Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 01₹98.8 LAccepted-AOC | ₹98.8 L | 01 | Accepted-AOC Accepted being L-1 |
| 2 | 02₹99.3 LRejected-AOC | ₹99.3 L | 02 | Rejected-AOC Rejected being L-2 |
| 3 | 03₹99.8 LRejected-AOC | ₹99.8 L | 03 | Rejected-AOC Rejected being L-3 |
| Sl No | Description | Qty | Unit | Chander Kumar L2 | SUBHASH CHAND L3 | Kamal Singh Rana L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
(As per CSR-2020 item No.6.19) | 782.48 | Cum | 40 ₹31,299.20 | 99 ₹77,465.52 | 40 ₹31,299.20 |
| 2.00 | Cement concrete 1: 6: 12 (b) with stone aggregate 40 mm gauge. (ii) mixing by mechanical means using concrete mixer volumetric type
(As per CSR-2020 item No. 10.8 - (b) (ii)) | 65.53 | Cum | 3,610 ₹2.4 L | 4,300 ₹2.8 L | 3,610 ₹2.4 L |
| 3.00 | First class burnt brick work laid in cement sand mortar 1: 4: in foundation and plinth.
(As per AOR-II) | 272.51 | Cum | 5,815 ₹15.8 L | 7,300 ₹19.9 L | 5,815 ₹15.8 L |
| 4.00 | DPC 2.5 cm thick of cement concrete 1: 2: 4: with two coats of bitumen 20/30 penetration at 1.65 Kg. P. Sqm. laid hot and sanded.
(As per CSR-2020 item No.10.28) | 117.33 | Sqm | 270 ₹31,679.10 | 320 ₹37,545.60 | 270 ₹31,679.10 |
| 5.00 | First class burnt brick work laid in cement sand mortar 1: 4 in first storey up to 4 mtrs. above plinth level.
(As per AOR-III) | 139.18 | Cum | 6,972 ₹9.7 L | 6,999 ₹9.7 L | 6,972 ₹9.7 L |
| 6.00 | Cement concrete 1:2:4 (a) with stone ballast or shingle. (ii) mixing by mechanical means using concrete mixer volumetric type.
(As per CSR-2020 item No.10.13-a-ii) | 5.56 | Cum | 5,060 ₹28,133.60 | 5,800 ₹32,248 | 5,060 ₹28,133.60 |
| 7.00 | Fixing glass pieces on top of walls
(As per CSR-2020 item No.26.17) | 569.98 | Mtr | 47 ₹26,789.06 | 59 ₹33,628.82 | 47 ₹26,789.06 |
| 8.00 | 12.5 mm thick cement plaster 1:5
(As per CSR-2020 item No.15.1) | 382.7 | Sqm | 210 ₹80,367 | 209 ₹79,984.30 | 210 ₹80,367 |
| 9.00 | 20mm thick cement plaster 1:5 in two coat work.
(As per CSR-2020 item No.15.21) | 1,178.68 | Sqm | 282 ₹3.3 L | 309 ₹3.6 L | 282 ₹3.3 L |
| 10.00 | Striking joints in lime or cement on brick walls.
(As per CSR-2020 item No.15.65) | 1,516.03 | Sqm | 105 ₹1.6 L | 109 ₹1.7 L | 105 ₹1.6 L |
Tender Value
₹96.7 L
EMD Value
₹1.9 L
Closing Date
21 May 2025, 12:30 pmClosed
Er. D. P. Soni
Sr. Executive Engineer, Civil Maintenance Division, BBMB (PW) Ganguwal
Construction of new boundary wall around proposed solar installation area along with demolition of existing brick masonry shed structure/stone masonry structure/gantry structure and earth filling in water lodged area at Kotla.
2025_BBMB_232790_1
NIT-919
Open Tender
Civil Works
150 days
Kotla Power House
As per Tender Documents
2 documents required · 2 mandatory
₹2,360
Sr. AO (P), BBMB (PW) Nangal
₹1.9 L
27 Feb 2026
30 Apr 2025
22 May 2025
30 Apr 2025
21 May 2025
30 Apr 2025
30 Apr 2025 - 21 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid