Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.9 LAccepted-AOC ATHANOOR NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | L1 | Accepted-AOC Accepted | |
| 2 | L2₹82.3 L+₹44,190 (0.54%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | MSV Engineering Construction and Co. L1 | ABS and Company L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 615 | M3 | 132 ₹81,180 Lowest | 135 ₹83,025 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 615 | M3 | 5,456 ₹33,55,440 Lowest | 5,500 ₹33,82,500 |
| 3.00 | Centering for sides and soffits of R.C.C Slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. Complying with std specifications Side Centering | 180 | m2 | 330 ₹59,400 Lowest | 350 ₹63,000 |
| 4.00 | Plain Cement Concrete 1:1 1/2 : 3 Mix (one part cement, One and Half part Msand and three part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications. | 615 | m3 | 7,532 ₹46,32,180 Lowest | 7,550 ₹46,43,250 |
| 5.00 | Providing Bitumen felt 15mm thick for Expansion joint including cost and conveyance of all other labour and material charges to site etc., complete. | 123 | m3 | 485 ₹59,655 Lowest | 490 ₹60,270 |
Tender Value
Refer Docs
EMD Value
₹99,000
Closing Date
6 Mar 2026, 3:00 pmClosed
Executive Officer
Pillanallur Town Panchayat
Construction of CC Road at Ward No.3 Vellatharai Odai Near muniyappan Kovilstreet II, Ward No.8 1 St Road to 2nd Road North side III rd, 1 St Road to 2nd Road North side Ivth,Ward No.9 East west Main Street to Cross Street I . East west MainStreet
2026_DTP_667995_1
48/2026
Open Tender
Civil Works
Works
180 days
Pillanallur Town Panchayat
CC Road
2 documents required · 2 mandatory
₹0
₹99,000
Yes
Pillanallur Town Panchayat
9 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
27 Feb 2026 - 6 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 615 | M3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 615 | M3 | - | - |
| 3 | Centering for sides and soffits of R.C.C Slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. Complying with std specifications Side Centering | 180 | m2 | - | - |
| 4 | Plain Cement Concrete 1:1 1/2 : 3 Mix (one part cement, One and Half part Msand and three part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications. | 615 | m3 | - | - |
| 5 | Providing Bitumen felt 15mm thick for Expansion joint including cost and conveyance of all other labour and material charges to site etc., complete. | 123 | m3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_802591.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .