| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹54.8 LAccepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | L-1 | Accepted-AOC Being lowest and reasonable | |
| 2 | L-2₹56.5 L+₹1.8 L (3.20%)Rejected-Finance 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L-2 | Rejected-Finance Not being lowest bidder. | |
| 3 | Rejected-Technical 79 B BLOCK SRI GANGANAGAR 335001 RAJASTHAN | GANGANAGAR | RAJASTHAN | 335001 | - | Rejected-Technical Not admitted since Firm is two class below from eligible class |
Tender Value
₹55 L
EMD Value
₹1.1 L
Closing Date
4 Jan 2025, 6:00 pmClosed
CWE Bathinda
HQ CWE Bathinda Bathinda Mil Stn
REPAIR/MAINTINACE OF 132 KV MRS AND MAIN SUB STATION UNDER GE(U) BATHINDA AT BATHINDA MIL STN
2024_MES_686396_1
CWE BTD/TOKEN-38/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Bathinda Mil Stn
As per NIT
7 documents required · 7 mandatory
₹1,000
GE (U) Bathinda
₹1.1 L
HQ CWE Bathinda
21 Feb 2025
29 Nov 2024
6 Jan 2025
29 Nov 2024
4 Jan 2025
21 Dec 2024
13 Dec 2024
Amount
Maintenance & complete overhauling of 11 KV S Breaker & Control Panel including dismantling of operating mechanism parts, well cleaning with petrol and replacing minor parts, reassembling of parts including well cleaning and complete panel board main bus bar, de- carbonizing all joints bus bar CT, PT, spouts metal parts and making breaker perfect operation in manual and electric mode including all routine and preventive maintenance complete all as specified and directed INCLUDING Complete Calibration of 11 KV Transformer control and relay panel complete such as ANN-annunciator, Master trip relay, Aux external trip relay, Trip CKT supervision relay, overcurrent & earth fault relay, auxillary relays etc and settings as per site conditions and manufacturer's instructions by applying AC/DC to voltage coil unit and measuring the time taken by relay to have trip command etc including replacement of old /burnt wiring complete all as specified and directed. Note : (b) In case of major repairs/replacement in Breaker which can not be undertaken at site theBreaker shall be shifted at civil workshop and the cost shall be paid separately under relevant items. (c) Cost of other necessary repairs shall be measured and paid separately under relevant item. Contractor shall bring the mechanic at site for first inspection of the Breaker after that shall be shifted at workshop complete all as directed by Engr-In-Charge. .
Maintenance & complete overhauling of 132 kV SF6 Breaker & Remote Control Panel including dismantling of operating mechanism parts, well cleaning with petrol and replacing minor parts, reassembling of parts including well cleaning and complete panel board main bus bar, de- carbonizing all joints bus bar CT, PT, spouts metal parts and making breaker perfect operation in manual and electric mode including all routine and preventive maintenance complete all as specified and directed INCLUDING Complete Calibration of 33 KV Transformer control and relay panel complete such as ANN-annunciator, Master trip relay, Aux external trip relay, Trip CKT supervision relay, overcurrent & earth fault relay, auxillary relays etc and settings as per site conditions and manufacturer's instructions by applying AC/DC to voltage coil unit and measuring the time taken by relay to have trip command etc including replacement of old /burnt wiring complete all as specified and directed. Note : (b) In case of major repairs/replacement in Breaker which can not be undertaken at site theBreaker shall be shifted at civil workshop and the cost shall be paid separately under relevant items. (c) Cost of other necessary repairs shall be measured and paid separately under relevant item. Contractor shall bring the mechanic at site for first inspection of the Breaker after that shall be shifted at workshop complete all as directed by Engr-In-Charge.
Dismantling of old pully system and mercury / thermal based sensors and protection and replacement with new Digital Micro controller-based indicator cum master controller WTI & OTI complete with re-setting device and alarm contactor etc. (Provide details & specifications). suitable for any type of oil immersed EHT/HT Transformers along with provision of alarms, tripping & cooling features set programmable, range 0-250°C, Accuracy +/- 0.5°C, adjustable range 10-90% of Full Scale Range, with PT sensor, thermometer pocket sensor , along with necessary remote indicator with following specification’s temperature sensor input –RTD(PT-100,IEC60751),CT Secondary current programable 1.0 amp to 5.0 amp digital programmable, 04 numbers potential free contacts 5 amp AC 240 VAC / 10 Amp DC 30/110 volts, auxiliary supply 90 volts to 250 volts AC. Password protection for calibration and programming mode. Software Calibration for 2 channels. MODBUS RTU multi drop RS-485 serial communication Note, Sundry items including Air Release Plug, Arcing Horns, Cover Bolts, caps screws, Washers, insulation material, minor repairs of the other parts, if required any and not covered under the items specified above. The necessary job after satisfactory repair and testing shall be suitable for operation in hot and humid climate conducive to rust and fungus growth suitable for indoor/ outdoor types in all respect. TEMPERATURE RISE: The temperature rise in hottest layer of oil of the repaired transformers shall not exceed 450 C as measured by thermometer and temperature rise of winding shall not exceed 500 C as per the design of transformers as measured by resistance method at continuous full load. In case because of inherent design the temp. rise exceeds the above limits, immediate tripping with 2 milli sec activation to be programmed by contractor with existing structure. The following points will be inspected by Engg- In – Charge In case of existing cables not found in order the contractor will arrange Copper cable 4 core 1.5 Sqmm for switch connection & 2 core 1.5 Sqmm for CT Connection & 3 Core 1.5 Sqmm for CCU Connections , Line to body high voltage test 2.5 KV Ac , 50 Hz 30 Sec, All switches type NO Type with switch differential 5 Degree Celsius along with anti-vibration mounting.
Continuted Serial Item No. 5.00 All saved charts should be available to choose with a single-click. System should support showing analytics data in graphical and tabular form. Facility to export data over a custom time interval to Excel shall be available. Reports should be user-defined and not fixed (hardcoded into the system). System should support sending daily, weekly and monthly reports. Daily reports should be sent next day morning over email incorporating all data from previous day. There should be a mechanism to turn reporting sending of scheduled reports ON/OFF There should be a mechanism to send a pre-created report on-demand (and not just as scheduled daily / weekly / monthly report) Settings - To view the metadata related to the system, such as the site name and installation date, details of equipment at site etc. Alarms and event logs – Alarm should Issue a system update that the system has detected. Passwords should be stored in encrypted format. Website should be accessible on all platforms and be compatible with popular browsers such as IE, Chrome, Firefox, Safari etc. Online Administration: All administration is handled online via a current web browser Audit Trail: Administrators can access logs in the backend on need-basis where they can view changes that have been made to the database for critical information. Data Backup should support PITR (Point-in-time-recovery). Scheduler for auto archival and backup of application and database to a different machine which should be capable of coming online by simply firing a script button in event of downtime of primary server. The database should use encryption at rest to persist the data in database. Secure password protected login for administrative actions in the system. All updates to data gathering hardware should be through OTA (over the air). No static IPs shall be made available at sites. The complete equipment must be programmed with protection CT inside the existing Low Tension switchgear /breaker / Switching Contactors along with multifunction microprocessor digital programmer having Main measurements and functions include: Voltage: phase, line and system values Current: phase values (neutral current calculated) Power: apparent, active and reactive phase and total values Power Factor per phase and total Frequency of measured voltage value HIGH LOW AVERAGE - - value functions for all measurements Maximum demand of power and current values Voltage and current asymmetry Total harmonic distortion ( ): voltage and current THD Energy meters for active, reactive, apparent partial and total values, per phase and system values Hour counter for programmable total and partial hours Phase active power unbalance must saturate sufficiently high to allow a relatively accurate measurement of the fault current by the protection whose operating threshold can be very high. Contd/- to serial item no.5.03 of BoQ
Continuted Serial Item No. 5.00 with built in high Accuracy Limit Factor (ALF) ratio between the nominal overcurrent and the rated current. so that existing switchgear relay must be able to withstand high overcurrent’s also featured with Real accuracy factor ratio between the overcurrent , nominal error and the rated current .with following specifications insulation level voltage .433 KV ratio 100/5A - to 500/5A Core 3 class PS, KPV >= 150 Volts Imag at vk/2<= 30 ma , RCT at 75C<= 2 Ohms short time rating 15 KA for 1 second ,The entire work is to be executed by OEM only approved by GE. The Contractor has to submit Original Purchase Vouchers, Test Certificates & Guarantee Certificate from OEM before installation at site.
Dismantling of old u/s & Supply, installation, commissioning & testing of) Vector Group YNyn0, ON-load Tap motion generator anticlockwise and clockwise on HV side to vary secondary voltage from (+) 5% TO (-) 15% in steps of 1.25%, HV Digital MICROPROCESSOR CARD along with upgrading the existing RTCC panel including replacement of existing manual Relay with new AVR Relay (ISO 9001:2015 CERTIFIED ) , having following specification :-The RTCC shall be upgraded such that it will maintain electrical properties, even under severe overload, under/over voltage and under/over frequency conditions. Input correction range shall be -30% to +20% of nominal input voltage. Upon turn on or restart, the output of the 132/11 kV TFR shall not exceed the specified output regulation limits. if the input voltage or frequency exceeds programmable minimum or maximum set points for a programmable time period (factory set for 10 seconds),When electrical parameters are back within acceptable limits for a programmable time period (factory set for 60 seconds), the output voltage is outside of acceptable programmed limits, the RTCC must give output command to electronically operate connected 132 KV Transformer.. Response Time: RTCC Line Voltage Regulation and Correction Time: Output regulation shall be +5%, -6%, given an input voltage variation of -30% to +30% for nominal, when within +/-5% of the nominal frequency. Load Regulation: No load to full load regulation shall be 3% typical under linear loading. Note: The existing RTCC shall be adjusted so that the combination of line voltage regulation and linear load regulation results in a maximum output voltage variation of +7% to -8% from nominal, when within +/-5% of the nominal frequency. Operating Frequency: The existing RTCC shall be capable of operating at +10% to -15% of the nominal frequency, 50Hz or 60Hz, with programmable high and low limits to alarm and electronically shut down the SF6 Breaker. Limits shall be set to +/-2Hz from nominal and electronic shutdown shall occur if limits are exceeded for 10 seconds. Once back within limits for a programmable time period of 60 seconds, the SF6 Breaker shall automatically restart. Over Voltage/Under Voltage Protection: against UV/OV . An aux. relay is energized to operate an hooter. The UV and OV state is shown on the LCD. You can also set the AVR to get an SMS on your mobile phone in case of OV/UV. The affect in change in voltage takes place only after the time delay (TD) has elapsed as set by the user. In other words, the relay will send command to the motor only after the time delay has elapsed. This is required to avoid the motor start/stop on frequent voltage fluctuations. This delay time can be set from 5 to 125 seconds. Contd/- to serial item no.6.01 of BoQ
Continuted Serial Item No. 6.00 This refers to the drop in line voltage from generating end to transformer primary. The LDC helps the AVR to compensate this drop. The feature is added on request on charge-able basis. In case auxiliary supply to AVR fails (from PT), the AF relay gets activated. You can also set the AVR to get an SMS on your mobile phone in case of auxiliary supply failure. If the OLTC/AVR malfunctions because of any reason for certain preset time (say 10 minutes) then the CF relay will get energised and activated. An alarm can be connected with this relay contacts. Once the controls resume the normal functions, the relay gets de-energized putting the alarm off. All this can be seen on the LCD. You can also set the AVR to get an SMS on your mobile phone in case of control failure of the OLTC AVR. This feature is used to indicate the tap position. The tap position is displayed on the LCD. You can get tap position on your mobile phone also (on request). Card can be monitored and control through a wireless SCADA application from anywhere in the world. You can monitor the complete parameters of a transformer like electrical parameters, winding temperature (sensor required), oil temperature (sensor required), oil level (sensor required), buclotz relay status. oil leakage (sensor required). You can connect 4 X analog sensors (4 - 20 mA OR 0 - 5 volts) to record and monitor the health of the HT transformer. You can connect 4 x digital sensor (pulse/counter) to check the status of transformer Buchholz’s relay, transformers breaker etc.,. You can connect winding temperature sensor, oil temperature sensor, oil level sensor at the analog inputs. Data can be monitored on LCD display of the OLTC AVR. If the AVR is GPRS enabled then you can also monitor the live data on SCADA application. In case a transformer if getting overloaded, you can get an instant alert on 5 mobile numbers so as to take immediate action. Optional feature can also be provided to start an alarm or switch off the breaker and hence the transformer to save it from over-heating, ONLY Original OEM is entitled for work . Contractor has to ensure it.Necessary test certificates & Latest Purchase Vouchers to be scrutnised / approved by Engg-in-Charge & GE first before execution at site . Any Defect occurring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately after completion of work. Contractor has to ensure Post Audit of work, without that completion will not be issued.
Dismentaling of old u/s bank & S/I/T/C Switch Mode Power Supply unit for 11 KV HT Breaker & VCB PANEL fitted with gas pressure spring charge motor unit with Sealed Maintains Free Type Make as approved by GE along with Electronic on line power pack 10000VA required for switching 11 KV Breaker at the mode power failure from State Electricity Board having special features:- Double Conversion On Line , Continuous Voltage & Frequency Regulation High Power Density Built-in Automatic & Manual Bypass, Cold Start Intelligent Battery Management, Lightning and Surge Protection, Sine Wave Output , Network Grade Line Conditioning, Emergency Power Off , Unattended Safe & Graceful Shutdown , Alarms and Indicators, Main Supply: (340V-450V) THREE phase, Multiple Output Voltage: 220 Volts DC ( +/-) 0.5% accuracy with load sustaining capacity 30 Amps for protection Relays & under voltage & no volt coil of SF6 Breaker with proper torque command ,110 volts AC ( +/-) 0.5% accuracy for load handling up to 10 AMPS for metering & Digital & other faults display & 220V AC/DC ( +/-) 0.5% accuracy for loaded current suitable to existing SF6 Breaker spring charge Motors, Overload : 110% of rated load, Power Factor : >90%, with feature of suitable for 10 unit of Breaker to handle tripping & Auto sensor to detectIndications: Mains, Emergency, over load, reverse polarity battery charging with SMPS ON/OFF Switch. (ISO 9001:2015 Certified )
Dismantling of old meters any type / make with replacement and necessary control wiring suitable for each breaker Measurement Sensing Through: DC Hall Effect rating 50 mV to 1000 V DC (Programmable with individually Mounting: Panel Mount /DIN-Rail Mount DIN-Rail Mount Accuracy: Class 1.0 FS Number of Channels: 1 channel voltage & Voltage Input Range: 10V to 1000V DC (48V default). Varieties of range in voltage like 100V DC, 300V DC, 800V DC, 1000V DC, etc (factory settable only) Auxiliary Supply: 15 to 60V AC/ DC Display: 1 row 7 digit LCD. Isolation: 2000 volts AC isolation for 1 minute between communication and other circuits. ENVIRONMENTAL CHARACTERISTICS Humidity: 5% to 95% non-condensing Ingress Protection: IP 51 Operating Temperature: -10ᵒC to +55ᵒC (14ᵒF to 131ᵒF). Storage Temperature: -25ᵒC to +70ᵒC (-13ᵒF to 158ᵒF) MECHANICAL CHARACTERISTICS Dimension Panel Mount: 96 x 96 x 57mm, DIN-Rail Mount: 90 x 90 x 67mm Screw: M3 M2 for current connector and M3 for voltage connector Torque (Max): 1 N-m 0.2 N-m Wire Gauge: 28-16 AWG.
Continuted Serial Item No. 9.00 11. Current L3 12. Neutral Current 13. Frequency 14. System Active Power (kW) 15. Active Power L1 (kW16. Active Power L2 (kW) 17. Active Power L3 (kW18. System Re-active Power (kVAr) 19. Re-active Power L1 (kVAr) 20. Re-active Power L2 (kVAr) 21. Re-active Power L3 (kVAr) 22. System Apparent Power (kVA23. Apparent Power L1 (kVA) 24. Apparent Power L2 (kVA) 25. Apparent Power L3 (kVA) 26. System Power Factor 27. Power Factor L1 28. Power Factor L2 29. Power Factor L3 30. Phase Angle L1 Phase Angle L2 32. Phase Angle L3 33. Import kWh (8 digit resolution)* 34. Export kWh (8 digit resolution)* 35. Ind. kVArh (8 digit resolution)* 36. Cap. kVArh (8 digit resolution)* 37. kVAh (8 digit resolution)* 38. Current Demand 39. KVA Demand 40. KW Import Demand 41. KW Export Demand 42 KVAr Ind. Demand 43 KVAr Cap. Demand 44. Max Current Demand 45. Max KVA Demand 46. Max KW Import Demand 47. Max KW Export Demand 48 Max KVAr Ind. Demand 49 Max KVAr Cap. Demand 50. Run Hour 51. On Hour 52 Number of Interruptions 53. Phase Reversal Indication accurately. Clearance and Creepage distance meets UL- 61010. Programmable starting current in % of 5A secondary. Default 10mA Programmable Auto scrolling time - 1 sec. to 10 sec. (Default 5 sec.) Programmable Energy display - Counter based or Resolution based. Energy resetting at 9999999 kVAh x MF. Front LED pulse 16000 imp/kWh. OLD register to store previously cleared Energy & Load hours. Ampere hour (Ah) & PF average parameter. Phase wise Voltage Sag & Swell Wave Forms. LCD 8 parameter display at a time, 8 Digits energy. Power save mode with Enable/Disable option. Available RS485 communication & optional Ethernet communication (factory configurable). Byte order option - Field Programmable Float / Little Endian / Big End. Optional Features Digital outputs - 4 potential free contacts with programmable time delay. Hysteresis of 1%. Trip time delay: 1 to 180 sec. Pulse output 300/TR/KWh. Analog Input up to 2. Accuracy of class 1% FS. Individual Harmonics up to 63rd order. Demand Controller with 4 Relay outputs. TOD option (Energy & Demand up to 8 slots ). Digital Input up to 4 RTC synchronisation through communication. Analog Output - Two independently programmable to 0-20 mA (or) 4-20 mA Up to 60A or 100A direct measurements using Hanging CT. Datalogger - 6MB optional / Ethernet with 14GB memory for IOT device. Output configurable to any of the parameters from VLL, A, F, W, PF, VA. Dual Source.
Dismantling of old damaged u/s lights & replacement with new S/I/T/C of 22 mm round type light Degree of protection IP65 LED Integral LEDs 12 V, 24 V, 30 V, 48 V, 60...63.5 V, 110 V, 220...230 V AC/DC Colour White, Green, Red, Amber, Blue, Yellow of Ø 22/0.866 in. plastic control and signalling units Make as directed by Engg-in -charge
Note for serial item no. 1.00 to 10.00 of BoQ:- 1. All old unservicable material obtained from serial item no.1.00 to 10.00 shall be deposited in the store yard of AGE EM GE Utility Bathinda by the contractor at his own arrangment. Nothing shall be paid extra to contractor on this account.The Board of Officer as ordered by GE (Utility) Bathinda shall be ascertained the quantity of old unservicable material and shall be depostied accordingly .
M/S Sonu Traders (BID ID -3201081)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .