Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 LRejected-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹4.2 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M RAMARAJ L1 | C BALASUBRAMANIAN L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 2 | m3 | 4,308 ₹8,598.77 | 4,310 ₹8,602.76 |
| 2.00 | Desilting the existing ugd chambers as per Instruction of departmental officers..including all initial lead and lift etc complete. | 1 | m3 | 97 ₹96.9 | 100 ₹99.9 |
| 3.00 | Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete. | 5 | m3 | 486 ₹2,430.97 | 500 ₹2,501 |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all
materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | m3 | 5,338 ₹5,327.32 | 5,339 ₹5,328.32 |
| 5.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 29 | m2 | 337 ₹9,773 | 350 ₹10,150 |
| 6.00 | Cement concrete 1:3:6 mix (one cement Three sand and Six aggregates) using 20 mm size hard broken stones from approved quarry complying with standard specification | 5 | m3 | 6,037 ₹30,197.07 | 6,050 ₹30,262.1 |
| 7.00 | Plastering in Cement Morter 1: 5 Mix using 20 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 14 | M2 | 586 ₹8,204 | 600 ₹8,400 |
| 8.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 8 | m2 | 1,154 ₹9,227.38 | 1,160 ₹9,275.36 |
| 9.00 | Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete. | 2.5 | qtl | 9,152 ₹22,880 | 9,152 ₹22,880 |
| 10.00 | Supply and fixing of 900x900mm dia SFRC MANHOLE COVER (Heavy Duty) with Frame including loading and unloading charges etc., completed. | 3 | Nos | 3,244 ₹9,732 | 3,244 ₹9,732 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
20 Mar 2025, 3:00 pmClosed
Assistant commissioner, westzone
westzone, coimbatore corporation
Providing Under Ground Drainage Main line at Periyakannikonar streeet in in Ward No 42 of West Zone.
2025_MAWS_531810_28
E7/WESTZONE/2025
Open Tender
Civil Works
90 days
westzone, coimbatore corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹5,000
11 May 2026
12 Mar 2025
20 Mar 2025
12 Mar 2025
20 Mar 2025
12 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
WaterSupply.pdf
Tender Documents • 0.79 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_633227.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid