| 1 | 1₹1.1 LAccepted-AOC 2 176 MASILAPALAYAM METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.4 L+₹10,070 (4.33%)Rejected-AOC 150 1ST STREET THOTTILPATHY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
19 Apr 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit III Fabrication of various length of 40 dia NB cooling water pipe line with flanges and assembling in the cooler cover of mill 3A to 3F and Dismantling of seal air fan motor and overhauling reassembling
2024_EB_428520_1
CE / MTPS-I / SE / M-I / MP/OT. 427/ 2023-24
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,000
Yes
24 Jan 2025
21 Feb 2024
20 Apr 2024
21 Feb 2024
19 Apr 2024
21 Feb 2024
Amount
Charges for cutting, grinding, threading of various length of cooling water pipe line and thread cleaning of cooler cover inlet/ out let with existing suitable flanges welding and assembling in the mill cooler cover 3A to 3F.
Charges for dismantling the motor from seal airline and disposal of accumulated ash & dust and cleaning the bed frames, checking the condition of frames
Charges for dismantling and assembling the existing impeller from seal airline 3A & 3B in mill plant cleaning and inspection of impeller If necessary to replace the damaged parts and after completion of work the same will be assembled in the seal air motor and providing the gland rope with aligning the fan with motor including trial operation
Charges for complete overhauling of motor including dismantling, cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling .
Charges for dismantling the existing filter assembly and after completion of work the same will be assembled in an appropriate manner etc.
Charges for cleaning and inspection of filter assembly and replace the wire mesh and providing the additional support for strengthening the frame and welding properly and changing & fixing the damaged bolts with new one
Cutting gas
Cost of bearings 6313 ( Make: SKF)
Cost of MS Welding electrodes
Charges for consumables and T & Ps
SATHISH ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .