Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAdmitted-Finance NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | ₹44.4 L | L1 | Admitted-Finance |
| 2 | L2₹46.0 LAdmitted-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹46.0 L | L2 | Admitted-Finance |
| 3 | L3₹46.6 LAdmitted-Finance 86 7 CONVENT ROAD MITTAPUDUR SALEM DISTRICT TAMIL NADU 636016 | MITTAPUDUR | SALEM | TAMIL NADU | 636016 | ₹46.6 L | L3 | Admitted-Finance |
| 4 | L4₹47.6 LAdmitted-Finance M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | ₹47.6 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical documents are not found in order |
| Sl No | Description | Qty | Unit | R UVARAJAN L4 | M/s MSK Construction L2 | N VEERAMANI ( LAKSHMI ENGINEERING SERVICES ) L1 | V K L CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Surface dressing of the ground including removal of vegetation and inequalities not exceeding 15 cm in depth and disposal of rubbish with lead up to 50 m and lift up to 1.5 m, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 1,378 | 1M2 | 38 ₹52,364 | 100 ₹1.4 L | 100 ₹1.4 L | 36 ₹49,608 |
| 1.02 | Site clearance including careful removal of damaged barbed wire fencing with broken L-angle posts, stacking serviceable materials in one place and conveying debris to the designated dumping yard, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 132.1 | 1Rmt | 262 ₹34,610.20 | 400 ₹52,840 | 300 ₹39,630 | 250 ₹33,025 |
| 1.03 | Excavation work by mechanical or manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides, ramming of bottoms, lift up to 1.5 m, disposal of surplus soil within 50 m lead, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 172.08 | 1M3 | 285 ₹49,042.80 | 300 ₹51,624 | 300 ₹51,624 | 270 ₹46,461.60 |
| 1.04 | Supplying and filling sand in foundation/basement in layers not exceeding 15 cm thickness, well watered, rammed and consolidated, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 18.13 | 1M3 | 2,613 ₹47,373.69 | 3,000 ₹54,390 | 2,300 ₹41,699 | 2,250 ₹40,792.50 |
| 1.05 | Cement Concrete 1:4:8 (1 cement : 4 sand : 8 hard broken stone jelly) using 40 mm gauge granite stone jelly for foundation, including dewatering wherever necessary, laid in layers not exceeding 15 cm thickness, well rammed, consolidated and cured, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 18.05 | 1M3 | 7,450 ₹1.3 L | 8,978.24 ₹1.6 L | 4,500 ₹81,225 | 7,350 ₹1.3 L |
| 1.06 | Random Rubble Masonry with hard stone in foundation and plinth, including levelling up with cement concrete 1:6:12 up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 140.81 | 1M3 | 8,128 ₹11.4 L | 8,200 ₹11.5 L | 8,000 ₹11.3 L | 7,900 ₹11.1 L |
| 1.07 | Coursed Rubble Masonry (First Sort) with hard stone in foundation and plinth, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 66.65 | 1M3 | 9,735 ₹6.5 L | 10,000 ₹6.7 L | 9,750 ₹6.5 L | 9,500 ₹6.3 L |
| 1.08 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand), complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 250.61 | 1M2 | 420 ₹1.1 L | 500 ₹1.3 L | 450 ₹1.1 L | 400 ₹1.0 L |
| 1.09 | Providing and laying 50 mm thick coping using 1:2:4 concrete over CR stone masonry dwarf wall with posts, including consolidation, curing and 20 mm thick cement plaster in 1:4 mix on top surface, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 155.84 | 1M2 | 1,008 ₹1.6 L | 2,000 ₹3.1 L | 2,000 ₹3.1 L | 1,000 ₹1.6 L |
| 1.10 | Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.(for Grills) | 11,940.37 | 1KG | 182.5 ₹21.8 L | 140 ₹16.7 L | 140 ₹16.7 L | 180 ₹21.5 L |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
10 Mar 2026, 11:00 amClosed
SA ASI Chennai
O/o Superintending Archaelogist, ASI, Chennai Circle, Chennai-09
UPoHA to providing MS grill fencing at Megalithic Cists and Cairns, Settupattu 2025-26
2026_ASI_899447_1
T-15014/33/2026-Chennai Circle
Open Tender
Civil Works - Buildings
180 days
As per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.2 L
Yes
12 Mar 2026
19 Feb 2026
11 Mar 2026
19 Feb 2026
10 Mar 2026
19 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Archaeological Survey of India, Chennai Circle, Fort St.George,Chennai-9
Name of Work: Execution of Work to UPoHA to providing MS grill fencing at Megalithic Cists and Cairns, Settupattu 2025-26
Contract No: 044-25670397 (Rates should be quoted inclusive of GST )
Name of the Bidder/ Bidding Firm / Company :
Item No Description and specification of items of work to be executed Item Code / Make Specification / Quantities to be executed Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency UNIT RATE (Including Taxes) In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1.01 Surface dressing of the ground including removal of vegetation and inequalities not exceeding 15 cm in depth and disposal of rubbish with lead up to 50 m and lift up to 1.5 m, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item1 1M2 Excess(+) Full Conversion INR
1.02 Site clearance including careful removal of damaged barbed wire fencing with broken L-angle posts, stacking serviceable materials in one place and conveying debris to the designated dumping yard, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item2 1Rmt Excess(+) Full Conversion INR
1.03 Excavation work by mechanical or manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides, ramming of bottoms, lift up to 1.5 m, disposal of surplus soil within 50 m lead, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item3 1M3 Excess(+) Full Conversion INR
1.04 Supplying and filling sand in foundation/basement in layers not exceeding 15 cm thickness, well watered, rammed and consolidated, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item4 1M3 Excess(+) Full Conversion INR
1.05 Cement Concrete 1:4:8 (1 cement : 4 sand : 8 hard broken stone jelly) using 40 mm gauge granite stone jelly for foundation, including dewatering wherever necessary, laid in layers not exceeding 15 cm thickness, well rammed, consolidated and cured, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge item5 1M3 Excess(+) Full Conversion INR
1.06 Random Rubble Masonry with hard stone in foundation and plinth, including levelling up with cement concrete 1:6:12 up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item6 1M3 Excess(+) Full Conversion INR
1.07 Coursed Rubble Masonry (First Sort) with hard stone in foundation and plinth, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item7 1M3 Excess(+) Full Conversion INR
1.08 Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand), complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item8 1M2 Excess(+) Full Conversion INR
1.09 Providing and laying 50 mm thick coping using 1:2:4 concrete over CR stone masonry dwarf wall with posts, including consolidation, curing and 20 mm thick cement plaster in 1:4 mix on top surface, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item9 1M2 Excess(+) Full Conversion INR
1.1 Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.(for Grills) item10 1KG Excess(+) Full Conversion INR
1.11 Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.)(For Gate) item11 1KG Excess(+) Full Conversion INR
1.12 Painting with two coats of enamel paint over primed surface, including cost of materials and labour, complete, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item12 1M2 Excess(+) Full Conversion INR
1.13 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand Zone-III : 4 graded stone aggregate 20 mm nominal size), excluding centering and shuttering, for all works up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. item12 1M3 Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Location: Quarters 1 to 8. (Block 1 to 4) Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
TenderDocumentSettupattu.pdf
Tender Documents • 39.12 MB
BOQ_945411.xls
BOQ • 0.24 MB