Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | G.Subramaniyan L2 | S GIRIJA L1 |
|---|---|---|---|---|---|
| 1.00 | Avenue plants- Light Jungle Clearance including removal of grass, shurbs, bushes, Digging of 60 cm3 pit in all types of soils for avenue plantation, Planting /Seeding of plant Watering for Plantation - Tree from the nearby sourse open well-Borewell - Open source | 2,350 | M3 | 205 ₹4,81,750 | 203 ₹4,77,050 Lowest |
| 2.00 | Miyavaki planting- Light Juble Clearance including removal of grass, shurbs, bushes, Digging of 60 cm3 pit in all types of soils for avanue piantation, Planting Herb, shurb, sub tree and tree of plant Watering for Plantation - Tree from the nearby sourse opean well-Borewell - Open source | 150 | M2 | 108 ₹16,200 | 106 ₹15,900 Lowest |
| 3.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification. | 7 | M2 | 112 ₹784 | 110 ₹770 Lowest |
| 4.00 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2 | M3 | 5,695 ₹11,390 | 5,690 ₹11,380 Lowest |
| 5.00 | Supplying and fixing of Cut Stone Pillar of size 0.10 x 0.10 x 2.10m. Including cost loading & unloading, etec completed. | 288 | M3 | 156 ₹44,928 | 154 ₹44,352 Lowest |
| 6.00 | Plain Cement concrete of mix 1:2:4 (One cement two sand and four aggregates) using 20mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25 | 5 | M2 | 7,148 ₹35,740 | 7,143 ₹35,715 Lowest |
| 7.00 | Supplying and Fixing of Chain link-2"x2" using 10 Gauge Galvanised Iron wires (Of all sizes) for fencing cost including all material, binding wire and labour charges etc. complete as per Standard specification and as directed by the departmental officers. | 273 | M3 | 163 ₹44,499 | 160 ₹43,680 Lowest |
| 8.00 | Supplying and Fixing of MS Gate Arrenements cost including all material, labour charges etc. complete as per Standard specification and as directed by the departmental officers. | 930 | M3 | 110 ₹1,02,300 | 107 ₹99,510 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
6 Jul 2026, 3:00 pmClosed
COMMISSIONER VADALUR MUNICIPALITY
MUNICIPALITY OFFICE VADALUR
PROVIDING FENCING ARRANGMENTS AT PARK SITES AND, JUNGLE CLEARANCE FOR SEEDING OF SAPLINGS VADALUR MUNICIPALITY.
2026_MAWS_683945_1
720/2026/E1
Open Tender
Civil Works - Others
Works
90 days
VADALUR MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,000
6 Jul 2026
4 Jul 2026
6 Jul 2026
4 Jul 2026
6 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Avenue plants- Light Jungle Clearance including removal of grass, shurbs, bushes, Digging of 60 cm3 pit in all types of soils for avenue plantation, Planting /Seeding of plant Watering for Plantation - Tree from the nearby sourse open well-Borewell - Open source | 2,350 | M3 | - | - |
| 2 | Miyavaki planting- Light Juble Clearance including removal of grass, shurbs, bushes, Digging of 60 cm3 pit in all types of soils for avanue piantation, Planting Herb, shurb, sub tree and tree of plant Watering for Plantation - Tree from the nearby sourse opean well-Borewell - Open source | 150 | M2 | - | - |
| 3 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification. | 7 | M2 | - | - |
| 4 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2 | M3 | - | - |
| 5 | Supplying and fixing of Cut Stone Pillar of size 0.10 x 0.10 x 2.10m. Including cost loading & unloading, etec completed. | 288 | M3 | - | - |
| 6 | Plain Cement concrete of mix 1:2:4 (One cement two sand and four aggregates) using 20mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25 | 5 | M2 | - | - |
| 7 | Supplying and Fixing of Chain link-2"x2" using 10 Gauge Galvanised Iron wires (Of all sizes) for fencing cost including all material, binding wire and labour charges etc. complete as per Standard specification and as directed by the departmental officers. | 273 | M3 | - | - |
| 8 | Supplying and Fixing of MS Gate Arrenements cost including all material, labour charges etc. complete as per Standard specification and as directed by the departmental officers. | 930 | M3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_822162.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].