Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹2.8 L A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | L1 | |
| 2 | L2₹3.1 L+₹33,665.41 (12.1%) A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | L2 | |
| 3 | L3₹3.3 L+₹55,645.30 (20.0%) A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | L3 | |
| 4 | L4₹3.5 L+₹70,280.01 (25.3%) A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | L4 | |
| 5 | L5₹4.0 L+₹1.2 L (44.0%) A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.). | L5 |
| Sl No | Description | Qty | Unit | AMIT SHARMA SHUBASH NAGAR L3 | Jorbal Singh Kajal L5 | Kamlesh Kumar Sharma L4 | Munish Sharma L1 | Ashwani Vij L2 |
|---|---|---|---|---|---|---|---|---|
| 1 | Civil items | - | - | -40 ₹3,33,871.8 | -28 ₹4,00,646.16 | -37.37 ₹3,48,506.51 | -50 ₹2,78,226.5 Lowest | -43.95 ₹3,11,891.91 |
Tender Value
₹5.6 L
EMD Value
₹11,129
Closing Date
12 Jul 2024, 3:00 pmClosed
AE-C-4
Anubhav Kumar
Assistant Engineer-I, CPWD,
A/R and M/O to GPRA at Longwood Shimla during 2024-25. SH: Repair and reconstruction of damaged retaining wall, repair of front courtyard and repair of damaged sewer line at Fair Holm Shimla (H.P.).
81167
108/2024-25/EE-1/AE-1/Shimla
OPEN
Civil Works - Buildings
NCB
21 days
Shimla, Himachal Pradesh
12 documents required · 12 mandatory
₹11,129
Not Applicable
12 Jul 2024
8 Jul 2024
12 Jul 2024
12 Jul 2024
10 Jul 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 0.89 MB
NIT.pdf
document • 3.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .