| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹6.9 L (2.26%)Admitted-Finance | ₹3.1 Cr+₹6.9 L (2.26%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹7.9 L (2.62%)Admitted-Finance 806 8TH FLOOR MULUND WEST NEPTUNE UPTOWN N S ROAD VILLAGE TOWN MULUND CITY MUMBAI MUMBAI MAHARASHTRA 400080 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | ₹3.1 Cr+₹7.9 L (2.62%) | L3 | Admitted-Finance |
| 4 | L3₹3.1 Cr+₹7.9 L (2.62%)Admitted-Finance | ₹3.1 Cr+₹7.9 L (2.62%) | L3 | Admitted-Finance |
| 5 | L4₹3.1 Cr+₹9.3 L (3.05%)Admitted-Finance | ₹3.1 Cr+₹9.3 L (3.05%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Encee Rail Engineers and Fabricators Pvt Ltd L3 | SUSANTA KUMAR SWAIN L5 | Ms Gangadhar Jena L2 | JISHU KRISHNA NAYAK L4 | SANJAY KUMAR UPADHYAY L7 | SUBRAT KUMAR BEHURA L6 | M/S BHAIRAB CHARAN SWAIN L1 | Aakar Engineers and Contractors L10 | M/S TRIBHUBAN DAS L8 | M.K.Groups L9 | LAXMIDHAR ROUT L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing R.C.C. drain / walls / raft, beams, slab, including stacking the useful materials for reuse and removing the debris with initaial lead and lift of supply of all labour, T&P, staging, port entry fees, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place but excluding cost of GST as per direction of Engineer-in-charge. | 48 | Each Cum | 1,200 ₹57,600 | 578 ₹27,744 | 800 ₹38,400 | 850 ₹40,800 | 1,254 ₹60,192 | 1,000 ₹48,000 | 1,080 ₹51,840 | 1,100 ₹52,800 | 470 ₹22,560 Lowest | 1,177.25 ₹56,508 | 1,200 ₹57,600 |
| 2.00 | Engagement of Tractor at required locations inside prohibited area for shifting of excavated/dismantled material and debrises, shifting to the designated debrish yard with supply of all labour, T&P, engagment, hire & running charges, transportation charges, Operator cost, Port entry fee etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge.
(No idle charges will be paid). | 120 | Each Hour | 50 ₹6,000 Lowest | 480 ₹57,600 | 100 ₹12,000 | 250 ₹30,000 | 208.81 ₹25,057.2 | 100 ₹12,000 | 140 ₹16,800 | 400 ₹48,000 | 400 ₹48,000 | 203.55 ₹24,426.36 | 50 ₹6,000 Lowest |
| 3.00 | Earthwork in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P,port entry fees, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge. | 4,661 | Each Cum | 100 ₹4,66,100 | 138 ₹6,43,218 | 160 ₹7,45,760 | 120 ₹5,59,320 | 215.44 ₹10,04,165.84 | 110 ₹5,12,710 | 90 ₹4,19,490 | 110 ₹5,12,710 | 85 ₹3,96,185 Lowest | 208.33 ₹9,71,026.13 | 100 ₹4,66,100 |
| 4.00 | Filling in foundation and plinth with excavated materials including watering and ramming etc all complete including Supply of all material , labour , T&P, hire and running charge of equipment , taxes ,tollage etc all complete but excluding GST. as directed by EIC. | 3,108 | Each Cum | 50 ₹1,55,400 | 98 ₹3,04,584 | 70 ₹2,17,560 | 100 ₹3,10,800 | 119.78 ₹3,72,276.24 | 60 ₹1,86,480 | 30 ₹93,240 Lowest | 90 ₹2,79,720 | 220 ₹6,83,760 | 114.94 ₹3,57,245.95 | 50 ₹1,55,400 |
| 5.00 | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes,Port entry fee, etc. complete but excluding cost of GST as directed by Engineer-in-charge. | 211 | Each Cum | 3,800 ₹8,01,800 | 4,888 ₹10,31,368 | 2,900 ₹6,11,900 Lowest | 4,000 ₹8,44,000 | 4,205.58 ₹8,87,377.38 | 4,700 ₹9,91,700 | 4,800 ₹10,12,800 | 5,700 ₹12,02,700 | 4,370 ₹9,22,070 | 4,247.25 ₹8,96,169.75 | 3,800 ₹8,01,800 |
| 6.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties,Port entry fee, etc. all complete but excluding GST as directed by Engineer-in-charge. | 1,841 | Each Cum | 5,000 ₹92,05,000 Lowest | 5,698 ₹1,04,90,018 | 5,600 ₹1,03,09,600 | 5,500 ₹1,01,25,500 | 5,777.68 ₹1,06,36,708.88 | 5,550 ₹1,02,17,550 | 6,103 ₹1,12,35,623 | 7,100 ₹1,30,71,100 | 6,435 ₹1,18,46,835 | 6,043.39 ₹1,11,25,888.35 | 5,000 ₹92,05,000 Lowest |
| 7.00 | Supplying TOR/TMT steel manufactured by SAIL/TISCON/VIZAG Steel of Fe500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes,Port entry fee, etc. all completebut excluding GST as per the direction of Engineer-in-charge.
NB: No payment shall be made for extra weight than theoretical co-efficient. | 2,210 | Each Quintal | 8,000 ₹1,76,80,000 | 7,278 ₹1,60,84,380 | 7,200 ₹1,59,12,000 | 7,000 ₹1,54,70,000 | 6,291.74 ₹1,39,04,745.4 Lowest | 7,900 ₹1,74,59,000 | 6,900 ₹1,52,49,000 | 8,500 ₹1,87,85,000 | 7,500 ₹1,65,75,000 | 7,186.35 ₹1,58,81,835.71 | 8,000 ₹1,76,80,000 |
| 8.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties,port entry fees, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge | ||||||||||||||
| 8.01 | F & P | 783 | Each Sqm | 100 ₹78,300 | 198 ₹1,55,034 | 120 ₹93,960 | 110 ₹86,130 | 95.66 ₹74,901.78 | 120 ₹93,960 | 230 ₹1,80,090 | 350 ₹2,74,050 | 200 ₹1,56,600 | 88.47 ₹69,274.36 Lowest | 100 ₹78,300 |
| 8.02 | RCC Wall | 8,559 | Each Sqm | 300 ₹25,67,700 | 278 ₹23,79,402 | 350 ₹29,95,650 | 430 ₹36,80,370 | 667.1 ₹57,09,708.9 | 260 ₹22,25,340 | 230 ₹19,68,570 Lowest | 280 ₹23,96,520 | 250 ₹21,39,750 | 713.83 ₹61,09,628.18 | 300 ₹25,67,700 |
Tender Value
₹3.9 Cr
EMD Value
₹7.9 L
Closing Date
12 Jun 2023, 5:15 pmClosed
Binayak Pradhan,EE,HWDII,PPA
Binayak Pradhan,EE,HWDII,PPA
Providing peripheral drain cum retaining wall alongside of Net Barrier and P.Way track near Gate No.2 inside prohibited area
2023_MoS_754363_1
CE/ HW-II-W-07/23/116
Open Tender
Civil Works
Works
240 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹7.9 L
Yes
21 Aug 2023
22 May 2023
14 Jun 2023
22 May 2023
12 Jun 2023
22 May 2023
Amount
Dismantling and removing R.C.C. drain / walls / raft, beams, slab, including stacking the useful materials for reuse and removing the debris with initaial lead and lift of supply of all labour, T&P, staging, port entry fees, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place but excluding cost of GST as per direction of Engineer-in-charge.
Engagement of Tractor at required locations inside prohibited area for shifting of excavated/dismantled material and debrises, shifting to the designated debrish yard with supply of all labour, T&P, engagment, hire & running charges, transportation charges, Operator cost, Port entry fee etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid).
Earthwork in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P,port entry fees, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge.
Filling in foundation and plinth with excavated materials including watering and ramming etc all complete including Supply of all material , labour , T&P, hire and running charge of equipment , taxes ,tollage etc all complete but excluding GST. as directed by EIC.
P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes,Port entry fee, etc. complete but excluding cost of GST as directed by Engineer-in-charge.
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties,Port entry fee, etc. all complete but excluding GST as directed by Engineer-in-charge.
Supplying TOR/TMT steel manufactured by SAIL/TISCON/VIZAG Steel of Fe500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes,Port entry fee, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties,port entry fees, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge
RCC Wall
RCC Roof
Drilling of 200 mm deep holes on concrete surface in horizontal plane for fixing 12mm or more dia reinforcement bars by any approved method, cleaning the hole by blow out pump, grouting the reinforcement bars with approved anchoring adhesive resins of HILTIMAKE HIT- HY 150/ BOSCH or equivalent make, transporting, cutting, placing, proper fixing of reinforcement bars with cost & expenses of all materials, tools and plants, machineries, taxes, Port entry fees including providing barricades to the working area etc all complete excluding cost of GST as per direction of Engineer in charge. NB: Excluding cost of steel reinforcement and bending,binding charges.
Supplying of 75mm dia PVC pipe transporting , cutting,placing,proper fixing of PVC pipe with cost & expenses of all materials, T&P,machineries,Port entry fees. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge.
Engagement of 5HP Diesel Pump sets and placing those pumps at required locations inside prohibited area for dewatering of stagnated water by pumping including fuel and consumable, providing required length of suction and delivery pipes with supply of all labour, T&P, engagment, hire & running charges of Pump, transportation charges, Operator cost, Port entry fee with barricading the same area if required etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid. Pumps will be engaged as and when required).
Ms Gangadhar Jena
LAXMIDHAR ROUT
Encee Rail Engineers and Fabricators Pvt Ltd
JISHU KRISHNA NAYAK
SUSANTA KUMAR SWAIN
SUBRAT KUMAR BEHURA
SANJAY KUMAR UPADHYAY
M/S TRIBHUBAN DAS
M.K.Groups
Aakar Engineers and Contractors
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_793044.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .