Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC VILLAGE SAMAYPUR ROAD ROAD KARNERA 42 FARIDABAD HARYANA FARIDABAD FARIDABAD HARYANA 121004 | FARIDABAD | FARIDABAD | HARYANA | 121004 | ₹1.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 L+₹4,862.87 (2.99%)Rejected-AOC VILLAGE CHANDAWALI SECTOR 69 FARIDABAD 121004 | FARIDABAD | FARIDABAD | HARYANA | 121004 | ₹1.7 L+₹4,862.87 (2.99%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 L+₹8,384.25 (5.15%)Rejected-AOC PLOT NO 73 HOUSE NO 73 SECTOR 18 FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | ₹1.7 L+₹8,384.25 (5.15%) | L3 | Rejected-AOC L3 |
Tender Value
₹1.7 L
EMD Value
₹3,360
Closing Date
31 Mar 2026, 6:00 pmClosed
Sandeep Dahiya
Horticulture Faridabad
HEW 175 Transplanting of big size and small trees form in Sector-16 Faridabad all other works contingent thereto.
2026_HBC_510661_1
2026141B14A5 C379 4B37 973A 6E978020DFFF264HSV
Open Tender
Civil Works
Works
15 days
Faridabad (MC)
as per dnit
2 documents required · 2 mandatory
₹250
₹3,360
Yes
8 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
24 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.LB067] LB067. Mazdoor (unskilled) | - | Per day | 325 | - |
| 2 | [1.PM004] PM004. Hire charges of Diesel Truck - 9 tonne | - | Per day | 1,786 | - |
| 3 | [1.PM073] PM073. Cranes b) 35 tonnes | - | Hours | 2,036 | - |
| 4 | [14.51.3]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 3. Hire Charges for excavator with over 0.75 cum bucket capacity | - | Per day | 9,276 | - |
| 5 | [26.15.2]Maintenance of tree including fertilization, application of insecticide, watering, weeding, training, pruning, 2. Maintenance of tree for one year for the age of tree of 4th, 5th and next years including weeding, hoeing, plant protection, the watering from Deptt. source, application of 10 ml chlorpyriphos four times, 0.0289 cum FYM each, 50 gm urea and 50 g DAP twice, replacement of casualty etc. | - | Each | 241 | - |
| 6 | analysis rate for transplanting of big size and small trees from one site to another site complete in all respect to the full satisfaction to the engineer-in-charge. | - | Each | 234 | - |
| 7 | CHAINSHAW MACHINE FOR CUTTING and REMOVAL OF FALLING TREES WITH OPERATOR | - | Per day | 9,808 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_589459.xls
BOQ • 0.36 MB
EMF366Z155367.pdf
Additional Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .