| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC VILLAGE KHANOARA POST OFFICE TUNDI DISTT CHAMBA H P 176307 | TUNDI | CHAMBA | HIMACHAL PRADESH | 176307 | ₹12.0 L | L1 | Accepted-AOC work awarded to L contractor vide this office letter No. 19648-19654 dated 12-03-20265 |
| 2 | L2₹16.6 L+₹4.6 L (38.1%)Rejected-Finance VILL CHABA TEHSIL SUNNI DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | ₹16.6 L+₹4.6 L (38.1%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Vipin Sharma L2 | Satih Thakur L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in drains and channels etc. in earth work including dressing of side and bed and disposing of excavated earth all leads and lifts disposed earth to be levelled and neatly dressed such as pick work, jumper work, within all leads and lifts as per the direction of Engineer-in -Charge. | 92.4 | Cum. | 570 ₹52,668 | 520 ₹48,048 Lowest |
| 2.00 | Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | 23.1 | Cum. | 17,000 ₹3,92,700 | 6,300 ₹1,45,530 Lowest |
| 3.00Providing form work with steel plates 3.15 millimeter thick welding with angle iron in frame 30x30x5 millimeter, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and bellies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||
| 3.10 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge. | 440 | Sqm. | 750 ₹3,30,000 | 370 ₹1,62,800 Lowest |
| 4.00Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in columans pillar posts and struts upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge. | |||||
| 4.10 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge. | 23.1 | Cum. | 570 ₹13,167 Lowest | 9,250 ₹2,13,675 |
| 4.20 | In Walls (any thickness but not exceeding 0.10 meter thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level within all leads and lifts as per the direction of Engineer-in-Charge. | 33 | Cum | 15,000 ₹4,95,000 | 9,250 ₹3,05,250 Lowest |
| 5.00 | Providing Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in- Charge. | 3,825 | Kg. | 98 ₹3,74,850 | 85 ₹3,25,125 Lowest |
Tender Value
Refer Docs
EMD Value
₹31,887
Closing Date
16 Feb 2026, 11:00 amClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION CHOWARI
Remodelling work of remaining length of FIS upper Samote in tehsil Sihunta Distt Chamba HP SH Co RCC pucca main channel at RD 3210 3430 220 rmt near Maled nallah
2026_HPIPH_127622_1
NIT NO 17162-17172 DATED 02-02-2026
Open Tender
Civil Works - Water Works
Item Rate
60 days
SIHUNTA CHAMBA HP
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹31,887
12 May 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
6 Feb 2026 - 16 Feb 2026
Excavation in drains and channels etc. in earth work including dressing of side and bed and disposing of excavated earth all leads and lifts disposed earth to be levelled and neatly dressed such as pick work, jumper work, within all leads and lifts as per the direction of Engineer-in -Charge.
Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge.
Providing form work with steel plates 3.15 millimeter thick welding with angle iron in frame 30x30x5 millimeter, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and bellies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge.
Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in columans pillar posts and struts upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge.
Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge.
In Walls (any thickness but not exceeding 0.10 meter thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level within all leads and lifts as per the direction of Engineer-in-Charge.
Providing Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in- Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_188480.xls
BOQ • 0.28 MB
F68.pdf
Tender Documents • 2.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .