| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹53.0 LAdmitted-Finance | ₹53.0 L | H1 | Admitted-Finance |
| 2 | H2₹49.0 LAdmitted-Finance | ₹49.0 L | H2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Firm is one class below the eligible class stipulated in NIT. The value of residual work in hand is beyond 05 times of tendering limit of firm as per WLR QE Jun 2026 not admitted in terms of Note No 01 of Appx A to NIT to infuse better competition |
| Sl No | Description | Qty | Unit | M/S MATOO INFRASTRUCTURES PVT. LTD. H2 | M/S SA INFRATECH H1 |
|---|---|---|---|---|---|
| 1.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||
| 2.00 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule 'A' Section -I brought forward from serial page No. 25 | 1 | Lumpsum | 30,40,000 ₹30,40,000 Lowest | 36,50,500 ₹36,50,500 |
| 3.00 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule 'A'(Section-II Part-I) brought forward from serial page No. from 26 to 28 | 1 | Lumpsum | 1,18,000 ₹1,18,000 | 1,10,000 ₹1,10,000 Lowest |
| 4.00INTERNAL ELECTRIFICATION WORKS Schedule 'A' Section-II Part-II) | |||||
| 4.01 | S&F LED Lamp 15 W complete all as specified and directed. | 9 | Each | 372 ₹3,348 | 140 ₹1,260 Lowest |
| 5.00 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY as listed in Schedule 'A' (Section-III Part-I) brought forward from serial page No. 29 to 30 | 1 | Lumpsum | 20,000 ₹20,000 | 14,900 ₹14,900 Lowest |
| 6.00 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule 'A' (Section-IV Part-I) brought forward from serial page No. 31 to 32 | 1 | Lumpsum | 1,55,000 ₹1,55,000 | 1,42,500 ₹1,42,500 Lowest |
| 7.00 | Lump sum price worked out by the contractor for ROAD/PATH WORKS as listed in Schedule 'A' Section-V brought forward from serial page No.33 | 1 | Lumpsum | 55,000 ₹55,000 | 43,500 ₹43,500 Lowest |
| 8.00 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS listed in Schedule 'A' Section-VI brought forward from serial page No. 34 to 35 | 1 | Lumpsum | 2,30,000 ₹2,30,000 | 1,99,500 ₹1,99,500 Lowest |
| 9.00 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS listed in Schedule 'A' Section-VII brought forward from serial page No.36 | 1 | Lumpsum | 45,000 ₹45,000 | 32,500 ₹32,500 Lowest |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
1 Aug 2026, 6:00 pmClosed
CWE, HQ 133 WORKS ENGRS
HQ 133 WORKS ENGRS PIN-914133 C/O 56 APO
CWEK/TOKEN-74/969 EWS/2025-26 PROVN OF GUARD ROOM FOR STRENGTH (1 PLUS 3) ALONGWITH WASHROOM, PROVN OF 01X STORE FOR STORAGE OF RATION AND FRESH AND PROVN OF MAIN GATE NO ONE AND TWO AT GULMARG IN THE AOR OF AGE B/R-II AND AGE E/M UNDER GE 969 EWS
2026_MES_759211_2
CWEK/TOKEN-74/969 EWS/2025-26
Open Tender
Civil Works
Lump-sum
270 days
GE 969 EWS
Class D and above and category a (i)
7 documents required · 7 mandatory
₹500
GE 969 EWS
₹90,000
22 Aug 2026
26 Jun 2026
10 Aug 2026
26 Jun 2026
1 Aug 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||
| 2 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule 'A' Section -I brought forward from serial page No. 25 | 1 | Lumpsum | 24,69,818.74 | ₹24,69,818.74 |
| 3 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule 'A'(Section-II Part-I) brought forward from serial page No. from 26 to 28 | 1 | Lumpsum | 1,26,351.87 | ₹1,26,351.87 |
| 4INTERNAL ELECTRIFICATION WORKS Schedule 'A' Section-II Part-II) | |||||
| 4.01 | S&F LED Lamp 15 W complete all as specified and directed. | 9 | Each | - | - |
| 5 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY as listed in Schedule 'A' (Section-III Part-I) brought forward from serial page No. 29 to 30 | 1 | Lumpsum | 17,358.25 | ₹17,358.25 |
| 6 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule 'A' (Section-IV Part-I) brought forward from serial page No. 31 to 32 | 1 | Lumpsum | 1,72,561.4 | ₹1,72,561.4 |
| 7 | Lump sum price worked out by the contractor for ROAD/PATH WORKS as listed in Schedule 'A' Section-V brought forward from serial page No.33 | 1 | Lumpsum | 69,839.55 | ₹69,839.55 |
| 8 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS listed in Schedule 'A' Section-VI brought forward from serial page No. 34 to 35 | 1 | Lumpsum | 2,47,837.3 | ₹2,47,837.3 |
| 9 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS listed in Schedule 'A' Section-VII brought forward from serial page No.36 | 1 | Lumpsum | 43,353.74 | ₹43,353.74 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.48 MB
DRAWINGS74.pdf
Additional Documents • 4.12 MB
Tender74.pdf
Tender Documents • 1.98 MB
BOQ_867692.xls
BOQ • 0.32 MB
Amendment74.pdf
PDF • 0.71 MB
Postpond74.pdf
PDF • 0.35 MB
AMENDMENT74.pdf
PDF • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].