| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.0 LAdmitted-Finance | +0.00% | ₹15.0 L | L1 | Admitted-Finance |
| 2 | L2₹15.3 L+₹33,750.01 (2.25%)Admitted-Finance SHRI BHAGWAN RAMCHANDRA PATIL R A PACHERDE TA BHUDARGAD | SATARA | MAHARASHTRA | 412206 | +2.25% | ₹15.3 L+₹33,750.01 (2.25%) | L2 | Admitted-Finance |
| 3 | L3₹15.7 L+₹67,500.02 (4.50%)Admitted-Finance NOT AVAILABLE | +4.50% | ₹15.7 L+₹67,500.02 (4.50%) | L3 | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
1 Jun 2026, 11:00 amClosed
Executive Engineer (Works) Z P Kolhapur
Executive Engineer (Works) Z P Kolhapur
S.T.B.T. TO INTERNAL BEDIV PAIKI DHANGARVADA (GRAMPANCHYAT KARYLAY TO GAYRAN DHANGARVADA LATITUDE-16.2112 LONGITUDE-74.1667) TAL- BHUDARGAD DIST-KOLHAPUR
2026_KOLHA_1303682_9
E TENDER NOTICE NO 09/2026-27
Open Tender
Civil Works
Percentage
180 days
KOLHAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹15,000
12 Jun 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. By Mechanical Means.
Item / Page No : 11 / 23
Specification No : MORTH-301
Spec. Page No : 45-53 | - | Cubic Metre | - | - |
| 2 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 60 milimetre metal, by breaking rubble obtained by blasting. (Hand broken).
Item / Page No : 54A / 250
Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | - | Cubic Metre | - | - |
| 3 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete.
Item / Page No : 29a / 24
Specification No : MORTH-408
Spec. Page No : 139-142 | - | Cubic Metre | - | - |
| 4 | Spreading 60 mm metal for road work including sectionong, excetra complete as directed by Engineer in charge.
Item / Page No : 58A / 250
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Cubic Metre | 1 | - |
| 5 | Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete.
Item / Page No : 30 / 24
Specification No : MORTH-408
Spec. Page No : 139-142 | - | Cubic Metre | - | - |
| 6 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 40 milimetre metal, by breaking rubble obtained by blasting. (Hand broken).
Item / Page No : 55 / 250
Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | - | Cubic Metre | - | - |
| 7 | Supplying soft murum at the road site, including conveying and stacking, excetra complete.
Item / Page No : 29b / 24
Specification No : MORTH-408
Spec. Page No : 139-142 | - | Cubic Metre | 1 | - |
| 8 | Spreading 80 milimetre / 40 milimetre metal for road work including sectionong, excetra complete as directed by Engineer in charge.
Item / Page No : 58 / 250
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Cubic Metre | 1 | - |
| 9 | Compacting the sub grade/gravel/oversize metal (200 milimetre loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.
Item / Page No : 59 / 250
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Square Metre | 1 | - |
| 10 | Compacting the sub grade / gravel / size metal (100 milimetre loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.
Item / Page No : 61 / 250
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Square Metre | 1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_2238386.xls
BOQ • 0.26 MB
SBD_2026_27.pdf
Tender Documents • 2.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .