Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC RCP GURUDWARA ROAD WARD NO 29 SURATGARH SRI GANGANAGAR 335804 | SURATGARH | SRI GANGANAGAR | RAJASTHAN | 335804 | L1 | Accepted-AOC VALID | |
| 2 | L2₹12.6 L+₹1.6 L (14.7%)Rejected-Finance | L2 | Rejected-Finance NOT BEING LOWEST | |
| 3 | L3₹13.9 L+₹2.9 L (26.4%)Rejected-Finance 114 SHASTRI NAGAR MEERUT | MEERUT | UTTAR PRADESH | 245206 | L3 | Rejected-Finance NOT BEING LOWEST |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
21 Jun 2021, 6:00 pmClosed
GE (AF) SURATGARH
GE (AF) SURATGARH
REPAIR OF STEEL FURNITURE AT AF STATION SURATGARH
2021_MES_445345_1
8876/E8
Open Tender
Civil Works
Item Rate
270 days
GE (AF) SURATGARH
AS PER TENDER DOCUMENTS
10 documents required · 10 mandatory
₹500
GE (AF) SURATGARH
₹30,000
Yes
28 Oct 2021
24 May 2021
23 Jun 2021
24 May 2021
21 Jun 2021
7 Jun 2021
Amount
BOQ( REPAIR TO STEEL FURNITURE AT AF STATION SURATGARH)
Almirah Large Steel with Shelves (Drawing No. FD-1031) Taking out old unservicable components of Almirah large Steel and Supply and fixing of new components in replacement as per shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New GI lock 4 levers with duplicate keys
New Locking device as per existing type and as directed by Engineer in charge.
New steel Handle cromium plated 150 mm.
New Steel leg made out of 1 mm thick MS Sheet
New Shelve made out of 1 mm thick MS Sheet..
Fixing of shelve in existing position with appropriate size MS clamps as directed.
Repair of loose door by replacing unservicable existing hinges, fittings (Nut & Bolts, Steel Screw/Revits) and adjustment for smooth functioning , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
De-rusting, denting scrapping, filling with putty including preparation of old steel surfaces and applying one coat of synthetic enamel paint OG internally and externally with spray gun , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Almirah Medium Steel with Shelve (Drawing No. FD-1032) : Taking out old unservicable components of Almirah Medium Steel and Supply and fixing of new components in replacement as per shape and size as existing all as ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New GI lock 4 levers with duplicate keys
New Locking device as per existing type and as directed by Engineer in charge.
New steel Handle chromium plated 150 mm,
New Steel leg made out of 1 mm thick MS Sheet
New Shelve made out of 1 mm thick MS Sheet.
Fixing of shelve in existing position with appropriate size MS rivet as directed.
Repair of loose door by replacing unservicable existing hinges, fittings (Nut & Bolts, Steel Screw/Revits) and adjustment for smooth functioning as specified.
De-rusting, denting scrapping, filling with putty including preparation of old steel surfaces and applying one coat of synthetic enamel paint OG internally and externally with spray gun , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Charpoy folding (Drawing No. FD-388(R)) : Taking out old unservicable components of Charpoy forlding and Supply and fixing of new components in replacement as per shape and size as existing all as , complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New top made out of ply wood BWR commercial 12mm thick of approved make, size as per existing in two pieces including fixing to frame with 08 Nos flat head nut and bolts complete all as directed.
New side legs made of 25mm dia 16 Gauge MS conduit pipe including rivets and MS flats as required complete all as directed.
New middle legs made of 25mm dia 16 Gauge MS conduit pipe including rivets and MS flats as required complete all as directed.
New stiffner made of 25mm dia 16 Gauge MS conduit pipe including rivets and MS flats as required complete all as directed.
Removing the unservicable rubber shoes and supply and fixing of new rubber / PVC shoes of best quality complete all as directed.
Material and labour for electric arc welding of broken joints of charpoy folding as required complete all as directed.
Painting to frame of Charpoy folding with OG colour synthetic enamel paint including preparationof surface after removing dust, old paint, dirtt complete all as directed by Engineer-in-Charge.
Locker Bedside Steel (Drawing No. FD-257 & 1029) : Taking out old unservicable components of Locker Steel and Supply and fixing of New Components as per Shape and size as existing , complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New steel Bow handle chromium plated 100 mm Heavy duty.
New Steel hanging Rod 20 mm dia CP conduit pipe of wall thickness 1.25 mm
New Steel socket 25 mm dia chromium plated with fixing steel screw.
Repair of loose door by replacing unservicable existing hinges, fittings and adjustment for smooth functioning , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
New steel hasp and stable 75 mm CP fixed with revits to the shutters , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
New Steel Tower bolt 75 mm welded to the shutter as , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
New Steel leg made out of 1 mm thick MS Sheet.
De-rusting, denting scrapping, filling with putty including preparation of old steel surfaces and applying one coat of synthetic enamel paint OG internally and externally with spray gun , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Book Case Steel (Drawing No. FD-1028) : Taking out old unservicable components of Book Case Steel and Supply and fixing of New Components as per Shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New GI lock 4 levers with duplicate keys
New steel bow Handle cromium plated 100 mm
New glass pane 3 mm thick
Fixing of loose shutter in existing position with appropriate size clips and sliding roller as existing and making the sliding shutter for easy moving.
De-rusting, denting scrapping, filling with putty including preparation of old steel surfaces and applying one coat of synthetic enamel paint OG internally and externally with spray gun , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Charpoy MS Tube (Drawing No. CE AF /STD/168/06) : Taking out old unservicable components of Charpoy MS tube and Supply and fixing of new components in replacement as per shape and size as existing all as , complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New 12mm BWR Phenol bonded commercial ply of existing size complete all as directed.
New 18mm both side prelaminated particle board of headboad screweed to MS strip on frame.
New rubber Shoes of best quality for legs.
Material and labour for electric arc welding of broken joints of charpoy MS tube as required complete all as directed.
Painting to frame of Charpoy MS tube with OG colour synthetic enamel paint including preparationof surface after removing dust, old paint, dirtt complete all as directed by Engineer-in-Charge.
Table Dinning Ors (Drawing No. FD-165) : Taking out old unservicable components of Table Dinning ORs and Supply and fixing of New Components in replacement as per Shape and size as exiisting ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New legs.
New Hard rubber shoes for leg.
Welding to the entire frame and painting to the frame with one coat of synthetic enamel OG paint after preparation of steel surface.
Welding as necessary and painting to the frame with one coat of synthetic enamel OG paint after preparation of steel surface.
New top made out of 18 mm thick block board covered on top with 22 guage aluminium sheet, and fixed to frame with 40 mm steel screw.
Table Office Clerk Steel (Drawing No. FD-381 & 1004) : Taking out old unservicable components of Table Office Clerk Steel and Supply and fixing of New Components in replacement as per Shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New top made of 18 mm thick pre-laminated particle board teak face duly provided 4 mm thick TW beading alround the top duly polished with two coats of french polish. Make-Bhutan board/ Novapan/Archid
New GI lock 4 lever with 2 keys
New leg/ Stiffner.
New top rails
Repairing of drawer by replacement of MS channel providing welding & denting.
New hard rubber shoes for leg.
De-rusting, denting, scrapping, filling with putty including preparation of old steel surfaces and applying by spray gun one coat of synthetic enamel paint OG , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Table Office Offrs Steel (Drawing No. FD-84 & 1003) : Taking out old unservicable components of Table Offrs steel and Supply and fixing of New Components in replacement as per Shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New top made of 18 mm thick pre-laminated particle board teak face duly provided 4 mm thick TW beading alround the top duly polished with two coats of french polish. Make-Bhutan board/ Novopan/Archid
New GI lock 4 lever with 2 keys
New leg/ Stiffner.
New top rails
New Hard rubber shoes for leg.
Repairing of drawer by replacement of MS channel providing welding & denting.
De-rusting, denting, scrapping, filling with putty including preparation of old steel surfaces and applying by spray gun one coat of synthetic enamel paint OG, complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Table Steel 900 x 600 x 760mm with drawer (Drawing No. FD-1008) : Taking out old unservicable components of Table Steel 900 x 600 x 760mm and Supply and fixing of New Components in replacement as per Shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New top made of 18 mm thick pre-laminated particle board teak face duly provided 4 mm thick TW beading alround the top duly polished with two coats of french polish.
New GI lock 4 lever with 2 keys
New leg made out of 25 mm square tube 1.6 mm wall thickness.
New drawer including MS channelmade ou of 1.0 mm thick PBI sheet.
New hard rubber shoes for leg.
De-rusting, denting, scrapping, filling with putty including preparation of old steel surfaces and applying by spray painting one coat of synthetic enamel paint OG , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Table Steel 900 x 900 x 760mm (Drawing No. FD-1009) : Taking out old unservicable components of Table Steel 900 x 900 x 760mm and Supply and fixing of New Components in replacement as per Shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New top made of 18 mm thick pre-laminated particle board teak face duly provided 4 mm thick TW beading alround the top duly polished with two coats of french polish. Make-Bhutan board/ Novapan/Archid.
New leg top rails/stiffner made out of 25 mm square tube 1.6 mm wall thickness.
New hard rubber shoes for leg.
De-rusting, denting, scrapping, filling with putty including preparation of old steel surfaces and applying by spray painting one coat of synthetic enamel paint OG , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Chair CB Steel with Arms (Drawing No. FD- 75 (M) : Taking out old unservicable components of Chair CB Steel with arms and Supply and fixing of New Components in replacement as per Shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New MS cleat of size 50 x 25 x 3 mm and welding of joints and cracks to frame.
Removing of existing paint by scraping with abrasive cloth and painting one coat with synthetic enamel paint OG on steel surfaces after preparation of surfaces, complete all as specified shown in drawing or as directed byEngineer-in-Charge..
New seat frame made out of well seasoned 1st class Hard wood duly canning with half round PVC cane 2mm wide 0.4mm thick, border with 3mm wide 0.5 mm thick.
New Back frame made out of well seasoned 1st class Hard wood duly canning with half round PVC cane 2mm wide 0.4mm thick, border with 3mm wide 0.5 mm thick.
New PVC cap
New hard rubber shoes.
New arms of well seasoned 1st class HW and applying two coats of synthetic enamal glossy black.
Chair CB Steel without Arms (Drawing No. FD- 75 (M) Taking out old unservicable components of Chair CB Steel without arms and Supply and fixing of New Components in replacement as per Shape and size as existing ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New MS cleat of size 50 x 25 x 3 mm and welding of joints and cracks to frame.
Removing of existing paint by scraping with abrasive cloth and painting one coat with synthetic enamel paint OG on steel surfaces after preparation of surfaces ,complete all as specified shown in drawing or as directed by Engineer-in-Charge.
New seat frame made out of well seasoned 1st class Hard wood duly canning with half round PVC cane 2mm wide 0.4mm thick, border with 3mm wide 0.5 mm thick.
New Back frame made out of well seasoned 1st class Hard wood duly canning with half round PVC cane 2mm wide 0.4mm thick, border with 3mm wide 0.5 mm thick.
New PVC cap
New hard rubber shoes.
Chair Varandha (Drawing No. FD- 359 & FD/MAP-II/06): Taking out old unservicable components of Chair Varandha and Supply and fixing of New Components in replacement as per Shape and size as exiisting ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New PVC seat and back 4 mm thick with weight not less than 1.85 kg and grooves 90X10 mm 10 Nos on seat and back , complete all as specified shown in drawing or as directed by Engineer-in-Charge. Make: AMCO/CELLO/MILTON/HARMONY
Welding of broken joint on frame.
New Hard rubber shoes for leg.
Painting the entire frame with one coat of synthetic enamel white paint after preparation of steel surface removing rust, dirt etc. , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Chair Easy Steel (Drawing No. FD- 121(M) Taking out old unservicable components of Chair Easy Steel and Supply and fixing of New Components in replacement as per Shape and size as exiisting ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New leg/stiffner made out of 19 mm square steel pipe of 16 gauge and gas welding to the frame.
New seat made of polyurethene form covered with rexin as per drawing and as directed.
New Back made of polyurethene form covered with rexin as per drawing and as directed.
New Arm made out of 1st class HW shisham fixed on steel frame with steel screws as per drawing.
New Hard rubber shoes for leg.
Welding to the entire frame and painting to the frame with one coat of synthetic enamel black paint after preparation of steel surface.
Chair School with Hand Board (Drawing No. FD/E6/MAP/05): Taking out old unservicable components of Chair school with Hand Board and Supply and fixing of New Components in replacement as per Shape and size as exiisting ,complete all as specified and shown on drawing and as driected by Engineer-in-charge for the following items of furniture :-
New One piece PVC seat and back of Chair School with HB fixed to frame with steel screw.
New Hand Board of 18 mm thick Prelaminated particle board with PVC edging screwd to 25 mm dia hollow steel pipe , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Welding of broken joints of frame, complete all as specified shown in drawing or as directed by Engineer-in-Charge.
New Hard rubber shoes for leg , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Painting entire frame with one coat of synthetic enamel black paint after preparation of steel surface , complete all as specified shown in drawing or as directed by Engineer-in-Charge.
Contract Amount shall be derived after affecting the amount of Schedule of Credit in General Summary on serial page No 16 (R) of tender documents.
shubham enterprises
JAIN TRADERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .