Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹2.0 L+₹69,325 (51.6%)Rejected-AOC | 2 | Rejected-AOC 2 | |
| 3 | Not Admitted-Fee 38 SHRI NIKUNJ COLONY MAUJA CHAMRAULII AGRA U P | AGRA | AGRA | UTTAR PRADESH | - | Not Admitted-Fee EMD/Instrument is not valid |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
25 Aug 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC-I, Kanpur
SE ETC-I, Kanpur
Work
2020_UPTCL_499720_1
ET-56/ETC-I(K)/2020-21
Open Tender
Electrical Works
Fixed-rate
90 days
Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
PNB Account No 0727002100004177
₹4,000
3 Mar 2021
7 Aug 2020
26 Aug 2020
7 Aug 2020
25 Aug 2020
7 Aug 2020
120 days
Amount
Tightening of 220 KV bus bar and jumper of various equipments connected to the main bus including replacement of eroded/damaged connector, P.G. Clamps & T.C. which will be provided by the department to the contractor, free of cost.
220 KV “A” Bus.
220 KV “B” Bus.
Checking, tightening of clamps of different equipments in 220 KV bay. Dismantling clamps, checking and tightening on the equipments including replacement clamp if found defective, clamp will be provided to the contractor by the department free of cost.
Replacement of ACSR Moose/tarantula conductor between bus bar to 220 KV equipments including straitening, cutting, bending, tightening at both end and carriage of conductor from store to site.
Note: 1. Contractor should have experience maintenance of 220 KV/400 KV S/S in UPPTCL. 2. Work is of emergency nature and hence contractor may be asked any time in day or night to attend the defect/fault. 3. Shutdown/work permit shall be provided at very short interval and contractor shall ensure to execue the above work within shut down/work permit period.
S. K. ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .