Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹8.0 L+₹15,595.78 (2.00%)Rejected-Finance DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC Recommendation |
Tender Value
₹7.8 L
EMD Value
₹9,800
Closing Date
31 Mar 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Supply and installation of sal wood drum lagging in Electrical winder of pit no 6 of CM project at Nakrakonda Kumardihi B colliery under Bankola Area (retender).
2025_ECL_332725_1
ECL/GM/BA/E TENDER/24-25/ENM/379(02) Dt 17.03.2025
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹9,800
5 Jul 2025
17 Mar 2025
1 Apr 2025
17 Mar 2025
31 Mar 2025
17 Mar 2025
17 Mar 2025 - 21 Mar 2025
Amount
Item Description/ Heading
GB1 Conveyor belt Supply at work site Sal wood windingengine drum lagging, size (4"x4"x36").
Supply at work site M20X150mm, HT bolt, 10.9 grade,Half thread.
Supply at work site M20 HT nut, 10.9 grade, Half thread
Dismantling of old and damaged drum lagging from the drum and transporting the same to unit store. (sk-Rs.1122- 2Heads, ssk-Rs.1082- 2Heads, usk- Rs.1042-6Heads) =Rs.10,660/shift
Dismantling of 32mm winding rope on either end of drum and transporting the same to unit store by using gas cutting (sk-Rs.1122- 2Heads, ssk-Rs.1082- 2Heads, usk- Rs.1042- 6Heads)= Rs.10,660/shift.
Cleaning of complete 4 nos. of circumference wooden lagging racer for fitting of new lagging (ssk-Rs.1082-1 Heads, usk- Rs.1042- 5Heads)= Rs.10,660/shift.
Sizing of new wooden lagging as per drum periphery,drilling holes on either end and fitting the same on drum (sk-Rs.1122- 2Heads, ssk-Rs.1082- 2Heads, usk-Rs.1042- 6Heads)= Rs.10,660/shift
Total impact of GST for the purpose of CTC
SABIR CONSTRUCTION (BID ID -1145794)
techsummary_344909.pdf
PDF • 2.87 MB
finsummary_344909.pdf
PDF • 2.87 MB
WOENM379.pdf
PDF • 3.77 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .