Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Technical | L1 | Admitted-Technical responsive | |
| 2 | L2₹5.1 L+₹15,300 (3.07%)Admitted-Technical | L2 | Admitted-Technical responsive | |
| 3 | L3₹5.2 L+₹19,160 (3.84%)Admitted-Technical | L3 | Admitted-Technical responsive |
| Sl No | Description | Qty | Unit | Rather Engineering Works L1 | haris enterprise L2 | SS ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Providing, ,transportation ,installation, testing and Commissioning of ST Poles 8 Mtr long (410-SP-15) including excavation of pit and back filling soil & consolidating each deposit layer of by ramming and watering etc. (as per the latest specification and drawing approved by the department). | 21 | No | 14,900 ₹3,12,900 Lowest | 15,000 ₹3,15,000 | 15,500 ₹3,25,500 |
| 2.00 | Providing, and fixing of GI Clamps with LT Shackle insulators including nuts and bolts.(GI Back Clamps to be fixed with out drilling/punching of poles). | 53 | No's | 350 ₹18,550 Lowest | 500 ₹26,500 | 450 ₹23,850 |
| 3.00 | Providing and Laying, testing and commissioning and stringing of overhead 0.05 ACSR conductor (Rabbit) on cross arms through insulators including binding and twisting with soft aluminium wire both side of insulator complete in all respects (as per the latest specification and drawing approved by the department). | 1.34 | Km | 63,000 ₹84,420 Lowest | 63,000 ₹84,420 Lowest | 63,000 ₹84,420 Lowest |
| 4.00 | Providing and fixing of LT pole spiral earthing 125 SWG Complete (as per latest specifications and drawing adopted /approved by the department. | 21 | No | 290 ₹6,090 Lowest | 290 ₹6,090 Lowest | 350 ₹7,350 |
| 5.00 | Painting of pole with one coat of Red-Oxide and Two coats of Aluminium paint (including cost of paint) | 21 | No | 399 ₹8,379 Lowest | 399 ₹8,379 Lowest | 399 ₹8,379 Lowest |
| 6.00 | Supply and laying of Cement Bottoming 1:2:4 mix as per REC standards 0 .45 cum/pole including muffing 20 cm above ground level plaster and curing for 8 Mtr ST poles respectively (the leftover pit after concreting to be filled with soil and boulders). | 21 | Job | 3,250 ₹68,250 Lowest | 3,500 ₹73,500 | 3,250 ₹68,250 Lowest |
Tender Value
₹4.9 L
Closing Date
3 Sept 2021, 5:00 pmClosed
Executive Engineer Electric Division Sumbal
Executive Engineer Electric Division Sumbal
Installation of Tubular Poles and replacement of LT Conductor at Odina-B under B2V Programme
2021_PDD_135734_1
EDS-17 of 2021-22
Open Tender
Electrical Works
Turn-key
15 days
Sumbal
As per SBD
8 documents required · 8 mandatory
₹500
Executive Engineer Electric Division Sumbal
Exempted
20 Sept 2021
23 Aug 2021
6 Sept 2021
23 Aug 2021
3 Sept 2021
23 Aug 2021
23 Aug 2021 - 31 Aug 2021
stage.html
html • 0.03 MB
tech_eval.pdf
finance_272391.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .