| 1 | L1₹18.5 CrAdmitted-Finance | ₹18.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹19.5 Cr+₹96.2 L (5.20%)Admitted-Finance 1003 1004 LODHA SUPREMUS III I THINK CAMPUS OFF JVLR KANJURMARG EAST MUMBAI MAHARASHTRA 400042 | MUMBAI SUBURBAN | MAHARASHTRA | 400042 | ₹19.5 Cr+₹96.2 L (5.20%) | L2 | Admitted-Finance |
| 3 | L3₹19.5 Cr+₹1.0 Cr (5.44%)Admitted-Finance NEW NO 26 1 FIVE FURLONG ROAD GUINDY CHENNAI TAMIL NADU 600032 | CHENNAI | TAMIL NADU | 600032 | ₹19.5 Cr+₹1.0 Cr (5.44%) | L3 | Admitted-Finance |
| 4 | L4₹20.5 Cr+₹2.0 Cr (10.7%)Admitted-Finance A 36 GHANSHYAM NAGAR SOCIETY NO 2 GIDC ROAD MANJALPUR VADODARA GUJARAT 390011 UDYAM GJ 24 0004224 24AADCC6489M1Z5 R M MII STATUS AS VERIFIED | VADODARA | GUJARAT | 390011 | ₹20.5 Cr+₹2.0 Cr (10.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CRYOGAS EQUIPMENT PRIVATE LIMITED L4 | M. P. Engineering Constructions (India) Pvt. Ltd. L2 | Inox India Pvt Ltd L1 | V.S.PRESSURE VESSELS & GAS PROJECTS PVT LTD L3 |
|---|---|---|---|---|---|---|---|
| 1.00DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LNG STORAGE FACILITY ALONG WITH LNG & LCNG DISPENSING FACILITY AT MIRJAPUR GA | |||||||
| 2.00 | GROUP-A
SUPPLY OF LNG STORAGE FACILITY ALONG WITH LNG & LCNG DISPENSING FACILITY AT MIRJAPUR GA
Scope includes system design, development of P&ID, piping layout, GAD, in line with PESO rules/ design basis/other applicable guidelines. Scope also includes but is not limited to design, engineering, procurement of materials, inspection, Testing, fabrication, installation, painting and supply of LNG equipments as mentioned below:- | 1 | Lumpsum | 12,91,78,207.07 ₹15,24,30,284.34 | 11,72,24,565 ₹13,83,24,986.7 | 11,03,89,490 ₹13,02,59,598.2 | 9,78,50,000 ₹11,54,63,000 Lowest |
| 3.001) 2 No. 56 KL capacity double-walled vacuum insulated / multi layer super insulated cryogenic LNG storage tank along with all associated equipment piping, instruments and control system & valves. NOTE:- Design, Detail Engineering, Fabrication, Assembly, Painting, Inspection, Hydro Testing at works and Leak testing, Packaging, Transportation and unloading at site along with foundation bolts and all required comissioing spares, Installation as per tank spacing requirements and commissioning of Double-walled pearlite in vacuum insulated/multi layer super insulated cryogenic LNG STORAGE TANK of capacity of 56 KL along with all necessary PRV/SSV controls, instruments and other accessories as specified in attached data sheet, system design basis and process flow diagram. GAIL Logo, Heading on Tanks {GAIL GAS LIMITED} and capacity description. NOTE:- 1) Tank shall be std. features with top/bottom fill lines. 2) Tank should be dual saftey relief system. 3) Stainless steel primary valves along SS piping. 4) Stainless steel vent stack to suitable height with flame arrester requirements as per OISD/PNGRB/PESO norms. 5) Tank MAWP should be 12 kg/cm2-g & design pressure at 18 kg/cm2-g. 6) Durable, Epoxy Based, Polyurethane Finish painting as per standrads suitable for cryogenic applications. 7) vaccume jacketed piping system 8) Pneumatic emergency shut off valves. 9) Tank size should be approx. (H-11.5mtr.* D-3.2 Mtr approx.), however vendor shall suitably size the tank capacity based considering with vapor volume fractions accordingly. 10) LNG filling line, Vapor return line & a recirculation line with adequate instrumentation should be consider. 11) In case of non-availability of flare system, the discharge from safety valve shall be vented to atmosphere at a safe location minimum at an elevation of 3 meter above the nearest working platform for effective dispersion of hydrocarbons as per PNGRB/PESO guidelines. 12) Tank should be designed as per ASME SEC-VIII Div. I/ EN13458-2/ PED/NFPA-59A/NFPA-11 & other inetrnational code & certified by CCOE 13) Epoxy Based, Polyurethane Paint Finish as per paint specification suitable for cryogenic vessel application. 14) The Liquefied Natural gas is stored at about –159°C to –168 °C. LNG tanks are required to be designed to ensure proper liquid retention, gas tightness, thermal insulation and environment safety. | |||||||
| 4.002) 2 No. LNG UNLOADING PUMP HAVING CAPACITY OF 350 LPM VERTICAL CANNED TYPE FOR LNG UNLOADING FROM TANKER NOTE:- Design, Engineering, Manufacturing, Fabrication, Assembly of all pressurized pipeline & piping including with liquid phase, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification Painting, Inspection and Testing at works, Packaging, Transportation and unloading at site, along with foundation bolts, Installation & Commissioning of following FLP Electric Motor driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. 1) FLP Electric Motor with VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. 2) LNG unloading skid with 2 nos. of LNG unloading pump (1 working + 1 standby) which will unload LNG from road tanker to storage tank with minimum 350 LPM flow and approx. 8 – 10 bar (g) differential pressure of LNG (or as required). 3) The unloading skid shall have centrifugal pump suitable for LNG service and shall have a return line for tanker. 4) Supply of SS LNG unloading hoses including with vapour return line hose at LNG tanker unloading bay for connection of LNG tanker to unloading pump skid having design temperature range from -196°C up to +50°C. 5) It also include Supply of SS LNG unloading hoses, cryogenic breakway coupling, insulation flange, hose fall arrest stand post, Dry cryogenic coupling along with with vapour return line hose if required at LNG tanker unloading bay for connection of LNG tanker to unloading pump skid having design temperature range from -196°C up to +50°C. | |||||||
| 5.003) 2 No. LNG TO LCNG HIGH PRESSURE PUMP HAVING CAPACITY OF 35 LPM HORIZONTAL RECIPROCATING PUMP NOTE:- 1) Design, Engineering, Manufacturing, Fabrication, Assembly of all pressurized pipeline & piping including with liquid phase, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification Painting, Inspection and Testing at works, Packaging, Transportation and unloading at site, along with foundation bolts, Installation & Commissioning of following FLP Electric Motor driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. 2) FLP Electric Motor with suitable VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. 3) LNG HP pump skid with 2 nos. (1 working + 1 standby) which will convert LNG to LCNG with 35 LPM flow and approx. pressure of 240 – 255 bar (g). 4) The LCNG pump skid shall have reciprocating pump suitable for LNG service and shall have a return line for tanker. 5) Supply of SS LNG hoses including with vapour return line hose at pump skid having design temperature range from -196°C up to +50°C if required. | |||||||
| 6.004) 2 Nos. LNG MP PUMP HAVING CAPACITY OF 70 LPM (VERTICAL CANNED TYPE) FOR INDUSTRIAL PNG ALONG WITH ALL INTERCONNECTION PIPING ARRANGEMENT. NOTE:- 1) Design, Engineering, Manufacturing, Fabrication, Assembly of all pressurized pipeline & piping including with liquid phase, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification Painting, Inspection and Testing at works, Packaging, Transportation and unloading at site, along with foundation bolts, Installation & Commissioning of following FLP Electric Motor driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. 2) 2 nos. LNG MP pump skid (1working + 1 standby) which will pressurize the LNG from storage system with minimum 70 LPM flow to MP vaporiser and approx. 26 – 27 bar (g) differential pressure of LNG (or as required). 3) FLP Electric Motor with suitable VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. | |||||||
| 7.005) 2 NOS. LNG DISPENSING PUMP HAVING CAPACITY OF 150 LPM (VERTICAL CANNED TYPE) ALONG WITH ALL INTERCONNECTION PIPING ARRANGEMENT. NOTE:- 1) supply & Assembly of all pressurized pipeline & piping required for liquid, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification. 2) FLP Electric Motor with VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. 3) 2 nos. LNG dispensing pump (1working +1 standby) having capacity 150 LPM flow and approx. 12 – 17 bar (g) differential pressure of LNG (or as required). 4) The unloading skid shall have centrifugal pump suitable for LNG service and shall have a return line for tanker. | |||||||
| 8.006) 1 NO. SATURATED VERTICAL FORCED DRAFT TYPE (WITH AIR COOLED MEDIA) VAPORIZER HAVING CAPACITY OF NOTE:- 1) In order to increase the temperature of the cold LNG to saturated temperature before LNG dispenser, along with VFD motor driven FD fan and all necessary accessories. 2) Vaporiser should be designed as per ASME SEC-VIII Div.I/ PED/NFPA-59A/ other inetrnational code. 2) The vaporiser material and design comply as per ASME Boiler and Pressure Vessel Code. 3) Actual flow rate of vaporiser based on ambient & operation hour and same should be decided by OEM for maintaing the required flow capacity. 4) OEM should suitably size of vaporiser based on required flow rate of 150 LPM including with contineous operating correction factors, fluid & other climate correction factor etc. 5) Vaporiser MOC shoul be Aluminium/SS equivalent to ASTM (or) suitable for cryogenic heat transfer application, along with finned tubes. | |||||||
| 9.007) 2 NOS. SATURATED VERTICAL NATIURAL/FORCED DRAFT TYPE (WITH AIR COOLED MEDIA) L P VAPORIZER HAVING CAPACITY OF 500 SCMH NOTE:- 1) In order to increase the temperature for low pressure line along with all necessary accessories. 2) Vaporiser should be designed as per ASME SEC-VIII Div.I/ PED/NFPA-59A/ other inetrnational code. 2) The vaporiser material and design comply as per ASME Boiler and Pressure Vessel Code. 3) Actual flow rate of vaporiser based on ambient & operation hour and same should be decided by OEM for maintaing the required flow capacity. 4) OEM should suitably size of vaporiser based on required flow rate of 500 SCMH including with contineous operating correction factors, fluid & other climate correction factor etc. 5) Vaporiser MOC shoul be Aluminium/SS equivalent to ASTM (or) suitable for cryogenic heat transfer application, along with finned tubes. | |||||||
| 10.008) 1 NOS. LNG DISPENSER HAVING CAPACITY OF 150 LPM ALONG WITH ALL INTERCONNECTION PIPING ARRANGEMENT NOTE:- 1) 'Design, detail engineering, manufacturing, assembly, factory testing, supply of Dual arm LNG dispenser having flow capacity of 150 LPM including packaging, fixing of client Logo in the name of GAIL GAS LTD., handling, transportation of Dispenser, loading, and unloading at sites, documentation, etc., and providing all related services including installation, integration, site acceptance testing, trial run, and commissioning. 2) Providing Maintenance Services during Warranty Period including supply of all spares, providing licensed software & hardware, converters, cables, etc. Complete in all respect defined in the Tender Documents including erection & commissioning spares. The materials shall be delivered as per PO on written intimation. 3) Bidder has to provide all necessary certificates from the statutory authorities like W&M & PESO along with the supply of equipment. Arrangement for On-site Training of Purchaser’s Dispenser operator. (For detail scope of supply Refer SOW & specification). It includes required spares, software, Installation & Commissioning spares as specified in technical specification. 4) LNG dispener equiped with VFD driven LNG pumps, nozzle(s) for fuelling LNG with or without vapour return/recovery hose(s) for fuelling LNG, hose(s) for vapour recovery when not integrated with the fuelling hose, dummy receptacle or parking dock for the nozzle, breakaway device(s) when not in use, flow meter(s) for fuelling & vapour return line, temperature and pressure sensors and transmitters, F&G devices, Mass flow meter, density meter etc. along with pipe work and control valves, including thermal and pressure relief valves, electrical and pneumatic power supply, dispenser cabinet with display monitors for price & qty. start, stop & ESD push button for the LNG dispenser unit. 5) LNG Driver provision for cold or saturated LNG fuelling, Earthing connection, Compatible with all truck brand etc. as per site requirements. | |||||||
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
13 Jan 2026, 2:00 pmClosed
Anil Kumar
Gail Gas ltd
DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LNG STORAGE FACILITY ALONG WITH LNG AND LCNG DISPENSING FACILITY AT MIRZAPUR, UTTAR PRADESH
2025_GAILG_253759_1
GAIL GAS/NOIDA/1539/AK/25-26/57
Open Tender
Miscellaneous Works
Item Rate
1030 days
Noida
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹20 L
Yes
Through VC
9 Apr 2026
11 Dec 2025
14 Jan 2026
11 Dec 2025
13 Jan 2026
17 Dec 2025
16 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LNG STORAGE FACILITY ALONG WITH LNG & LCNG DISPENSING FACILITY AT MIRJAPUR GA | - | - | - | - | - |
| 2 | GROUP-A
SUPPLY OF LNG STORAGE FACILITY ALONG WITH LNG & LCNG DISPENSING FACILITY AT MIRJAPUR GA
Scope includes system design, development of P&ID, piping layout, GAD, in line with PESO rules/ design basis/other applicable guidelines. Scope also includes but is not limited to design, engineering, procurement of materials, inspection, Testing, fabrication, installation, painting and supply of LNG equipments as mentioned below:- | 1 | Lumpsum | - | - | 0.18% |
| 3 | 1) 2 No. 56 KL capacity double-walled vacuum insulated / multi layer super insulated cryogenic LNG storage tank along with all associated equipment piping, instruments and control system & valves.
NOTE:-
Design, Detail Engineering, Fabrication, Assembly, Painting, Inspection, Hydro Testing at works and Leak testing, Packaging, Transportation and unloading at site along with foundation bolts and all required comissioing spares, Installation as per tank spacing requirements and commissioning of Double-walled pearlite in vacuum insulated/multi layer super insulated cryogenic LNG STORAGE TANK of capacity of 56 KL along with all necessary PRV/SSV controls, instruments and other accessories as specified in attached data sheet, system design basis and process flow diagram. GAIL Logo, Heading on Tanks {GAIL GAS LIMITED} and capacity description.
NOTE:-
1) Tank shall be std. features with top/bottom fill lines.
2) Tank should be dual saftey relief system.
3) Stainless steel primary valves along SS piping.
4) Stainless steel vent stack to suitable height with flame arrester requirements as per OISD/PNGRB/PESO norms.
5) Tank MAWP should be 12 kg/cm2-g & design pressure at 18 kg/cm2-g.
6) Durable, Epoxy Based, Polyurethane Finish painting as per standrads suitable for cryogenic applications.
7) vaccume jacketed piping system
8) Pneumatic emergency shut off valves.
9) Tank size should be approx. (H-11.5mtr.* D-3.2 Mtr approx.), however vendor shall suitably size the tank capacity based considering with vapor volume fractions accordingly.
10) LNG filling line, Vapor return line & a recirculation line with adequate instrumentation should be consider.
11) In case of non-availability of flare system, the discharge from safety valve shall be vented to atmosphere at a safe location minimum at an elevation of 3 meter above the nearest working platform for effective dispersion of hydrocarbons as per PNGRB/PESO guidelines.
12) Tank should be designed as per ASME SEC-VIII Div. I/ EN13458-2/ PED/NFPA-59A/NFPA-11 & other inetrnational code & certified by CCOE
13) Epoxy Based, Polyurethane Paint Finish as per paint specification suitable for cryogenic vessel application.
14) The Liquefied Natural gas is stored at about –159°C to –168 °C. LNG tanks are required to be designed to ensure proper liquid retention, gas tightness, thermal insulation and environment safety. | - | - | - | - | - |
| 4 | 2) 2 No. LNG UNLOADING PUMP HAVING CAPACITY OF 350 LPM VERTICAL CANNED TYPE FOR LNG UNLOADING FROM TANKER
NOTE:-
Design, Engineering, Manufacturing, Fabrication, Assembly of all pressurized pipeline & piping including with liquid phase, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification Painting, Inspection and Testing at works, Packaging, Transportation and unloading at site, along with foundation bolts, Installation & Commissioning of following FLP Electric Motor driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
1) FLP Electric Motor with VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
2) LNG unloading skid with 2 nos. of LNG unloading pump (1 working + 1 standby) which will unload LNG from road tanker to storage tank with minimum 350 LPM flow and approx. 8 – 10 bar (g) differential pressure of LNG (or as required).
3) The unloading skid shall have centrifugal pump suitable for LNG service and shall have a return line for tanker.
4) Supply of SS LNG unloading hoses including with vapour return line hose at LNG tanker unloading bay for connection of LNG tanker to unloading pump skid having design temperature range from -196°C up to +50°C.
5) It also include Supply of SS LNG unloading hoses, cryogenic breakway coupling, insulation flange, hose fall arrest stand post, Dry cryogenic coupling along with with vapour return line hose if required at LNG tanker unloading bay for connection of LNG tanker to unloading pump skid having design temperature range from -196°C up to +50°C. | - | - | - | - | - |
| 5 | 3) 2 No. LNG TO LCNG HIGH PRESSURE PUMP HAVING CAPACITY OF 35 LPM HORIZONTAL RECIPROCATING PUMP
NOTE:-
1) Design, Engineering, Manufacturing, Fabrication, Assembly of all pressurized pipeline & piping including with liquid phase, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification Painting, Inspection and Testing at works, Packaging, Transportation and unloading at site, along with foundation bolts, Installation & Commissioning of following FLP Electric Motor driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
2) FLP Electric Motor with suitable VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
3) LNG HP pump skid with 2 nos. (1 working + 1 standby) which will convert LNG to LCNG with 35 LPM flow and approx. pressure of 240 – 255 bar (g).
4) The LCNG pump skid shall have reciprocating pump suitable for LNG service and shall have a return line for tanker.
5) Supply of SS LNG hoses including with vapour return line hose at pump skid having design temperature range from -196°C up to +50°C if required. | - | - | - | - | - |
| 6 | 4) 2 Nos. LNG MP PUMP HAVING CAPACITY OF 70 LPM (VERTICAL CANNED TYPE) FOR INDUSTRIAL PNG ALONG WITH ALL INTERCONNECTION PIPING ARRANGEMENT.
NOTE:-
1) Design, Engineering, Manufacturing, Fabrication, Assembly of all pressurized pipeline & piping including with liquid phase, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification Painting, Inspection and Testing at works, Packaging, Transportation and unloading at site, along with foundation bolts, Installation & Commissioning of following FLP Electric Motor driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
2) 2 nos. LNG MP pump skid (1working + 1 standby) which will pressurize the LNG from storage system with minimum 70 LPM flow to MP vaporiser and approx. 26 – 27 bar (g) differential pressure of LNG (or as required).
3) FLP Electric Motor with suitable VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram. | - | - | - | - | - |
| 7 | 5) 2 NOS. LNG DISPENSING PUMP HAVING CAPACITY OF 150 LPM (VERTICAL CANNED TYPE) ALONG WITH ALL INTERCONNECTION PIPING ARRANGEMENT.
NOTE:-
1) supply & Assembly of all pressurized pipeline & piping required for liquid, gas, vent, Nitrogen purging & instruments line as per OEM & other std. engineering specification.
2) FLP Electric Motor with VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
3) 2 nos. LNG dispensing pump (1working +1 standby) having capacity 150 LPM flow and approx. 12 – 17 bar (g) differential pressure of LNG (or as required).
4) The unloading skid shall have centrifugal pump suitable for LNG service and shall have a return line for tanker. | - | - | - | - | - |
| 8 | 6) 1 NO. SATURATED VERTICAL FORCED DRAFT TYPE (WITH AIR COOLED MEDIA) VAPORIZER HAVING CAPACITY OF
NOTE:-
1) In order to increase the temperature of the cold LNG to saturated temperature before LNG dispenser, along with VFD motor driven FD fan and all necessary accessories.
2) Vaporiser should be designed as per ASME SEC-VIII Div.I/ PED/NFPA-59A/ other inetrnational code.
2) The vaporiser material and design comply as per ASME Boiler and Pressure Vessel Code.
3) Actual flow rate of vaporiser based on ambient & operation hour and same should be decided by OEM for maintaing the required flow capacity.
4) OEM should suitably size of vaporiser based on required flow rate of 150 LPM including with contineous operating correction factors, fluid & other climate correction factor etc.
5) Vaporiser MOC shoul be Aluminium/SS equivalent to ASTM (or) suitable for cryogenic heat transfer application, along with finned tubes. | - | - | - | - | - |
| 9 | 7) 2 NOS. SATURATED VERTICAL NATIURAL/FORCED DRAFT TYPE (WITH AIR COOLED MEDIA) L P VAPORIZER HAVING CAPACITY OF 500 SCMH
NOTE:-
1) In order to increase the temperature for low pressure line along with all necessary accessories.
2) Vaporiser should be designed as per ASME SEC-VIII Div.I/ PED/NFPA-59A/ other inetrnational code.
2) The vaporiser material and design comply as per ASME Boiler and Pressure Vessel Code.
3) Actual flow rate of vaporiser based on ambient & operation hour and same should be decided by OEM for maintaing the required flow capacity.
4) OEM should suitably size of vaporiser based on required flow rate of 500 SCMH including with contineous operating correction factors, fluid & other climate correction factor etc.
5) Vaporiser MOC shoul be Aluminium/SS equivalent to ASTM (or) suitable for cryogenic heat transfer application, along with finned tubes. | - | - | - | - | - |
| 10 | 8) 1 NOS. LNG DISPENSER HAVING CAPACITY OF 150 LPM ALONG WITH ALL INTERCONNECTION PIPING ARRANGEMENT
NOTE:-
1) 'Design, detail engineering, manufacturing, assembly, factory testing, supply of Dual arm LNG dispenser having flow capacity of 150 LPM including packaging, fixing of client Logo in the name of GAIL GAS LTD., handling, transportation of Dispenser, loading, and unloading at sites, documentation, etc., and providing all related services including installation, integration, site acceptance testing, trial run, and commissioning.
2) Providing Maintenance Services during Warranty Period including supply of all spares, providing licensed software & hardware, converters, cables, etc. Complete in all respect defined in the Tender Documents including erection & commissioning spares. The materials shall be delivered as per PO on written intimation.
3) Bidder has to provide all necessary certificates from the statutory authorities like W&M & PESO along with the supply of equipment. Arrangement for On-site Training of Purchaser’s Dispenser operator. (For detail scope of supply Refer SOW & specification). It includes required spares, software, Installation & Commissioning spares as specified in technical specification.
4) LNG dispener equiped with VFD driven LNG pumps, nozzle(s) for fuelling LNG with or without vapour return/recovery hose(s) for fuelling LNG, hose(s) for vapour recovery when not integrated with the fuelling hose, dummy receptacle or parking dock for the nozzle, breakaway device(s) when not in use, flow meter(s) for fuelling & vapour return line, temperature and pressure sensors and transmitters, F&G devices, Mass flow meter, density meter etc. along with pipe work and control valves, including thermal and pressure relief valves, electrical and pneumatic power supply, dispenser cabinet with display monitors for price & qty. start, stop & ESD push button for the LNG dispenser unit.
5) LNG Driver provision for cold or saturated LNG fuelling, Earthing connection, Compatible with all truck brand etc. as per site requirements. | - | - | - | - | - |
stage.html
html • 0.03 MB
techsummary_298845.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Volume_II_I.pdf
Tender Documents • 10.36 MB
vol1.pdf
Tender Documents • 12.81 MB
Volume_II_VI.pdf
Tender Documents • 11.06 MB
Volume_II_V.pdf
Tender Documents • 6.27 MB
Volume_II_III.pdf
Tender Documents • 6.20 MB
Volume_II_IV.pdf
Tender Documents • 7.21 MB
Volume_II_II.pdf
Tender Documents • 5.59 MB
Volume_II_VII.pdf
Tender Documents • 5.26 MB
Volume_II_VIII.pdf
Tender Documents • 4.37 MB
BOQ_298845.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .