| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹12.6 L−₹1.1 Cr (89.5%)Rejected-AOC | ₹12.6 L−₹1.1 Cr (89.5%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.3 Cr
EMD Value
₹1.4 L
Closing Date
17 May 2023, 3:00 pmClosed
The Addl. Collector/ Project Director, DRDA, DPI
DRDA, Dharmapuri
Dharmapuri District - Upgradation / Strengthening of the road 2 Nos. in Package No. TN04-64 MGSMT / 2022-2023 Kadathur Block P64
2023_RDTN_308813_1
Roc.No.1231/2023/R2 Dt.03.04.2023 MGSMT P64
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹1.4 L
7 Jul 2023
1 May 2023
17 May 2023
1 May 2023
17 May 2023
1 May 2023
Amount
Strengthening to the Road from A;.Pallipatti - Morappur road to Ambalapatty Via C.Ayyampatty Km.0/0-2/150 H/o. Basuvapuram
Clearing Light jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavation and depositing on bank with initial lead of 10Metre lift of 2.00Metres in hard gravel soil including cost and conveyance of all and labour charges ete., complete as per SS 20A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT & H speciications clause 507 complete in all respects.
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and Fixing of KM Stone
Supply and Fixing of HM Stone
Provision for 90 Cm equilateral Triangle Sign Board
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strengthening of the road from Thalanatham to T.Ayyampatty Road H/o. Thalanatham
Clearing Light jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavation and depositing on bank with initial lead of 10Metre lift of 2.00Metres in hard gravel soil including cost and conveyance of all and labour charges ete., complete as per SS 20A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT & H speciications clause 507 complete in all respects.
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and Fixing of KM Stone
Supply and Fixing of HM Stone
Provision for 60 Cm equilateral Triangle Sign Board
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MNS Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .