Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.6 LAccepted-AOC | ₹10.6 L | 1 | Accepted-AOC AOC |
Tender Value
₹11.5 L
EMD Value
₹1.1 L
Closing Date
13 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
C.D.-2, P.W.D., AGRA
Renewal with General Repair From Defence Colony B Block, Kirti Nagar to Chawali Primary School.
2026_CEAGR_1133430_1
884/10A/2025-26 dt 29.03.2026
Open Tender
Civil Works
60 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹770
₹1.1 L
Yes
AGRA
25 May 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects Grading - II 19 mm (Nominal Size).(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Cum | - | - |
Providing and applying tack coat with bitumen VG-10 using Bitumen Pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Sqm | - | - | |
Providing and laying bituminous concrete with higher capacity 120 TPH type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Cum | - | - | |
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transportings to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_2115659.xls
BOQ • 0.32 MB
T1-.pdf
Tender Documents • 1.44 MB
Download all tender documents and submit your bid