Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.9 CrAdmitted-Finance | L1 | Admitted-Finance Qualified for opening of price bid |
Tender Value
₹83.5 Cr
EMD Value
₹1.7 Cr
Closing Date
3 Feb 2017, 3:00 pmClosed
Superintending Engineer (DDUGJY), JdVVNL, Jodhpur
Superintending Engineer (DDUGJY), JdVVNL, New Power House, Jodhpur
Feeder separation strengthening and augmentation of sub transmission and distribution system including metering of feeder and consumer RE component BPL and domestic connection in Barmer block of Barmer district under DDUGJY on turnkey basis.
2017_JdVVN_51913_1
JdVVNL/DDUGJY/BMR Lot-I/TNTW-351
Open Tender
Electrical Works
Turn-key
730 days
Barmer block of Barmer District
As per tender document
3 documents required · 3 mandatory
₹25,000
Sr. AO CPC, MD RISL
₹1.7 Cr
13 Feb 2017
9 Jan 2017
3 Feb 2017
9 Jan 2017
3 Feb 2017
9 Jan 2017
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .