Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC P 1 310 D WEBEL COMPLEX TARATALA ROAD BRACE BRIDGE KOLKATA WEST BENGAL 700088 | KOLKATA | KOLKATA | WEST BENGAL | 700088 | ₹2.9 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹2.9 L+₹4,375 (1.52%)Rejected-Finance D 79 DANKUNI HOUSING DANKUNI HOOGHLY 712311 | DANKUNI | HOOGHLY | WEST BENGAL | 712311 | ₹2.9 L+₹4,375 (1.52%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹2.9 L+₹6,466 (2.25%)Rejected-Finance 202 SODEPUR FIRST LANE HARIDEVPUR KOLKATA WEST BENGAL 700082 | KOLKATA | WEST BENGAL | 700082 | ₹2.9 L+₹6,466 (2.25%) | L3 | Rejected-Finance 3RD LOWEST |
| Sl No | Description | Qty | Unit | SEN ELECTRICALS L1 | OM ENTERPRISE L2 | BIECTECH ELECTRICALS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | SUPPLY AND DELIVERY OF 415VOLI, 50 HZ, 3 PHASE/1 PHASE,
ALL COPPER COIL, STAR RATING THREE OR AVOBE, FILLED
WITH R22/R32/R407C/R410A GAS, HIGH WALL SPLIT 3.0 TON AC
MACHINE | 3 | EACH | 80,842 ₹2,42,526 Lowest | 82,055 ₹2,46,165 | 82,621 ₹2,47,863 |
| 2.00 | ERECTION AND INSTALLATION OF BOTH COOLING AND
CONDENSING UNIT FOR 2.5/3.0 TON AT RESPECTIVE
LOCATION ON WALL ALONG TERMINATION OF REFRIGERENT
LINE AND PROVIDING ADEQUATE MECHANICAL SUPPORT BY
S&F OF MS ANGLE IRON STRUCTURE MATCHING WITH
DIMENTION OF ODU. | 3 | EACH | 11,495 ₹34,485 Lowest | 11,667 ₹35,001 | 11,748 ₹35,244 |
| 3.00 | Supplying and fixing 240/415 V MCB of Breaking capacity 10kA & C
characteristics on din rail of existing DBs and necessary connection
Legrand 6-32 A DP | 3 | EACH | 672 ₹2,016 Lowest | 682 ₹2,046 | 687 ₹2,061 |
| 4.00 | Supplying of 1.1 KV. Grade PVC insulated Conductor of following
cables (make: Polycab/ Gloster/Havells/):Size in Sq. mm, No & dia.
of wire in mm , No of Core - 6 1/2.80 3 | 55 | RUNNING METER | 114 ₹6,270 Lowest | 116 ₹6,380 | 117 ₹6,435 |
| 5.00 | Supply 4.0 sqmm 'FR' stranded Copper wire | 40 | METER | 43 ₹1,720 Lowest | 45 ₹1,800 | 47 ₹1,880 |
Tender Value
Refer Docs
EMD Value
₹5,800
Closing Date
26 Oct 2024, 2:00 pmClosed
EXECUTIVE ENGINEER/GRWW
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
SUPPLY, DELIVERY AND INSTALLATION OF 3 NOS. 415 VOLT, 50 HZ, 3 PHASE, HIGH WALL SPLIT 3 TON AC MACHINE FOR FILTER HOUSE LT PANEL ROOM AT WTP-III, GRWW.
2024_KMC_759545_1
KMC/EE/WS/GRWW/24-25/PH-II/19
Open Tender
Electrical Work/ Equipment
Item Rate
12 days
WTP-III, GRWW.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,800
29 Jul 2026
28 Sept 2024
28 Oct 2024
28 Sept 2024
26 Oct 2024
28 Sept 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .