Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance BARMER | RAJASTHAN | 344001 | -19.71% | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.2 Cr+₹4.4 L (1.06%)Admitted-Finance | -18.86% | ₹4.2 Cr+₹4.4 L (1.06%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 Cr+₹18.8 L (4.57%)Admitted-Finance | -16.04% | ₹4.3 Cr+₹18.8 L (4.57%) | L3 | Admitted-Finance |
| 4 | L4₹4.4 Cr+₹26.6 L (6.45%)Admitted-Finance | -14.53% | ₹4.4 Cr+₹26.6 L (6.45%) | L4 | Admitted-Finance |
| 5 | L5₹4.5 Cr+₹35.6 L (8.63%)Admitted-Finance | -12.78% | ₹4.5 Cr+₹35.6 L (8.63%) | L5 | Admitted-Finance |
Tender Value
₹6.1 Cr
EMD Value
₹12.1 L
Closing Date
20 Aug 2026, 6:00 pmClosed
Addl. Chief Engineer PWD Zone Ajmer
Civil Line Ajmer
Construction of Slabe Culvert on Sapunda Hingoniya at Chainage 3/300 (BA 26-27) Point No 296.92/30Cr/03
2026_CEPWD_578923_1
NIT No 16 of 2026-27 ACE PWD Zone Ajmer
Open Tender
Civil Works
Percentage
300 days
Kekri
Please refer tender Document
5 documents required · 5 mandatory
₹5,000
EE PWD DN KEKRI / MD RISL JAIPUR
₹12.1 L
Yes
10 Sept 2026
29 Jul 2026
24 Aug 2026
29 Jul 2026
20 Aug 2026
29 Jul 2026
29 Jul 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part "I" : Foundation Work | - | - | - | - |
| 2 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre | 3,981.7 | Cum | 161 | ₹6,41,053.7 |
| 3 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. Depth above 3 metre & upto 6 metre | 791.1 | Cum | 191 | ₹1,51,100.1 |
| 4 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. By chieseling/wedging out rock where blasting is prohibited in soft rock | 791.1 | Cum | 1,055 | ₹8,34,610.5 |
| 5 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 284.63 | Cum | 44 | ₹12,523.72 |
| 6 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level. P.C.C. grade M15 | 332.28 | Cum | 3,100 | ₹10,30,068 |
| 7 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level. P.C.C. grade M20 | 338.73 | Cum | 3,525 | ₹11,94,023.25 |
| 8 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level. R.C.C. grade M25 | 1,222.72 | Cum | 3,955 | ₹48,35,857.6 |
| 9 | Supplying, fitting, and placing TMT bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 | 124.78 | M.T | 80,669 | ₹1,00,65,877.82 |
| 10 | Part "II" : SUB STRUCTURE WORK | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.07 MB
Tendernotice_2.pdf
PDF • 5.64 MB
Tendernotice_3.pdf
PDF • 0.62 MB
Tendernotice_4.pdf
PDF • 23.43 MB
BOQ_1028846.xls
BOQ • 0.35 MB
Bid_CD_Sapunda_Hingoniya_Kekri.pdf
Tender Documents • 5.78 MB
BGFormate.pdf
Tender Documents • 0.31 MB
Schedule.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .