Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-Finance 0 | ₹8.2 L | L1 | Accepted-Finance Financial Evaluation |
| 2 | L2₹8.2 LAccepted-Finance | ₹8.2 L | L2 | Accepted-Finance Financial Evaluation |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Instrested |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Instrested |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
1 Dec 2025, 9:00 amClosed
EXECUTIVE OFFICER
NP KADIPUR SULTANPUR
NAGAR PANCHAYAT KADIPUR KE MOHALLA JAWAHAR NAGAR ME 05 DUKAN KA NIRMAN KARYA
2025_DOLBU_1089451_2
167/NPK/2025-26 DATE 07-11-2025
Open Tender
Civil Works
90 days
NP KADIPUR SULTANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,710
EXECUTIVE OFFICER
₹1.4 L
20 Jan 2026
10 Nov 2025
1 Dec 2025
10 Nov 2025
1 Dec 2025
10 Nov 2025
Excavation in foundation in ordinary soil…………etc complete
E/W Earthwork Filling in ordinary soil………..etc complete.
P&L in PCC 1:4:8 grade concrete excluding the cost of centering & shuttering etc complete.
P&L in foundation Raft RCC 1:1.5:3 grade concrete excluding the cost of centering & shuttering etc complete.
P&L in RCC column 1:1.5:3 grade concrete excluding the cost of centering & shuttering etc complete.
P/L in RCC Beam 1:1.5:3 grade concrete excluding the cost of centering & shuttering etc complete.
P&L in RCC slab 1:1.5:3 grade concrete excluding the cost of centering & shuttering etc complete.
Shuttering …......etc complete. Raft
UP to plinth level column ground floor column
G- Floor Slab beam
D-GROUND FLOOR SLAB MUMMTY
Mild Steel reinforcement for RCC work including cutting, bending, placing in position ….....etc complate.
Brick Work with common burnt clay brick of class-150 in foundation 1:4 Below Plinth
Brick Work with common burnt clay brick of class-150 in foundation 1:4 Below Plinth level
12mm thick plaster with cement mortor as item no 580 but with cement and fine sand of 1.25f.m. Mortor 1:4 add for extra labour to all items of plaster done celling Rooms
Putty 2mm thick
Finishing wall paint two coat
P/F Vetrified tile cushion 25mm thick 1:4 ratio cement & coarse sand ………etc complete.
12mm thick neat cement plaster
MS shutter 1mm thick
Rain water Pipe 100mm dia
MS Work in Truss 2coat paint
Electrical Work
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_2000014.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid