Loading…
Loading…
Tender Value
₹80.3 L
EMD Value
₹6.0 L
Closing Date
29 Sept 2026, 12:00 pm2d left
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
Construction of RCC box culvert, approach road, and additional approach road on the drain near Shiv Temple beside the house of Birju Nishad at Pilikicha, in District Jaunpur.
2026_CEUVZ_1189404_1
4579/SETender/jnp-gzp circle/26 Date-07-09-2026
Open Tender
Civil Works
Percentage
180 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.0 L
Yes
24 Sept 2026
24 Sept 2026
29 Sept 2026
24 Sept 2026
29 Sept 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (including all taxes, labour cess etc but excluding GST.) | 428 | Cum | 61 | ₹26,108 |
| 2 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (including all taxes, labour cess etc but excluding GST.) | 123 | Cum | 3,260 | ₹4,00,980 |
| 3 | Plain Cement Concrete 1:3:6 nominal mix in Foundation with crust in stone aggregate 40mm nominal size mechnicaly mix, placed in foundation and compacted by vibration including curing for 14 days (including all taxes, labour cess etc but excluding GST.) | 19.5 | Cum | 6,100 | ₹1,18,950 |
| 4 | RCC Grade M25 using batching plant transit mixer & manual placing as per MORTH SI. No. 12.9 Case-II and specification No.1500, 1700, 2100 (including all taxes, labour cess etc but excluding GST.) | 255 | Cum | 8,750 | ₹22,31,250 |
| 5 | Mild steel or iron in plain work such as in R.C.C. work including bending for proper completion of work & including supply of steel. (including all taxes, labour cess etc but excluding GST.) | 195 | Qtl | 7,150 | ₹13,94,250 |
| 6 | Providing weep holes in Brick work /plain /reinforced concrete abutment, wing wall/ return wall with 100mm dia PVC pipe extended through the full width of structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specifications. (including all taxes, labour cess etc but excluding GST.) | 26.5 | Rm. | 210 | ₹5,565 |
| 7 | Providing and laying Pitching on slopes laid including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (including all taxes, labour cess etc but excluding GST.) | 81 | Cum | 2,710 | ₹2,19,510 |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (including all taxes, labour cess etc but excluding GST.) | 4,700 | Cum | 69 | ₹3,24,300 |
| 9 | Providing laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base. (including all taxes, labour cess etc but excluding GST.) | 332.25 | Cum | 3,050 | ₹10,13,362.5 |
| 10 | Providing laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base/base (including all taxes, labour cess etc but excluding GST.) | 316.25 | Cum | 3,350 | ₹10,59,437.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.03 MB
Tendernotice_2.pdf
PDF • 14.77 MB
BOQ_2240942.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .