| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.8 LAccepted-Finance | 1 | Accepted-Finance L-2 | |
| 2 | 2₹17.9 L+₹12,106.90 (0.68%)Rejected-Finance | 2 | Rejected-Finance L-2 | |
| 3 | 3₹19.4 L+₹1.7 L (9.46%)Rejected-Finance 67 AASANI BAS PALANA PALANA BIKANER BIKANER RAJASTHAN 334402 UDYAM RJ 08 0063520 | BIKANER | RAJASTHAN | 334402 | 3 | Rejected-Finance L-3 | |
| 4 | 4₹20.2 L+₹2.4 L (13.4%)Rejected-Finance GALI NO 1 KRISHNA NAGAR MAINPURI | 4 | Rejected-Finance L-4 | |
| 5 | 5₹23.2 L+₹5.4 L (30.6%)Rejected-Finance | 5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | SURESH CHANDRA CONTRACTOR L5 | A K B INFRA L2 | AJ ENTERPRISES L1 | SANJAY KUMAR L4 | S S CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation of foundation in dry soil. including lift up to 1.5m and lead up to 30m. and including back filling watering ramming and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. complete But excluding G.S.T. | 191 | cum | 100 ₹19,100 | 60 ₹11,460 | 59 ₹11,269 | 50 ₹9,550 Lowest | 64 ₹12,224 |
| 2.00 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit foundation including all labour, material T&P etc. | 28.1 | cum | 6,000 ₹1,68,600 | 4,750 ₹1,33,475 | 4,712 ₹1,32,407.2 Lowest | 5,400 ₹1,51,740 | 5,035 ₹1,41,483.5 |
| 3.00 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | 91.7 | cum | 6,500 ₹5,96,050 | 4,900 ₹4,49,330 | 4,325 ₹3,96,602.5 Lowest | 6,500 ₹5,96,050 | 5,200 ₹4,76,840 |
| 4.00 | Reinforced Cement Concrete work for Super structure of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work in all conditions. | 90.9 | cum | 6,500 ₹5,90,850 | 5,500 ₹4,99,950 Lowest | 5,836 ₹5,30,492.4 | 6,800 ₹6,18,120 | 6,225 ₹5,65,852.5 |
| 5.00 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. | 115 | sqm | 800 ₹92,000 | 650 ₹74,750 | 760 ₹87,400 | 350 ₹40,250 Lowest | 810 ₹93,150 |
| 6.00 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 4.2 | MT | 80,000 ₹3,36,000 | 59,895 ₹2,51,559 Lowest | 59,900 ₹2,51,580 | 70,000 ₹2,94,000 | 62,000 ₹2,60,400 |
| 7.00 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. | 37.7 | sqm | 120 ₹4,524 | 90 ₹3,393 Lowest | 90 ₹3,393 Lowest | 100 ₹3,770 | 119.7 ₹4,512.69 |
| 8.00 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work.(Per RM) | 2 | RM | 500 ₹1,000 | 125 ₹250 Lowest | 125 ₹250 Lowest | 500 ₹1,000 | 164.5 ₹329 |
| 9.00 | S/F Tarfelt on Abutment capi/c all cost of materials, T&P etc for proper completion of work /Sqm | 10.4 | sqm | 200 ₹2,080 | 157 ₹1,632.8 Lowest | 157 ₹1,632.8 Lowest | 200 ₹2,080 | 208.6 ₹2,169.44 |
| 10.00 | Supply and Laying of Expansion Joint including cost of all labour, materials, T&P etc. Complete. | 26 | RM | 150 ₹3,900 | 1,400 ₹36,400 | 1,440 ₹37,440 | 110 ₹2,860 Lowest | 1,517 ₹39,442 |
Tender Value
₹23.8 L
EMD Value
₹48,000
Closing Date
11 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER MGCCD 12 ALIGARH
DODHPUR CIVIL LINES ALIGARH
CONSTRUCTION OF DRB AT KM 8.500 OF BANIYAKHERA DY
2026_UPIDC_1174102_1
05/EE/2026-27
Open Tender
Civil Works - Bridges
Item Rate
60 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹649
₹48,000
5 Sept 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in dry soil. including lift up to 1.5m and lead up to 30m. and including back filling watering ramming and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. complete But excluding G.S.T. | - | cum | - | - |
| 2 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit foundation including all labour, material T&P etc. | - | cum | - | - |
| 3 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | - | cum | - | - |
| 4 | Reinforced Cement Concrete work for Super structure of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work in all conditions. | - | cum | - | - |
| 5 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. | - | sqm | - | - |
| 6 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | - | MT | - | - |
| 7 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. | - | sqm | - | - |
| 8 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work.(Per RM) | - | RM | - | - |
| 9 | S/F Tarfelt on Abutment capi/c all cost of materials, T&P etc for proper completion of work /Sqm | - | sqm | - | - |
| 10 | Supply and Laying of Expansion Joint including cost of all labour, materials, T&P etc. Complete. | - | RM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
onebook.pdf
Tender Documents • 1.20 MB
BOQ_2205757.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .