Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.0 LAccepted-AOC | ₹61.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹61.5 LRejected-Finance | ₹61.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹63.1 LRejected-Finance | ₹63.1 L | L3 | Rejected-Finance L3 |
Tender Value
₹94.6 L
EMD Value
₹1.9 L
Closing Date
18 Mar 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of RCC Drain for solving water logging problem in Village-Makanpur Bangar, YEA WC-06
2026_YEIDA_1122864_5
YEA/GM(PROJECT)/2026/480 DT-27/02/2026
Open Tender
Civil Works
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,127
₹1.9 L
20 Jul 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechnical means (hydraulic excavation) manual means in foundation trenches or drain (not exceeding 1.5 m in width) or 10 Sqm on plain including dressing of sides remaining bottom, lift upto1.5 m including getting out the excavated earth and disposal of surplus excavated soil as per direction of engg. in charge with in lead upto 50 m DAR 2.8.1 | 1 | Cum | 1 | ₹1 |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 1 | Cum | - | - |
| 3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (DAR 5.1.2/ UPPWD SOR 2020) | |||||
| 4Reinforced Cement concrete work in walls (any Thickness ), including attatched Pilasters, Buttresses, plinth and String courses , fillets , columns, pillars piers, abutments , posts and struts etc. upto Floor V Level, Excluding the cost of Centring , Shuttring, Finishing and Reinforcement: (Cast in situ) 1:1.5:3 (1 Cement : 1.5Coarse Sand: 3 Graded Stone Aggregete 20mm Nominal Size) (DAR 5.2.2/ UPPWD SOR 2020) | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form for all heights : | |||||
| 5.01 | Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | - | Sqm | - | - |
| 5.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (DAR/5.9.2/Based on UPPWD/SOR-2020)) | - | Sqm | - | - |
| 5.03 | Suspended floors, roofs, landings, balconies and access platform (DAR/5.9.3/Based on UPPWD/SOR-2020)) | - | Sqm | - | - |
| 5.04 | Edges of slabs and breaks in floors and walls: Under 20 cms wide. (DAR/5.9.16.1/Based on UPPWD/SOR-2020) | - | Mtr | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more./Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020)) | - | Kg. | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
5.pdf
Tender Documents • 1.41 MB
BOQ_2091487.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].