Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹1.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.1 LAccepted-Finance 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 UDYAM MP 10 0044621 | BHOPAL | MADHYA PRADESH | 462001 | ₹1.1 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 | R K ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-I. | 1 | Nos | 26,595 ₹26,595 | 28,402 ₹28,402 |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-1A & 1B. | 1 | Nos | 13,297 ₹13,297 | 14,201 ₹14,201 |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT-I. | 1 | Nos | 28,660 ₹28,660 | 30,607 ₹30,607 |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | 9,553 ₹9,553 | 10,202 ₹10,202 |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 9,553 ₹9,553 | 10,202 ₹10,202 |
| 6.00 | Charges for Complete cleaning washing of Generating Transformer-I LAS porcelain housings, support insulators, GT HV Bushings, radiator banks & UAT 1A, 1B | 1 | Nos | 13,503 ₹13,503 | 14,421 ₹14,421 |
| 7.00 | CRC 500ml | 2 | Nos | 406 ₹812 | 433 ₹866 |
| 8.00 | Bolt & Nuts various sizes | 4 | Kgs | 155 ₹620 | 165 ₹660 |
| 9.00 | Cost of consumables ( Lumsum) | 1 | Nos | 1,638 ₹1,638 | 1,749 ₹1,749 |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
20 Feb 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-1 Unit 1-Dismantling and reassembling of HTLT Terminal links of Generator Transformer-I,UAT 1 A UAT 1B for conducting statutory testing of TG GT-I during annual Overhaul-2026 of Unit-I
2026_EB_651943_1
CE-MTPSI-SE-ES-EMI-OT125-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,000
Yes
11 Mar 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-I.
Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-1A & 1B.
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT-I.
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
Charges for Complete cleaning washing of Generating Transformer-I LAS porcelain housings, support insulators, GT HV Bushings, radiator banks & UAT 1A, 1B
CRC 500ml
Bolt & Nuts various sizes
Cost of consumables ( Lumsum)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_781750.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid