखी या गीली मिट्टी खुदाई कार्य कटाई में मय भराई, खाली कराई व खुदी हुई मिट्टी का निस्पादन प्रारम्भिक लीड 50 मी0 व उठान 1-5 मी0 निस्पादीत मिट्टी को समतल या दरेसी करना एवं आवश्यकतानुसार डी वाटरिंग करना।
Excavation in dry or moist and disposal of excavated material within initial lead of 30m and lift of 1.5m including dressing etc. complete Hard soil Mixed with Kankar/Boulder/Murram
सेन्टरिंग'शटरिंग (तख्ता एवम ढुलाबंदी) का आर.सी.सी. छत, स्लेब, छज्जे, लिन्टल आदि डालने के लिए लगाना 4.5 मीटर ऊचाई तक के लिए तथा हटाना आदि विशेष विवरण के अनुसार। शटरिंग स्टील
500 micron thick HDPE Geomembrane BIS 15351/2015 With GST
Labour charges for laying & spreading of LDPE / HDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications excluding cost of LDPE film and including cost of overlapping and cost of adhesive tape etc. with transportation charges upto work site complete.
Excavation in dry or moist and disposal of excavated material within initial lead of 30m and lift of 1.5m including dressing etc. complete lead upto 20 km FOR CORE WALL
Labour charges including watering for puddle work to obtain minimum dry density as 90 % of M.D.D.
Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required. FOR CORE WALL
क्वेरी रबिश (1/6 वोइड्स काटें) 3 कि.मी. मूरम,भवन का मलवा,चूना,बजरी,पत्थर की गिट्टी 40mm नोमिनल साइज से कम तक का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना,उतारना व स्टेकिंग सहित
ग्रेवल,मूरम,क्वेरी रबिश, कंकर, गिट्टी आदि चाहे गए ग्रेड व केम्बर में अधिकाधिक 15 सेमी मोटी परत में बिछाई का कार्य मय ड्रेसिंग सहित
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)
Watering of earth including cost of carriage of water when source of water is up to 3 Km
वेरद्धा पत्थरो का सीमेन्ट मसाला 1:6 मसाले में खरंजे का कार्य हेतु पत्थरों की आपूर्ति,अन्य निर्माण सामग्री की आपूर्ति, सीमेन्ट मसाले मे खरंजा लगाना, दो पत्थरो के बीच के खाली जगह को सीमेन्ट मसाले से पूरी उचाई तक भरना, होदा में से निकली अतिरिक्त मिट्टी का 50 मीटर तक निस्तारण करना। 23 सेमी मोटाई के पत्थर का खरंजा
Display board of stone on work site size. 2.00 *2.50 feet and hight 4.00 feet above ground level & Work site photograph (4"x6")
Sowing of seed on bunds
Cost of Seed Dhaman/Stylohemata/Ratanjot/Arandi
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BlockThanagajiPackageNo02.pdf
Tender Documents • 1.21 MB
BOQ_939034.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid