Loading…
Loading…
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
18 Sept 2026, 3:00 pm3d left
Published by the portal on this tender, for queries and grievance redressal.
WORKSHOP TOOLS
9860791
GEM/2026/B/8008450
Two Packet Bid
Blower
Jammu, Jammu And Kashmir
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
2 yrs
₹31
₹1 L
30%
Exempted
Yes
8 Sept 2026
8 Sept 2026
19 Sept 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Adhesive | Wood Adhesive ISI Mark Make Pidilite Fevicol Marine | 20 | Kgs | Jammu | 30 |
| 2 | Heatex | Adhesive Heatex ISI Mark Make Pidilite | 5 | Ltrs | Jammu | 30 |
| 3 | Screw 1.5 inch | Screw 1.5 inch Star Head Black Color Full Threaded | 1,000 | Nos | Jammu | 30 |
| 4 | Screw 2 inch | Screw 2 inch Star Head Black Color Full Threaded | 1,000 | Nos | Jammu | 30 |
| 5 | Screw 35 8 | Steel Screw 35 8 Half Threaded | 500 | Nos | Jammu | 30 |
| 6 | Cutter | Sunmica Cutter as per approved sample | 2 | Nos | Jammu | 30 |
| 7 | Blower | Manual Blower ISI Mark as per approved sample | 1 | Nos | Jammu | 30 |
| 8 | Nozzle | Welding Nozzle 1.2mm for Mig Welding ISI Mark | 30 | Nos | Jammu | 30 |
| 9 | Helmet | Helmet for Welder IBL550S Make I Bell ISI Mark | 1 | Nos | Jammu | 30 |
| 10 | Flat Brush | Flat Brush for writing 0 to 12 Nos set ISI Mark Make- Arora/ Avon | 2 | Set | Jammu | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9860791.pdf
GEM_BID • 0.14 MB
boq_tools_2026-09-08-10-47-56_ecbeb7013662ebe1390219432ff8f96e.pdf
BOQ • 0.54 MB
boq_tools_2026-09-08-10-47-56_10685e72286ec35b60ba17e96aab8ec4.csv
BOQ • 0.00 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .