Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAccepted-AOC NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | ₹44.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹46 L+₹1.6 L (3.57%)Rejected-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹46 L+₹1.6 L (3.57%) | L2 | Rejected-Finance L2 |
| 3 | L3₹46.6 L+₹2.1 L (4.83%)Rejected-Finance 86 7 CONVENT ROAD MITTAPUDUR SALEM DISTRICT TAMIL NADU 636016 | MITTAPUDUR | SALEM | TAMIL NADU | 636016 | ₹46.6 L+₹2.1 L (4.83%) | L3 | Rejected-Finance L3 |
| 4 | L4₹47.6 L+₹3.2 L (7.21%)Rejected-Finance M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | ₹47.6 L+₹3.2 L (7.21%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical documents are not found in order |
| Sl No | Description | Qty | Unit | R UVARAJAN L4 | M/s MSK Construction L2 | N VEERAMANI ( LAKSHMI ENGINEERING SERVICES ) L1 | V K L CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Surface dressing of the ground including removal of vegetation and inequalities not exceeding 15 cm in depth and disposal of rubbish with lead up to 50 m and lift up to 1.5 m, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 1,378 | 1M2 | 38 ₹52,364 | 100 ₹1,37,800 | 100 ₹1,37,800 | 36 ₹49,608 Lowest |
| 1.02 | Site clearance including careful removal of damaged barbed wire fencing with broken L-angle posts, stacking serviceable materials in one place and conveying debris to the designated dumping yard, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 132.1 | 1Rmt | 262 ₹34,610.2 | 400 ₹52,840 | 300 ₹39,630 | 250 ₹33,025 Lowest |
| 1.03 | Excavation work by mechanical or manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides, ramming of bottoms, lift up to 1.5 m, disposal of surplus soil within 50 m lead, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 172.08 | 1M3 | 285 ₹49,042.8 | 300 ₹51,624 | 300 ₹51,624 | 270 ₹46,461.6 Lowest |
| 1.04 | Supplying and filling sand in foundation/basement in layers not exceeding 15 cm thickness, well watered, rammed and consolidated, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 18.13 | 1M3 | 2,613 ₹47,373.69 | 3,000 ₹54,390 | 2,300 ₹41,699 | 2,250 ₹40,792.5 Lowest |
| 1.05 | Cement Concrete 1:4:8 (1 cement : 4 sand : 8 hard broken stone jelly) using 40 mm gauge granite stone jelly for foundation, including dewatering wherever necessary, laid in layers not exceeding 15 cm thickness, well rammed, consolidated and cured, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 18.05 | 1M3 | 7,450 ₹1,34,472.5 | 8,978.24 ₹1,62,057.23 | 4,500 ₹81,225 Lowest | 7,350 ₹1,32,667.5 |
| 1.06 | Random Rubble Masonry with hard stone in foundation and plinth, including levelling up with cement concrete 1:6:12 up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 140.81 | 1M3 | 8,128 ₹11,44,503.68 | 8,200 ₹11,54,642 | 8,000 ₹11,26,480 | 7,900 ₹11,12,399 Lowest |
| 1.07 | Coursed Rubble Masonry (First Sort) with hard stone in foundation and plinth, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 66.65 | 1M3 | 9,735 ₹6,48,837.75 | 10,000 ₹6,66,500 | 9,750 ₹6,49,837.5 | 9,500 ₹6,33,175 Lowest |
| 1.08 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand), complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 250.61 | 1M2 | 420 ₹1,05,256.2 | 500 ₹1,25,305 | 450 ₹1,12,774.5 | 400 ₹1,00,244 Lowest |
| 1.09 | Providing and laying 50 mm thick coping using 1:2:4 concrete over CR stone masonry dwarf wall with posts, including consolidation, curing and 20 mm thick cement plaster in 1:4 mix on top surface, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 155.84 | 1M2 | 1,008 ₹1,57,086.72 | 2,000 ₹3,11,680 | 2,000 ₹3,11,680 | 1,000 ₹1,55,840 Lowest |
| 1.10 | Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.(for Grills) | 11,940.37 | 1KG | 182.5 ₹21,79,117.53 | 140 ₹16,71,651.8 Lowest | 140 ₹16,71,651.8 Lowest | 180 ₹21,49,266.6 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
10 Mar 2026, 11:00 amClosed
SA ASI Chennai
O/o Superintending Archaelogist, ASI, Chennai Circle, Chennai-09
UPoHA to providing MS grill fencing at Megalithic Cists and Cairns, Settupattu 2025-26
2026_ASI_899447_1
T-15014/33/2026-Chennai Circle
Open Tender
Civil Works - Buildings
Works
180 days
As per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.2 L
Yes
11 Sept 2026
19 Feb 2026
11 Mar 2026
19 Feb 2026
10 Mar 2026
19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Surface dressing of the ground including removal of vegetation and inequalities not exceeding 15 cm in depth and disposal of rubbish with lead up to 50 m and lift up to 1.5 m, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 1,378 | 1M2 | - | - |
| 1.02 | Site clearance including careful removal of damaged barbed wire fencing with broken L-angle posts, stacking serviceable materials in one place and conveying debris to the designated dumping yard, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 132.1 | 1Rmt | - | - |
| 1.03 | Excavation work by mechanical or manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides, ramming of bottoms, lift up to 1.5 m, disposal of surplus soil within 50 m lead, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 172.08 | 1M3 | - | - |
| 1.04 | Supplying and filling sand in foundation/basement in layers not exceeding 15 cm thickness, well watered, rammed and consolidated, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 18.13 | 1M3 | - | - |
| 1.05 | Cement Concrete 1:4:8 (1 cement : 4 sand : 8 hard broken stone jelly) using 40 mm gauge granite stone jelly for foundation, including dewatering wherever necessary, laid in layers not exceeding 15 cm thickness, well rammed, consolidated and cured, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge | 18.05 | 1M3 | - | - |
| 1.06 | Random Rubble Masonry with hard stone in foundation and plinth, including levelling up with cement concrete 1:6:12 up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 140.81 | 1M3 | - | - |
| 1.07 | Coursed Rubble Masonry (First Sort) with hard stone in foundation and plinth, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 66.65 | 1M3 | - | - |
| 1.08 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand), complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 250.61 | 1M2 | - | - |
| 1.09 | Providing and laying 50 mm thick coping using 1:2:4 concrete over CR stone masonry dwarf wall with posts, including consolidation, curing and 20 mm thick cement plaster in 1:4 mix on top surface, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. | 155.84 | 1M2 | - | - |
| 1.1 | Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.(for Grills) | 11,940.37 | 1KG | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
TenderDocumentSettupattu.pdf
Tender Documents • 39.12 MB
BOQ_945411.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .