Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
23 Sept 2023, 12:00 pmClosed
SE ETC UPPTCL GREATER NOIDA
400 KV SUB STATION PALI GAUTAM BUDH NAGAR GREATER NOIDA
ELECTRICAL WORK
2023_UPTCL_835211_1
ST-22/2023-24ETC/GN
Open Tender
Electrical Works
Item Rate
30 days
HAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ELECTRICITY 400 KV SUB STATION GREATER NOIDA
₹2,000
GREATER NOIDA
21 Dec 2023
5 Sept 2023
23 Sept 2023
5 Sept 2023
23 Sept 2023
5 Sept 2023
6 Sept 2023
Amount
Complete dismantling of 132/33KV Transformer C&R panel after removing of their control cable AC/DC supply cable & earthing the work will be carried out at 132KV S/S Dasna.
Erection of 132/33KV Transformer C&R panel after shifting from store site place of said place same substation. Earthing as these panels with existing earthing flat by cutting & welding. The work will be carried out at 132KV S/S Dasna.
Opening the bottom of 132/33KV Transformer C&R panel and making gland (providing by department) and fix control cables in 132/33KV Transformer C&R panel. Termination of these controls cable after proper ferule (Providing by contractor) after tracking of control cables and as directed by SDO/JE. Laying of additional control cable and termination (if required) for proper operation of CB`s (Control cable provided by department). The work will be carried out at 132KV S/S Dasna.
Complete dismantling of 132KV Double feeder control panel after removing of their control cable AC/DC supply cable & earthing the work will be carried out at 132KV S/S Dasna.
Erection of 132KV Double feeder control panel after shifting from store site place of said place same substation. Earthing as these panels with existing earthing flat by cutting & welding. The work will be carried out at 132KV S/S Dasna.
Opening the bottom of 132KV Double feeder control panel and making gland (providing by department) and fix control cables in 132KV Double feeder control panel. Termination of these controls cable after proper ferule (Providing by contractor) after tracking of control cables and as directed by SDO/JE. Laying of additional control cable and termination (if required) for proper operation of CB`s (Control cable provided by department). The work will be carried out at 132KV S/S Dasna.
Complete dismantling of 132 KV TBC panel after removing of their control cable AC/DC supply cable & earthing the work will be carried out at 132KV S/S Dasna.
Erection of 132 KV TBC panel after shifting from store site place of said place same substation. Earthing as these panels with existing earthing flat by cutting & welding. The work will be carried out at 132KV S/S Dasna.
Opening the bottom of 132 KV TBC panel and making gland (providing by department) and fix control cables in 132 KV TBC panel. Termination of these controls cable after proper ferule (Providing by contractor) after tracking of control cables and as directed by SDO/JE. Laying of additional control cable and termination (if required) for proper operation of CB`s (Control cable provided by department). The work will be carried out at 132KV S/S Dasna.
Complete dismantling of 132KV feeder relay panel after removing of their control cable AC/DC supply cable & earthing the work will be carried out at 132KV S/S Dasna.
Erection of 132KV feeder relay panel after shifting from store site place of said place same substation. Earthing as these panels with existing earthing flat by cutting & welding. The work will be carried out at 132KV S/S Dasna.
Opening the bottom of 132KV feeder relay panel and making gland (providing by department) and fix control cables in 132KV Double feeder control panel. Termination of these controls cable after proper ferule (Providing by contractor) after tracking of control cables and as directed by SDO/JE. Laying of additional control cable and termination (if required) for proper operation of CB`s (Control cable provided by department). The work will be carried out at 132KV S/S Dasna.
Removal of defective, damaged and spare various size control cable from cable trenches.
Replacement of 33kV CTJB from the old rusted CTJB after dismantling it and with interconnection of various CT core as per requirement through 2.5sq.mm. cable. including earthing work.
SARASWAT ELECTRICALS
TIRUPATI ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .