| 1 | 1₹8.8 CrAccepted-AOC | ₹8.8 Cr | 1 | Accepted-AOC Accepted |
| 2 | 1₹8.8 CrRejected-AOC JAWAHAR NAGAR H N 41 P O KHANAPARA P S DISPUR DIST KAMRUP M PIN 781022 | KAMRUP METRO | ASSAM | 781022 | ₹8.8 Cr | 1 | Rejected-AOC Not accepted |
| 3 | 1₹8.8 CrRejected-AOC | ₹8.8 Cr | 1 | Rejected-AOC Not accepted |
Tender Value
₹9.8 Cr
EMD Value
₹19.6 L
Closing Date
7 Nov 2023, 2:00 pmClosed
Chief Engineer, PWD(Roads), Assam
O/o the Chief Engineer, PWD(Roads), Assam
Construction of Alternate Road leading to State Guest House No. 1 at Koinadhara Hill under SOPD(G) for the year 2023-24
2023_PWD_33246_1
CE/CW/24/2023-24-Alt Koinadhara
Open Tender
Civil Works – Roads
Item Rate
273 days
Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹19,647
₹19.6 L
Yes
5 Apr 2024
25 Oct 2023
7 Nov 2023
25 Oct 2023
7 Nov 2023
25 Oct 2023
25 Oct 2023 - 27 Oct 2023
Amount
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness., in non thorny jungle
Cutting of Trees, including Cutting of Trunks, Branches and Removal of stumps(Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit., girth above 300 mm to 600 mm
Excavation in ordinary Soil using hydraulic excavator and tippers with disposal upto 1000 m by Manual Means. (a)(Excavation for roadway in soil using using hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross sections and transporting to the embankment location with a lift upto 1.50 m and lead upto 000 metres.
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2( Including cost of testing of materials at site and laboratory as directed by the deptt.
('Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Granular Sub -base with Well Graded Material (Table 400.1) (A) By Mix in place method, Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii ) For Grading II Material
WBM Grading 2 Using stone sceening Type- B 11.2mm for Gr. III, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means.
WBM Grading 3 Using stone sceening Type- B 11.2mm for Gr. III, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means.
Prime Coat: Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
Tack Coat :Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) (A) With 60/70 or VG -30 grade bitumen (ii) for Grading II (19 mm nominal size)
Bituminous Concrete: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) (A) With 60/70 or VG -30 grade bitumen (ii) for Grading II (13 mm nominal size)
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface ( Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications)
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year.
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres), RCC
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.), PCC Grade M-15
Supplying, fitting and placing TMT( Fe-500 D) bar reinforcement in foundation complete as per drawing and technical specifications Clause,. (a) With other make ISI marked TMT rebar Secondary Producer
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 With Crushed stone (IV) RCC Grade 20 (i) For height upto 5 m
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 With Crushed stone (IV) RCC Grade 20 (i) For height upto 5 m
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (i) Sandy materials
Providing drividing with hydraulic pilling rigs with power units and installation driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete.
Earth work in excavation by mechanical means (hydraulic excavator/manual means over areas) exceeding 30 cm in depth, 1.50 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Deptt.
Filling available excavated earth (excluding rock) in trenches , plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 m and lift upto 1.50 m as directed by Deptt.
Brick work with common burnt clay FPS (non modular) bricks of class designation 7.5 in foundation and plinth in Cement morter1:4 complete as directed by Deptt.
Providing and laying in position cement morter of specified grade excluding the cost of centering and shuttering up to plinth level in 1:3:6 as directed by the Deptt.
Stel reinforcement for RCC work including straigthening, cutting, bending, placing in position and binding all complete upto plinth level.
Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns etc. for mass concrete complete.
Centering and shuttering including strutting, propping etc. and removal of form for columns, pillars, piers, abutments, post and struts complete.
Centering and shuttering including strutting, propping etc. and removal of form work for walls including attached pillars, butressess, plinth and string courses etc. complete
Centering and shuttering including strutting, propping etc. and removal of form work for lintels, beams, plinth beams, girders, bresumers and cantilever etc. complete
Providing and laying in position specified grade of RCC excluding the cost of centering, shuttering, finishing and reinforcement- all works upto plinth level, 1:1.5:3 complete as directed
RCC work in walls (any thickness) including attached pilasters, butressess, plint and string courses, filtets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement complete as directed
Brick work with common burnt clay FPS bricks of class designation 7.5 in super structure above plinth level upto floor V level in all shapes and sizes in CC 1:4 complete as directed
12 mm Cement plaster on the rough side of single or half brick wall of mix complete as directed
15 mm Cement plaster on the rough side of single or half brick wall of mix complete as directed
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade in wall
Providing, fitting, fixing of MS grill of required pattern in frames of windows etc. with MS flats, square or round bars etc. including priming coat with approved steel primer all complete & as directed by Deptt.
Construction of gate all complete & as directed by Deptt.
Providing, fitting, fixing & installation of illumination of road complete & as directed by Deptt.
North East Contractors Pvt. Ltd.
Jayanti Contractors and Engineers Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .