Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -41.26% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹34,584.49 (0.26%)Admitted-Finance | -41.11% | ₹1.4 Cr+₹34,584.49 (0.26%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹5.7 L (4.21%)Admitted-Finance | -38.79% | ₹1.4 Cr+₹5.7 L (4.21%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹8.2 L (6.06%)Admitted-Finance | -37.70% | ₹1.4 Cr+₹8.2 L (6.06%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 Cr+₹12.5 L (9.19%)Admitted-Finance | -35.86% | ₹1.5 Cr+₹12.5 L (9.19%) | L5 | Admitted-Finance |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
27 Apr 2026, 4:00 pmClosed
Executive Engineer
RnB Division Qazigund
Up-gradation of Link road from National Highway to Ziyarat Hazrat Amir Kabir Village Malpora Qazigund Anantnag (Agg. length 3.0 KMS)
2026_PWDJK_307164_1
NIT69//RnB/QZD/25-26/6279-93 Dtd 31-03-2026
Open Tender
Civil Works - Roads
Percentage
730 days
Qazigund
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,500
Executive Engineer RnB Div. Qazigund
₹5.4 L
Office of the S.E RnB Circle Kulgam
15 May 2026
3 Apr 2026
28 Apr 2026
3 Apr 2026
27 Apr 2026
6 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | CONSTRUCTION OF DRAIN | - | - | - | - |
| - | Engagement of JCB for dismantalling of existing damaged culvert, removal of pipes and removal of humps ,side berms etc incl. all carriages complete job | - | Hours | - | - |
| - | Earth work in excv. By Mechnicall means over areas excd. 30 cms & upto 5 m in depth 1.5m in width as well as 10 sqm. On plan, disposal of excvtd. Earth upto 1 m, disposed earth to be levelled & neatly dressed( all kinds of soils) | - | CUM | - | - |
| - | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | - | CUM | - | - |
| - | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | - | CUM | - | - |
| - | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:2:4 coarse sand 20mm nominal size crushed stone agg.) | - | CUM | - | - |
| - | Cement Concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone agg) finished with a floating coat of neat cement incld. cement slurry but excld the cost of nosing of steps etc complete 50mm thick with 20mm n/s stone agg crushed | - | SQM | - | - |
| - | Centring and shuttering incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete | - | SQM | - | - |
| - | CONSTRUCTION R/WALLS AT DIFFERENT LOCATIONS | - | - | - | - |
| - | Earth work in excv.by mechanical means not excd. 30 cms & upto 5 m in depth 1.5m in width as well as 10 sqm. On plan, disposal of excvtd. Earth upto 1 m, disposed earth to be levelled & neatly dressed( all kinds of soils) | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.58 MB
BOQ_996682.xls
BOQ • 0.33 MB
Adent69.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .