Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical (SI.NO.1 to 3 Accepted ) (SI.NO.4 Rejected ) Not Submitted the Technical Specification for Si.No 4 (ON-OFF Control of temperature Process) |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical (SI.NO.1 and 4 Accepted ) (SI.NO.2 and 3 Rejected ) Not Submitted the Technical Specification for Si.No 2 and 3 |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
| 5 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
Refer Docs
Closing Date
9 Jun 2026, 9:00 amClosed
The Principal
Government Polytechnic College Udhagamandalam
lab Equipments
2026_DoTE_678620_2
1746/D/2026
Limited
Electronics Equipment
Supply
Government Polytechnic College Udhagamandalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
23 Jun 2026
30 May 2026
10 Jun 2026
30 May 2026
9 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Temperature Transmitter Trainer kit | 1 | Nos | - | - |
| 1.02 | Closed Loop Control of Temperature
Process Using Thermistor | 1 | Nos | - | - |
| 1.03 | Proportional Control of
Temperature Process | 1 | Nos | - | - |
| 1.04 | on off Control of Temperature Process | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.14 MB
BOQ_815627.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .