| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.8 L+₹22,883.35 (6.43%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹4.1 L+₹54,100.27 (15.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Shree Jayabharatham infra private Limited L3 | RAMACHANDRAN R L1 | MUTHIAH MUTHURAJ L2 |
|---|---|---|---|---|---|---|
| 1.01Construction of Cremation Shed S.Thiruvengadapuram Village in Melarajakularaman Panchayat at Under VPGF 2026-27 | ||||||
| 1.02 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 8.89 | Cum | 250.59 ₹2,227.75 Lowest | 260 ₹2,311.4 | 270 ₹2,400.3 |
| 1.03 | Collection and supply of M.Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. | 1.22 | Cum | 1,650.1 ₹2,013.12 Lowest | 1,700 ₹2,074 | 1,740 ₹2,122.8 |
| 1.04 | Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 11.69 | Cum | 215.68 ₹2,521.3 Lowest | 220 ₹2,571.8 | 230 ₹2,688.7 |
| 1.05 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges. | 5.04 | Cum | 5,187.13 ₹26,143.14 Lowest | 5,400 ₹27,216 | 5,465 ₹27,543.6 |
| 1.06 | Centering charge for RCC works including all cost and conveyance all labour charges etc., complete. | 14.9 | Sqm | 520.13 ₹7,749.94 Lowest | 545 ₹8,120.5 | 550 ₹8,195 |
| 1.07 | Centering charge for RCC works including all cost and conveyance all labour charges etc., complete. | 75 | Sqm | 1,040.25 ₹78,018.75 | 980 ₹73,500 Lowest | 1,250 ₹93,750 |
| 1.08 | Supplying and fabrication of steel of RCC works including all cost and conveyance and all labour charges such as cutting bending tying and placed in position. | 6.28 | Qtl | 8,727.26 ₹54,807.19 Lowest | 9,150 ₹57,462 | 9,200 ₹57,776 |
| 1.09 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 1.56 | Cum | 5,761.88 ₹8,988.53 Lowest | 6,060 ₹9,453.6 | 6,100 ₹9,516 |
| 1.10 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 6.68 | Cum | 8,753.32 ₹58,472.18 Lowest | 9,210 ₹61,522.8 | 9,250 ₹61,790 |
Tender Value
₹4.4 L
EMD Value
₹4,370
Closing Date
28 Jul 2026, 3:00 pmClosed
Block Development officer
Union office,Rajapalayam
Construction of Cremation Shed S.Thiruvengadapuram Village in Melarajakularaman Panchayat at Under VPGF 2026-27
2026_RDTN_685128_1
B1/1229/2026 Dt 11.06.2026
Open Tender
Civil Works
Item Rate
120 days
Rajapalayam
Refer Tender Notice
2 documents required · 2 mandatory
₹0
₹4,370
30 Sept 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of Cremation Shed S.Thiruvengadapuram Village in Melarajakularaman Panchayat at Under VPGF 2026-27 | - | - | - | - |
| 1.02 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | - | Cum | 131.89 | - |
| 1.03 | Collection and supply of M.Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. | 1 | Cum | 5,460.14 | ₹5,454.68 |
| 1.04 | Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 1 | Cum | 329.24 | ₹328.91 |
| 1.05 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges. | - | Cum | 6,211.58 | - |
| 1.06 | Centering charge for RCC works including all cost and conveyance all labour charges etc., complete. | - | Sqm | 569.73 | - |
| 1.07 | Centering charge for RCC works including all cost and conveyance all labour charges etc., complete. | - | Sqm | 9,186.59 | - |
| 1.08 | Supplying and fabrication of steel of RCC works including all cost and conveyance and all labour charges such as cutting bending tying and placed in position. | - | Qtl | 9,072.95 | - |
| 1.09 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | - | Cum | 2,325.17 | - |
| 1.1 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 1 | Cum | 2,325.17 | ₹2,322.84 |
stage.html
html • 0.02 MB
finance_823620.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_823620.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .