Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC WARD 30 136K NEAR KUMHAR HOUSE ROOM NO 743 KACHANI DIST SINGRAULI MP 486887 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486887 | L1 | Accepted-AOC RECOMMENDED BY TC | |
| 2 | L2₹6.4 L+₹59,023.60 (10.2%)Rejected-Finance | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹6.4 L+₹60,463.20 (10.4%)Rejected-Finance | L3 | Rejected-Finance NOT L1 | |
| 4 | L4₹8.6 L+₹2.8 L (49.0%)Rejected-Finance DUDHICHUA FOREST NURSARY KHADIA P O SHAKTINAGAR DISTT SONEBHADRA U P 231222 | KHADIA | SONEBHADRA | UTTAR PRADESH | 231222 | L4 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹11,100
Closing Date
18 May 2023, 11:00 amClosed
GM (Excavation) , Dudhichua Project
Office of the GM (Excavation) , Dudhichua Project PO Khadia ,Distt. Sonebhadra, UP - 231222
Offloading work to outside agency towards Collection of new spares and lubricants from RSDCH and Collection of burnt oil and old spares from Dozer Section and Deposition to RSDCH for a period of 2 years
2023_NCL_278509_1
DCH/GM (Excv)/Tender /Dozer/2023-24/08
Open Tender
Excavation Department Work
Item Rate
730 days
NCL, DUDHICHUA PROJECT
Please refer Tender documents
5 documents required · 5 mandatory
₹11,100
30 Jun 2023
6 May 2023
19 May 2023
6 May 2023
18 May 2023
8 May 2023
6 May 2023 - 15 May 2023
Amount
SCOPE OF WORK for complete work 1. Collection of burnt oil from various equipment like dozers, pay-loaders, motor graders, excavators & wheel dozers under break-down / maintenance and filling the burnt oil in drum and return to RS/DCH. 2. Collection of fresh lubricants and industrial gas cylinders from RS/DCH. 3. Deposition of old spares like scrap / failed sub-assemblies, filters, worn-out cutting edges, end bits, empty gas cylinders, failed hoses, etc. to RS/DCH. 4. Collection of new spares like sub-assemblies, filters, cutting edges, end bits, hoses, etc. from RS/DCH to Dozer Section/DCH. 5. Stacking of machine components/items, handling and cleaning of spares at Dozer Section/DCH. • Firm has to do various activities of the job (listed as above) on daily basis (excluding Sundays and paid holidays) for a period of 610 days / 2 years. • Work has to be carried out in 1 shift per day only. • The contractor has to provide minimum 02 nos. unskilled labour per day. • All the safety gadgets to be provided by the contactor on its own to the manpower engaged in work. • LABOUR PAYMENT THROUGH “CLIP” PORTAL IS TO BE ENSURED BY THE BIDDER.
Total cost including Labour charge, contractor profit, CMPF/EPF & Pension (Exclusive of GST) for complete job as per SCOPE OF WORK & NIT
Total impact of GST for the purpose of CTC
MOTIKSHA ASSOCIATES
STRONG FABRICATORS
M/s Ram Das
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_288326.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .