Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.3 L+₹96,657.86 (15.2%)Admitted-Fee/PreQual/Technical/Finance | ₹7.3 L+₹96,657.86 (15.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.5 L+₹1.1 L (18.0%)Admitted-Fee/PreQual/Technical/Finance | ₹7.5 L+₹1.1 L (18.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.8 L+₹1.4 L (22.4%)Admitted-Fee/PreQual/Technical/Finance | ₹7.8 L+₹1.4 L (22.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.8 L+₹1.4 L (22.4%)Admitted-Fee/PreQual/Technical/Finance 20 SOODAMANI NAGAR KARAIKUDI SIVAGANGAI 630003 | SIVAGANGA | TAMIL NADU | 630003 | ₹7.8 L+₹1.4 L (22.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MALLIKA & CO L7 | ANNAMALAI & CO L2 | CKARNAN L4 | SARATHA & CO L1 | KANNAN AND CO L3 | M SHANMUGASUNDARAM L8 | B VASANTHA L6 | D SENTHILKUMAR L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 16 | M3 | 204 ₹3,264 | 176 ₹2,816 | 211 ₹3,376 | 180 ₹2,880 | 150 ₹2,400 Lowest | 200 ₹3,200 | 187.22 ₹2,995.52 | 187 ₹2,992 |
| 2.00 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 7 | M3 | 4,650 ₹32,550 | 4,408 ₹30,856 | 3,600 ₹25,200 Lowest | 4,517 ₹31,619 | 4,200 ₹29,400 | 5,031 ₹35,217 | 4,688.22 ₹32,817.54 | 4,685 ₹32,795 |
| 3.00Supply and erection of Centering for soffits of plane surface like lintels, beams ,etc.,including strutting 1.10m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - | |||||||||||
| 3.01 | Kerb Wall | 61.2 | M2 | 240 ₹14,688 | 262 ₹16,034.4 | 218 ₹13,341.6 Lowest | 267 ₹16,340.4 | 240 ₹14,688 | 294 ₹17,992.8 | 277.53 ₹16,984.84 | 277 ₹16,952.4 |
| 3.02 | Drain | 62.4 | M2 | 402 ₹25,084.8 | 392 ₹24,460.8 | 436 ₹27,206.4 | 401 ₹25,022.4 | 402 ₹25,084.8 | 294 ₹18,345.6 Lowest | 416.3 ₹25,977.12 | 416 ₹25,958.4 |
| 3.03 | Culvert | 5.52 | M2 | 600 ₹3,312 | 522 ₹2,881.44 | 436 ₹2,406.72 | 534 ₹2,947.68 | 555 ₹3,063.6 | 294 ₹1,622.88 Lowest | 555.07 ₹3,063.99 | 555 ₹3,063.6 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 28 | M3 | 6,090 ₹1,70,520 | 5,571 ₹1,55,988 | 5,289 ₹1,48,092 Lowest | 5,708 ₹1,59,824 | 6,000 ₹1,68,000 | 5,986 ₹1,67,608 | 5,924.77 ₹1,65,893.56 | 5,922 ₹1,65,816 |
| 5.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 38 | Kg | 78 ₹2,964 | 74 ₹2,812 | 71 ₹2,698 | 75.3 ₹2,861.4 | 60 ₹2,280 Lowest | 83 ₹3,154 | 78.17 ₹2,970.46 | 78 ₹2,964 |
| 6.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 0.5 | M3 | 8,700 ₹4,350 | 7,377 ₹3,688.5 | 6,000 ₹3,000 Lowest | 7,561.4 ₹3,780.7 | 8,700 ₹4,350 | 8,404 ₹4,202 | 7,847.24 ₹3,923.62 | 7,843 ₹3,921.5 |
| 7.00 | Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers. | 45 | M3 | 708 ₹31,860 | 664 ₹29,880 Lowest | 1,440 ₹64,800 | 681 ₹30,645 | 753 ₹33,885 | 1,700 ₹76,500 | 706.72 ₹31,802.4 | 706 ₹31,770 |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
18 Aug 2026, 3:00 pmClosed
COMMISSIONER
CORPORATION OFFICE, KARAIKUDI
Providing Vehicle Shed in Rastha Compost Yard in Karaikudi City Municipal Corporation.
2026_MAWS_689363_6
2649/2026/E1
Open Tender
Civil Works
Works
90 days
KARAIKUDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
18 Aug 2026
29 Jul 2026
18 Aug 2026
30 Jul 2026
18 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 16 | M3 | 99 | ₹1,584 |
| 2 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 7 | M3 | 100 | ₹700 |
| 3Supply and erection of Centering for soffits of plane surface like lintels, beams ,etc.,including strutting 1.10m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - | |||||
| 3.01 | Kerb Wall | 61.2 | M2 | 102 | ₹6,242.4 |
| 3.02 | Drain | 62.4 | M2 | 103 | ₹6,427.2 |
| 3.03 | Culvert | 5.52 | M2 | 104 | ₹574.08 |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 28 | M3 | 105 | ₹2,940 |
| 5 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 38 | Kg | 106 | ₹4,028 |
| 6 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 0.5 | M3 | 107 | ₹53.5 |
| 7 | Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers. | 45 | M3 | 108 | ₹4,860 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_828655.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .